Attachment 001 PWS Wind Tunnel Upgrade Service College Station TX

Performance Work Statement (PWS)

Wind Tunnel Modification and Upgrade Service

Vision Statement

Provide requirements to modify and upgrade the existing wind tunnel system.

1 Introduction

The Contractor will provide a technical proposal for the PWS provided. Provide cost proposal for:

• Engineering analysis of existing instrumentation mounting and traversal system to determine the overall of movement and vibration within the system induced by operation of the wind tunnel fan and nozzle spray systems.

• Modify and upgrade mounting and traversal system to increase stability, minimize induced vibration and movement to mounted spray atomization measurement instrumentation, improve overall performance of the positioning system and optimize placement of existing air and spray diffusion components within the existing high-speed wind tunnel.

The Contractor shall provide all labor, equipment, transportation, and all other necessary tools to perform the services (not to include parts or consumable). The contractor will provide all services identified in this contact for the USDA, Agricultural Research Service (ARS), Southern Plains

Agricultural Research Center (SPARC), College Station, Texas. All services will be performed in accordance with the terms, conditions, and statements and specifics of work contained herein.

1.1 Mission – Reserved.

1.2 Background – Reserved.

1.3 Scope

The Contractor in accordance with the requirements of these specifications shall perform the services specified in the Matrix of Services. Such services shall include providing all labor, travel, equipment, tools, and other items or services necessary for the performance of the work unless otherwise specified herein. The Contractor accepts existing conditions and is responsible for ensuring all areas will meet the standards as defined in the performance requirements.

Periods of Performance

The contract time for this project is 180 calendar days from the Contractor’s Notice to Proceed.

2 General Requirements

The Contractor shall be directly responsible for work performance specified in the contract.

• The Contractor will conduct engineering analysis of existing high speed wind tunnel test section and instrumentation mounting and traverse components and structures for stability, rigidity, and ease of positioning and modify and upgrade as required to minimize movement and vibration to provide optimized instrumentation performance and positioning within the test section.

• The Contractor will conduct engineering analysis and optimize the positioning of the current airflow diffusion and liquid collection screens such that recirculation of airflow and spray throughout the measurement test area is eliminated.

• The project is located at the Southern Plains Agricultural Research Center at the Coulter Air

Field in Bryan, Texas.

• The Contractor’s proposal shall adhere to the criteria stated within these project requirements, drawings, and specifications. All services shall comply with applicable federal, state, and local code requirements as well as current industry standards, (ie., UBC, UPC, NFPA, UL, ASTM, ACI, NEC, NEMA, etc.) and health and safety codes, in effect at the time of contract award.

• The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for persons experienced performing this type of work.

• The Contractor will use biobased products meeting the minimum standard for content as defined in ASTM D6866 (Biobased Content Testing). The Contractor must comply with Section

9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO)

13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products. The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Location Site Manager (LSM).2.1 Non-Personal

Services.

• The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer or the Contracting

Officer Representative immediately.

2.2 Business Relations

The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

2.3 Contract Administration and Management

Prior to commencement of services, the Contractor shall furnish to the Contracting Officers

Representative (COR), a list of employees they propose to use in the performance of the on-site work required and designate the on-site Manager who will be responsible for supervision of such employees. The Manager shall:

1. Be the Contractor’s primary on-site representative, having the Contractors full authority to act on matters pertaining to the performance of services under this contract.

2. Be on-site or on-call whenever the Contractor’s workforce is on the site performing work.

3. Notify the COR and secure COR approval of any work proposed to be done.

4. Report damage to Government property, personal injuries, and/or hazardous conditions, to the COR within twenty-four (24) hours after the occurrence.

5. Arrange to meet with COR prior to commencement of any work to allow for the identification of any hazards located throughout the Complex.

2.3.1 Contract Management

The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at the Southern Plains Agricultural Research Center and the contractor's office\organization.

2.3.2 Contract Administration

The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

2.3.3 Personnel Administration

The contractor shall provide the following management and support as required. The contractor shall provide notification to employees during designated Government non-workdays or other periods where

Government offices are closed due to weather, budget, or security conditions. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. The contractor shall provide necessary infrastructure to support contract tasks. The contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs).

2.4 Subcontract Management

The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no

Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after formal notification to the Contracting Officer Representative and approval by the Contracting

Officer.

2.5 Contractor Personnel, Disciplines, and Specialties

The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources.

The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.

2.6 Location and Hours of Work

Accomplishment of the results contained in this PWS requires work at the Southern Plains Agricultural

Research. Location of work will be at the Center’s Coulter Airfield Wind Tunnel Facilities located in

Bryan, TX. Facilities normal workdays are Monday through Friday 0800 to 1630 except US Federal

Holidays, though additional times can be scheduled as required.

3 Performance Requirements

The following section specifies the Performance Objectives and Performance Elements for the contract.

• The Contractor will provide a turnkey project satisfying all Local and State requirements.

• The Contractor will provide engineered drawings for review by the Government to ensure drawing satisfy the Government’s need. CAD drawings will be provided to the Government after final designs are approved and service is completed.

• The Contractor will inspect existing instrumentation mounting and traversal systems and identify areas where the overall stability and rigidity of the system is compromised when the high-speed tunnel is operated at higher airspeed (125+ mph) and instrumentation is mounted at the furthest downstream position from the tunnel nozzle outlet (~ 7 ft).

• The Contractor will modify existing structures and mounting and traverse components as required to increase the overall ease of movement, stability, and rigidity to reduce vibration and movement of the mounted spray measurement instrumentation.

• The instrumentation mounting structure shall provide for precise vertical and horizontal position of instrumentation relative to the tunnel outlet. Vertical position refers to height position relative to tunnel outlet. Horizontal position refers to distance of instrumentation relative to tunnel outlet and parallel to the direction of airflow.

• All components of the system are expected to be exposed to several levels of moisture. All materials will be rust resistant, have rust preventive coatings, and/or be painted.

• Design: The design includes three main components.

o Measurement Test Area. The high-speed wind tunnel test section within which the instrumentation mounting, and traversal system resides is 12 ft square by 10 ft long.

The overall mounting system must fit within the established bounds and must provide for vertical positioning of instrumentation from the top of the tunnel outlet (74 in above test section floor) to 6 in below the bottom of the tunnel outlet (52 in above test section floor).

The mounting system must also provide horizontal positioning of instrumentation from 6 to 84 inches downstream of the tunnel nozzle outlet. The structural framing on the existing structure does not provide adequate bracing to prevent movement of the entire test section when the wind tunnel is in operation which subsequently translates to movement within the instrumentation mounting assembly.

o Instrumentation Mounting and Traversal System. The existing instrumentation mounting, and traverse system consists of a 3.75 in aluminum optomechanical rail assembly mounted to synchronized vertical traverses which provide for approximately 60 in of vertical movement. The optomechanical rail spans a width of 122 in and provides mounting and alignment components for research instrumentation that provides clearance for the air jet exiting the high-speed air nozzle to minimize vibration withing the structure. The existing assembly does not provide adequate stability and rigidity to the mounted instrumentation when the wind tunnel is in operation. Additionally, horizontal positioning of the entire instrumentation assembly is impeded due to inadequate linear bearing and rail components.

o Airstream Diffuser and Spray Stream Collector Assembly. The existing air jet diffuser and spray collection assemblies are mounted directly downstream of the instrumentation mounting assembly. The current structure is comprised of three 5 x 5 ft2 screens mounted 3 ft apart which are followed by an E-Hive spray collection assembly. The current position of these structures results in recirculation of spray material and through the instrumentation measurement area as well as air flow from the air jet, both of which prevent proper performance of the mounting instrumentation.

Figure 1. High Speed Wind Tunnel Test Section with Instrumentation Mounting and Traverse System and Air Diffusion and Spray Collection Screens.

• The Contractor may utilize other materials provided they provide equal or better structural integrity and corrosion resistance properties.

• Instrumentation focus and measurement testing shall be completed after construction is final and a report of the results provided to the Government.

4 Special Requirements

None

4.1 Security and Safety

Security of all Government facilities and property is essential. All contractor personnel must be United

States citizens or have proper documentation to work in the United States. All Contractor personnel are subject to background checks prior to being allowed to work on site. The Government reserves the right to deny access to any person who it determines is not in the best interest of the

Government. Only contractor personnel are allowed in the facilities. Contractor personnel will not provide access to any other persons including persons claiming to be Government employees. All authorized Government employees have keys to the areas that they are permitted to enter.

Contractor personnel shall comply with all policies pertaining to the conduct of persons on Government property. They shall not disturb papers on desks, open desks or cabinets, or use office equipment. Use of the telephone is allowed only for emergency calls. All Contractor personnel shall be easily identifiable as being a member of the service company. Acceptable means of identification shall include wearing uniforms with company’s name or utilizing name badges clipped to the front of an outer clothing garment or other method as approved by the COR. All contractor personnel shall use the same form of identification and the method of identification is to be agreed upon by the COR prior to services being provided. The Government reserves the right to require all contractor personnel to wear

Government issued ID badges. The Contractor will not be issued keys to any areas.

The Contractor will adhere to all Federal requirements as it pertains to entry into Federal Facilities.

These requirements are subject to change as environmental conditions change. These can include in response to biological pandemic, natural or man-made disasters, national security risks, mandatory vaccination or testing, etc.

Contractor will provide a safe working environment for contractor personnel and will ensure all personnel practice safe working techniques. The contractor shall follow, but is not limited to, the following safety precautions:

1. Providing safety-warning devices and ensuring they are used as necessary.

2. Providing all Contractor personnel with proper personal protective equipment, as necessary.

3. Ensuring all Contractor personnel are aware of the various hazards located throughout the facility.

4. The Government, upon request by the Contractor through the COR, will provide site-hazard awareness training for Contractor personnel once per year (not to exceed one hour and to be scheduled at the convenience of the Government).

6. Ensuring all tools brought on-site is routinely inspected and is in safe working order and meets all

Occupational Safety & Health Administration (OSHA) regulations.

7. Removing from service any tools found to be unsafe. Any equipment deemed unsafe will be removed from the site to prevent inadvertent use. Additionally, any equipment deemed to be unsafe by the COR must be promptly removed from service.

8. Contractor will ensure all employees are familiar with precautions to be taken to protect themselves from exposure to the flu and how to minimize the spread at the jobsite.

9. Contractor will adhere to all site policies for entering any areas.

4.2 Storage

The Contractor will not store excess materials on site. The contractor is responsible for delivering necessary material on site and removing them at the end of the service.

4.3 Government Furnished Materials

The Government shall furnish without cost to the Contractor; electricity and water to facilitate

Contractor’s work. The cost of repair parts will be supplied by the Government.

4.4 Applicable Directives

The contractor shall comply with all documents listed in the contract document.

5 Deliverables - Reserved

6 Related Documents

None.