1.0 Scope of Requirement:
The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to provide and install a custom built Bi-Fold door at the USDA-ARS, Northern
Great Plains Research Lab Building #32.
2.0 Project Location:
USDA, ARS, PA, Northern Great Plains Agricultural Research Laboratory
1701 10th Ave SW.
Mandan, ND 58554
3.0 Technical Project Requirements:
The Contractor will work with site personnel to ensure each task is accomplished in a timely manner within 30 working days from the start date of the project.
A. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal, state, and local code requirements as well as current industry standards, (i.e.: EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.
B. All work to meet all pertinent Unified Facilities Guide Specifications (UFGS) and ARS 242.1M standards. UFGS available at http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs. ARS 242.1M available at https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/.
4.0 Background & Site Description:
A. Existing building #32 had the north Bi-Fold door removed from wind damage.
B. Existing building door frame: Clear Open Width is approximately 37ft. 07in.
Clear Open Height is approximately 7ft. 06in.
Total Door Height is approximately 10ft. 06in.
5.0 Specific Requirements:
A. The contractor shall provide and install a new MIDLAND Bi-Fold-Door, Brand Name or Equal
B. The door operator shall be a BMR3 – Bottom 3-Single Motor Operator with NEMA 4 Controls, Brand Name or Equal
C. The new door operator, motor and controls must be compatible with the existing systems control operations. New operator must be able to run off existing door operations switches.
D. The door motor operator shall be a single phase 220 volt, 1 1/2HP or equivalent rated for the door size and operation.
E. The door sheeting and trim shall be 29-gauge ribbed steel with ribbed design and color approved by the COR.
F. The Bi-Fold door shall include 1 walk-door installed. 3150 series walk-door, Brand Name or Equal.
G. The door shall include a manual single handle latch.
H. The door shall include nylon strap operating system and column followers.
I. The door frame shall be primed and painted with COR approved color.
J. Any additional support framing to the structure for the door will be installed and provided by the contractor.
K. The door weatherstripping shall be provided and installed by the contractor.
L. The new door must be installed and tested as to proper operations and closing.
M. Special care must be taken at the site of installation and coordinated with the COR to ensure that the plot site is not disturbed during the installation process.
N. Contractor shall provide warranty on door and workmanship.
O. Contractor shall clean-up site from all materials and debris and dispose of off-site to the satisfaction of the Location Monitor before the project is deemed complete.
6.0 Performance Schedule:
A. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of construction permits, licenses, inspections, etc., are the obligation of the Contractor.
B. Schedules shall be updated and furnished to the COR.
C. Changes in the scope of work that affect the level of effort of the Contractor must be reviewed by the COR and pre-approved by the CO.
E. Disputes or questions that arise after the task order has been negotiated will be resolved by the CO.