Attachment 001 Schedule Of Items.pdf
PDF 108 KB Posted
- Solicitation number
- 12445124B0008
About this file
This document appears to be an Attachment 001 - Schedule of Items for a federal contract opportunity related to the renovation of the Shady Lake Recreation Area in the Ouachita National Forest in Arkansas.
The project scope includes the repair, replacement, or demolition of various site features such as roads, parking lots, walkways, a bathhouse, fishing pier, utilities, and site furnishings. Key requirements include providing labor, tools, and equipment to complete the project per local, state, and national codes. The solicitation is set aside 100% for small businesses under NAICS code 238910 (Site Preparation Contractors). The magnitude of the project is between $1-5 million. Relevant dates include a site visit/pre-bid conference on 4/25/2024, last date for questions on 5/3/2024, and bid submittal deadline of 5/15/2024. Award will be made to the lowest priced responsive/responsible bidder. The period of performance is 150 days from the notice to proceed.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ouachita National Forest Shady Lake Recreational Area Loop A Solicitation# 1244512R0008
DATE:
Item Extension
Deconstruction of plumbing fixture Moving Equipment, Dryer and Washer Deconstruction of wood components Structure Demolition - Grills, Picnic Tables, Vault Toilet, ETC.)
Pavement Removal Sidewalk Removal
CY $___________
Rough Carpentry Allowance Wood Siding Repair
Surface prep, scraping, sanding $___________ Paints & Coatings, siding. $___________ Concrete Water Storage Tank Painting/Lining $
SPECIALITIES
ADA Signage $___________
PLUMBING
Lavatory, rough-in supply $___________ Copper Pipe, Type L $___________ Water heater - selective demolition $___________ Water heater, reinstallation $___________ Facility Water Distribution - Hydrants $
EA
EA
Subtotal (Plumbing Work) $
DIVISION 26 - ELECTRICAL
26 05 05 Branch meter devices, socket, 200 A, 2 meter, electrical demolition, remove (Main 1.0 $__________ $____________________ 26 05 05 Control station, NEMA 1, electrical demolition, remove (Main building) 1.0 $__________ $____________________
22 00 00 EA 1 $_______________
22 00 00 EA 1 $_______________
22 11 00 EA 9 $_______________
DIVISION 22 -
22 00 00 EA 1 $_______________
22 00 00 LF 30 $_______________
DIVISION 10 -
10 14 00 EA 2 $_______________
Subtotal (Specialities Work)
09 06 00 SF 5,750 $__________________
09 97 24 SF 770 $__________________
Subtotal (Finishes Work)
06 20 00 SF 225 $__________ $___________________
Subtotal (Wood, Plastics, and Composites Work) $___________________
DIVISION 09 - FINISHES
09 01 90.5 SF 5,750 $__________________
Subtotal (Concrete Work
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 LS 1 $__________ $___________________
Subtotal (Existing Conditions Work)
DIVISION 03 - CONCRETE
03 30 00 Structural concrete (3000 psi), 18"Wx9"D, reinforced,concrete, placing and finishing 2 $_____________
02 41 19 SF 21,650 $__________ $___________________
02 41 19 SF 550 $__________ $___________________
02 41 00 SF 225 $__________ $_________________
02 41 16 LS 1 $_________ $__________________
02 41 00 EA 1 $__________ $_________________
02 41 00 EA 2 $__________ $_________________
DIVISION 1 - GENERAL CONDITIONS
Mobilization LS 1 $__________ $____________________
DIVISION 02 - EXISTING CONDITIONS
Section Unit Quantity Unit Cost
PROJECT:
CONTRACTOR:
EA
EA
EA
EA
EA
EA
CLF
CLF
CLF
CLF
CLF
CLF
CLF
CLF
CLF
CLF
EA
EA
EA
EA
LF
LF
LF
LF
LF
EA
EA
Extension
DIVISION 31- EARTHWORK
26 29 23 Variable frequency drives, enclosed, 460 volt, 10 HP motor size, NEMA 1 EA 2.0 $__________ Subtotal (Electrical Work) $
26 28 16 Safety switches, heavy duty, 3 pole, fusible, 240 volt, 400 amp, NEMA 3R EA 1.0 $__________ 26 28 16 Safety switches, heavy duty, 3 pole, nonfusible, 600 volt, 30 amp, NEMA 1 EA 1.0 $__________
26 27 16 Enclosure panels, 42" x 30", NEMA 12 & 4 EA 1.0 $__________ 26 28 13 Fuses, dual element, time delay, 250 V, 400 amp EA 2.0 $__________
26 24 16 Circuit breakers, bolt-on, 22 k A I.C., 2 pole, 240 volt, 70-225 amp EA 3.0 $__________ 26 27 13 Meter trans-socket, 13 terminal, 3 CT mounts, 400 A EA 1.0 $__________
26 05 33 Field Install Pag Mount Kit for concrete slab (Milbank K5410 or equal with labor EA 9.0 $__________ 26 24 16 Circuit breakers, bolt-on, 10 k A I.C., 2 pole, 240 volt, 80-100 amp EA 2.0 $__________
26 05 33 Unmetered RV Pad Mount Pedestal 50/30A/20A GFCI (Milbank U5210-XL-75 or EA 9.0 $__________ 26 05 33 Unmetered RV Pad Mount Pedestal Labor EA 9.0 $__________
Section Item Unit Quantity Unit Cost
26 05 33 Pull boxes, steel, type SC, raintight & weatherproof, 16" L x 16" W x 6" D, NEMA 3R 2.0 $__________ $____________________
26 05 33 Electric metallic tubing (EMT), 3/4" diameter, to 10' high 65.0 $__________ $____________________ 26 05 33 Pull boxes, steel, type SC, raintight & weatherproof, 30" L x 24" W x 12" D, NEMA 3R 1.0 $__________ $____________________
26 05 33 PVC conduit, schedule 40, 1-1/4" diameter, to 10' H, incl terminations, fittings, & 20.0 $__________ $____________________ 26 05 33 PVC conduit, schedule 40, 2-1/2" diameter, to 10' H, incl terminations, fittings, & 300.0 $__________ $____________________
26 05 33 Rigid galvanized steel conduit, 3" diameter, to 10' 10.0 $__________ $____________________ 26 05 33 PVC conduit, schedule 40, 1" diameter, to 10' H, incl terminations, fittings, & support 20.0 $__________ $____________________
26 05 26 5/8"x10' Copper Clad Steel Grounding Electrode 2.0 $__________ $____________________ 26 05 26 5/8" Ground Rod Clamps 11.0 $__________ $____________________
26 05 19 Panelboards, 1 phase 3 wire, main circuit breaker, 120/240 V, 400 amp, 42 circuits, 2.0 $__________ $____________________ 26 05 26 5/8"x8' Copper Clad Steel Grounding Electrode 9.0 $__________ $____________________
26 05 19 Wire, aluminum, stranded, 600 volt, 1/0, type XHHW 2.0 $__________ $____________________ 26 05 19 Wire, aluminum, stranded, 600 volt, 250 kcmil, type XHHW 10.0 $__________ $____________________
26 05 19 Wire, copper, solid, 600 volt, #10, type THWN-THHN 0.5 $__________ $____________________ 26 05 19 Wire, copper, stranded, 600 volt, #8, type THWN-THHN 1.5 $__________ $____________________
26 05 19 Wire, copper, stranded, 600 volt, 3/0, type THWN-THHN 27.0 $__________ $____________________ 26 05 19 Wire, copper, solid, 600 volt, #12, type THWN-THHN 1.5 $__________ $____________________
26 05 19 Wire, copper, stranded, 600 volt, #3, type THWN-THHN 0.1 $__________ $____________________ 26 05 19 Wire, copper, stranded, 600 volt, #2, type THWN-THHN 3.0 $__________ $____________________
26 05 19 Wire, copper, stranded, 600 volt, #4, type THWN-THHN 0.6 $__________ $____________________ 26 05 19 Wire, copper, stranded, 600 volt, #6, type THWN-THHN 9.0 $__________ $____________________
26 05 05 Safety switches, 250 or 600 V, 200 amp, remove, including disconnection of wire & 1.0 $__________ $____________________ 26 05 05 Panelboards, 3 wire, 120/240 V, 200 amp, electrical demolition, remove (Main building) 1.0 $__________ $____________________
26 05 05 Weatherhead/mast, 2" diameter, electrical demolition, remove 1.0 $__________ $____________________ 26 05 05 Meter socket, 4 terminal, electrical demolition, remove 1.0 $__________ $____________________
26 05 05 Controller, enclosed, 30 A, NEMA 1, electrical demolition, remove (Main building) 1.0 $__________ $____________________ 26 05 05 Safety switches, 250 or 600 V, 30 amp, electrical demolition, remove (Main building) 1.0 $__________ $____________________
31 10 00 2.75 31 23 16 1,200 31 23 23 6,500 $
32 05 16 2,304 32 05 16 6,475 32 12 16 28,750 32 13 13 655 32 13 13 9 32 17 13 23 32 17 23 230 32 17 23 45 32 91 13 2,350 32 91 19 1 $
33 05 14 4 33 05 14 1 33 11 16 1,210 33 31 00 1,370 33 31 00 2 33 32 19 1 33 36 00 1 33 42 13 106 33 42 13 127 $
SUMMARY
TOTAL COST
Culvert Pipe - 18" Reinforced Concrete LF $__________________ Subtotal (Utilities Work)
Public Utility Wastewater Pumping Stations LS $__________________ CXT Instaillation LS $__________________ Culvert Pipe - 12" Reinforced Concrete LF $__________________
Site Water Utility Distribution Piping LF $__________________ Sanitary Utility Sewage Piping LF $__________________ Sanitary Force Main Air Valves EA $__________________
Finish Grading and Seeding, Strawing, and Fertilizing LS $__________________ Subtotal (Exterior Improvements Work) $
DIVISION 33 - UTILITIES
Manholes and Structures - 48" Manhole EA $__________________ Sanitary Septic Tank EA $__________________
Pavement Marking - Striping LF $__________________ Pavement Marking - ADA Symbol SF $__________________ Geotextile Fabric SF $__________________
Concrete Sidewalk, Compacted Base SF $__________________ Concrete Paving and Impact Pad including grill, fire pit, picnic table EA $__________________ Parking Bumper Block EA $__________________
Subtotal (Earthwork Work) $
DIVISION 32 - EXTERIOR IMPROVEMENTS
Aggregate for Exterior Improvement - Tent Pad SF $__________________ Aggregate for Exterior Improvement - Roadway to Picnic Pavilion SF $__________________ Asphalt Paving, Compacted Base SF $__________________
Site Clearing/Grubbing AC $__________________ Excavating, chain trencher, utility trench, common earth, 12HP, 6"W, 24"D, LF $__________________ Fill CY $__________________
| DATE: |
| CONTRACTOR 1: |
| CONTRACTOR 2: |
| 1: |
| undefined: |
| 1_2: |
| undefined_2: |
| 2: |
| undefined_3: |
| 225: |
| undefined_4: |
| 1_3: |
| undefined_5: |
| 21650: |
| undefined_6: |
| 550: |
| undefined_7: |
| undefined_8: |
| undefined_9: |
| undefined_10: |
| undefined_11: |
| 1_4: |
| undefined_12: |
| 225_2: |
| undefined_13: |
| undefined_14: |
| 5750: |
| 5750_2: |
| 770: |
| 2_2: |
| undefined_15: |
| undefined_16: |
| undefined_17: |
| undefined_18: |
| undefined_19: |
| 10: |
| 10_2: |
| undefined_20: |
| undefined_21: |
| undefined_22: |
| undefined_23: |
| undefined_24: |
| undefined_25: |
| undefined_26: |
| undefined_27: |
| undefined_28: |
| undefined_29: |
| undefined_30: |
| undefined_31: |
| 10_3: |
| undefined_32: |
| 10_4: |
| undefined_33: |
| 10_5: |
| undefined_34: |
| 10_6: |
| undefined_35: |
| 10_7: |
| undefined_36: |
| 10_8: |
| undefined_37: |
| 06: |
| undefined_38: |
| 90: |
| undefined_39: |
| 01: |
| undefined_40: |
| 30: |
| undefined_41: |
| 270: |
| undefined_42: |
| 15: |
| undefined_43: |
| 05: |
| undefined_44: |
| 15_2: |
| undefined_45: |
| 20: |
| undefined_46: |
| 100: |
| undefined_47: |
| 20_2: |
| undefined_48: |
| 90_2: |
| undefined_49: |
| 20_3: |
| undefined_50: |
| 110: |
| undefined_51: |
| 100_2: |
| undefined_52: |
| 200: |
| undefined_53: |
| 200_2: |
| undefined_54: |
| 3000: |
| undefined_55: |
| 650: |
| undefined_56: |
| 10_9: |
| undefined_57: |
| 20_4: |
| undefined_58: |
| 90_3: |
| 90_4: |
| 90_5: |
| 20_5: |
| 30_2: |
| 10_10: |
| 10_11: |
| 20_6: |
| 10_12: |
| 10_13: |
| 20_7: |
| undefined_59: |
| undefined_60: |
| undefined_61: |
| undefined_62: |
| undefined_63: |
| undefined_64: |
| undefined_65: |
| undefined_66: |
| undefined_67: |
| undefined_68: |
| undefined_69: |
| undefined_70: |
| undefined_71: |
| undefined_72: |
| undefined_73: |
| undefined_74: |
| undefined_75: |
| undefined_76: |
| undefined_77: |
| undefined_78: |
| undefined_79: |
| undefined_80: |
| undefined_81: |
| undefined_82: |
| undefined_83: |
| undefined_84: |
| undefined_85: |
| undefined_86: |
| undefined_87: |
| undefined_88: |
| undefined_89: |
| undefined_90: |
| undefined_91: |
| undefined_92: |
| undefined_93: |
| undefined_94: |
| undefined_95: |
| undefined_96: |
| undefined_97: |
| undefined_98: |
| undefined_99: |
| undefined_100: |
| undefined_101: |
| undefined_102: |
| undefined_103: |
| undefined_104: |
| undefined_105: |
| undefined_106: |
| undefined_107: |
| undefined_108: |
| undefined_109: |
| undefined_110: |
| undefined_111: |
| undefined_112: |
| undefined_113: |
File details come from the government source that posted it. Updated .