Attachment 0008 FORM 3002 Clearance of Technical Information.pdf
PDF 296 KB Posted
- Attached to
- 120mm Mortar Shell Bodies Federal contract opportunity
- Solicitation number
- W15QKN-25-R-0040
About this file
This document is a Clearance of Technical Information for Public Release form (INME-PIC-IM Form 3002) used by Picatinny Arsenal for reviewing and approving technical materials before public distribution. The form provides a structured process for authors or producers, whether they are Picatinny-based or contractors, to obtain necessary approvals for releasing technical information. The clearance process involves multiple signature levels, including division, center/directorate, operations security (OPSEC), and patent/legal reviews, with each signatory recommending a distribution level ranging from unlimited release to release only as directed by a C or higher authority.
The form requires detailed information about the material being submitted, including the purpose of release (presentation, publication, abstract, news release), meeting details, and a certification that the material does not contain sensitive or classified information. For contractor-submitted materials, the process involves a Picatinny sponsor who initiates the clearance process, with a recommendation that videotape submissions be made at least 90 days prior to the projected public release date. The final approval is granted by the Picatinny Arsenal Public Affairs Office, which then forwards the approved material to the Picatinny Information Center for archival purposes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 0004 Non-Disclosure Agreement 120mm Shell Bodies.pdf | ||
| Attachment 0001 Contract Quality Requirements 10 April 2025.docx | DOCX document | |
| DRAFT W15QKN25R0040 DRAFT.pdf | ||
| Attachment 0010 Past Performance Assessment Questionairre.docx | DOCX document | |
| Attachment 0009 - SF_LLL.pdf | ||
| Attachment 0007 Certificate of Destruction.docx | DOCX document | |
| Attachment 0006 DD 2345 Militarily Cirtical Technical Data Agreement.pdf | ||
| Attachment 0005 FCDDAC1350 Technical Data Request Questionnaire.pdf | ||
| Attachment 0002 W15QKN-25-R-0040 - Price Matrix.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLEARANCE OF TECHNICAL INFORMATION FOR PUBLIC RELEASE
TITLE: PAO Log #
AUTHOR/PRODUCER (S): ADDRESS (IF APPLICABLE):
OFFICE SYMBOL:
PHONE/BLDG #:
AUTHOR/PRODUCER (S): COMPANY ADDRESS:
CONTRACT NUMBER:
NAME OF PICATINNY SPONSOR:
SPONSOR OFFICE SYMBOL:
SPONSOR PHONE/BLDG#: COMPANY PHONE:
PURPOSE OF RELEASE: Presentation Publication News Release Other
MEETING TITLE (If presentation,speech or conference paper):
PLACE: DATE(S): No Yes DoD Sponsored:
PUBLICATION (Magazine, journal, newspaper, proceeding):
Abstract
Yes No Solicited
REQUIRED APPROVALS: Signatures below certify that this material was reviewed for technical accuracy, classified information, security implications, proprietary information, competition-sensitive information and policy guidelines; that inventions have been previously submitted for patent review, and that the subject matter does not fall under the Militarily Critical Technology List.
CERTIFICATION: I certify that this material has not been copied substantially without written permission from the author/producer and does not contain any sensitive, potentially controversial, FOUO or classified information.
Author's/Producer's Signature
SIGNATURE Approve
Remarks:
A B C D E F
Yes No Date:
SIGNATURE (Patent/Legal) Approve
Remarks:
Recommend Distribution: A B C D E F
Yes No Date:
SIGNATURE (OPSEC) Approve
Remarks:
Recommend Distribution: A B C D E F
Yes No Date:
SIGNATURE (Center/Directorate/PM level) Approve
Remarks:
Recommend Distribution: A B C D E F
Yes No Date:
SIGNATURE (Division level) Approve
Remarks:
Recommend Distribution: A B C D E F
Yes No Date:
(Contracting Officer, if appropriate)
Recommend Distribution:
INME-PIC-IM Form 3002, 1 MAR 2011 Replaces AMSTA-AR Form 3002 Page 1 of 2
APPROVED
DISTRIBUTION:
CO
N
TR
A
CT
O
R
PI
CA
TI
N N
Y
TYPED NAME:
TYPED NAME:
DISPOSITION: BASED ON RECOMMENDATIONS PROVIDED ABOVE, CLEARANCE IS GRANTED FOR
PUBLIC RELEASE BASED ON THE APPROVED DISTRIBUTION CIRCLED BELOW
Picatinny Arsenal Public Affairs Office Date or higher authority)C
D E F
(DoD & DoD Contractors only)
(DoD Components only)
(Only as directed by
(Unlimited)
(U.S. Gov't only)
(U.S. Gov't & Contractor only)
A B
Text
CLEARANCE OF TECHNICAL INFORMATION FOR PUBLIC RELEASE
IF AUTHOR/PRODUCER IS PICATINNY-BASED:
Picatinny-based authors/producers are responsible for initiating the clearance process and ensuring that their material is approved for public release. This is accomplished by attaching one copy of the material (manuscript, photos, videotapes and any other material that requires clearance) to this form and obtaining the necessary signatures. When clearance is granted, the Picatinny Public Affairs Office (the last office in the clearance process) will forward one copy of this form along with the attached material to the Picatinny Information Center for archival purposes and provide another copy of this form to the author/producer. It is the author/producer's responsibility to notify all interested parties of the release approval and to make subsequent distribution.
IF AUTHOR/PRODUCER IS A CONTRACTOR:
A contractor initiates the clearance process by forwarding the material to a Picatinny sponsor, who in turn begins the clearance process in the same manner as a Picatinny-based request. When clearance is granted, the Picatinny Public Affairs Office (the last office in the clearance process) will forward one copy of this form along with the attached material to the Picatinny Information Center for archival purposes, and provide another copy of this form to the Picatinny sponsor. It is the Picatinny sponsor's responsibility to notify the contractor and any other interested parties of the release approval and to coordinate subsequent distribution with the contractor.
Because contractor-submitted videotape material requires clearance at the Defense Department level, recommend that these submissions be made at least 90 days prior to the projected public release date. Only Picatinny-related portions of multi-topic videotapes will be reviewed here.
RECOMMENDED DISTRIBUTION:
Each signator in the Required Approvals section recommends distribution based on the categories listed at the bottom of the form. The approved distribution is circled at the bottom of the form and will equal the most stringent distribution category selected by the signators.
For more information on the clearance process or this form, please contact the Picatinny Arsenal Public Affairs Office; DSN 880-6365; (973) 724-6365.
INSTRUCTIONS
COMMENTS
(Use this space, and additional pages as necessary, to make additional remarks or written changes to the submitted material. If changes are made directly on the material, a note to that effect in the Required Approvals section under "Remarks" is all that's necessary.)
INME-PIC-IM Form 3002, 1 MAR 2011 Replaces AMSTA-AR Form 3002 Page 2 of 2
Q:\PA\PA3002N.FRP Printing zaha.s.aljallad
CLEARANCE OF TECHNICAL INFORMATION FOR PUBLIC RELEASE
TITLE:
PAO Log #
AUTHOR/PRODUCER (S):
ADDRESS (IF APPLICABLE):
OFFICE SYMBOL:
PHONE/BLDG #:
AUTHOR/PRODUCER (S):
COMPANY ADDRESS:
CONTRACT NUMBER:
NAME OF PICATINNY SPONSOR:
SPONSOR OFFICE SYMBOL:
SPONSOR PHONE/BLDG#:
COMPANY PHONE:
PURPOSE OF RELEASE:
Presentation Publication News Release Other MEETING TITLE (If presentation,speech or conference paper):
PLACE:
DATE(S):
No Yes DoD Sponsored:
PUBLICATION (Magazine, journal, newspaper, proceeding):
Abstract Yes No Solicited
REQUIRED APPROVALS:
Signatures below certify that this material was reviewed for technical accuracy, classified information, security implications, proprietary information, competition-sensitive information and policy guidelines; that inventions have been previously submitted for patent review, and that the subject matter does not fall under the Militarily Critical Technology List.
CERTIFICATION: I certify that this material has not been copied substantially without written permission from the author/producer and does not contain any sensitive, potentially controversial, FOUO or classified information.
Author's/Producer's Signature
SIGNATURE
Approve Remarks:
A B C D E F Yes No Date:
SIGNATURE (Patent/Legal) Approve Remarks:
Recommend Distribution:
A B C D E F Yes No Date:
SIGNATURE (OPSEC)
Approve Remarks:
Recommend Distribution:
A B C D E F Yes No Date:
SIGNATURE (Center/Directorate/PM level) Approve Remarks:
Recommend Distribution:
A B C D E F Yes No Date:
SIGNATURE (Division level) Approve Remarks:
Recommend Distribution:
A B C D E F Yes No Date:
(Contracting Officer, if appropriate) Recommend Distribution:
INME-PIC-IM Form 3002, 1 MAR 2011 Replaces AMSTA-AR Form 3002 Page 1 of 2
APPROVED
DISTRIBUTION:
CONTRACTOR PICATINNY
TYPED NAME:
TYPED NAME:
DISPOSITION:
BASED ON RECOMMENDATIONS PROVIDED ABOVE, CLEARANCE IS GRANTED FOR
PUBLIC RELEASE BASED ON THE APPROVED DISTRIBUTION CIRCLED BELOW
Picatinny Arsenal Public Affairs Office Date or higher authority) C D E F (DoD & DoD Contractors only) (DoD Components only) (Only as directed by (Unlimited) (U.S. Gov't only) (U.S. Gov't & Contractor only) A B Text
CLEARANCE OF TECHNICAL INFORMATION FOR PUBLIC RELEASE
IF AUTHOR/PRODUCER IS PICATINNY-BASED:
Picatinny-based authors/producers are responsible for initiating the clearance process and ensuring that their material is approved for public release. This is accomplished by attaching one copy of the material (manuscript, photos, videotapes and any other material that requires clearance) to this form and obtaining the necessary signatures. When clearance is granted, the Picatinny Public Affairs Office (the last office in the clearance process) will forward one copy of this form along with the attached material to the Picatinny Information Center for archival purposes and provide another copy of this form to the author/producer. It is the author/producer's responsibility to notify all interested parties of the release approval and to make subsequent distribution.
IF AUTHOR/PRODUCER IS A CONTRACTOR:
A contractor initiates the clearance process by forwarding the material to a Picatinny sponsor, who in turn begins the clearance process in the same manner as a Picatinny-based request. When clearance is granted, the Picatinny Public Affairs Office (the last office in the clearance process) will forward one copy of this form along with the attached material to the Picatinny Information Center for archival purposes, and provide another copy of this form to the Picatinny sponsor. It is the Picatinny sponsor's responsibility to notify the contractor and any other interested parties of the release approval and to coordinate subsequent distribution with the contractor.
Because contractor-submitted videotape material requires clearance at the Defense Department level, recommend that these submissions be made at least 90 days prior to the projected public release date. Only Picatinny-related portions of multi-topic videotapes will be reviewed here.
RECOMMENDED DISTRIBUTION:
Each signator in the Required Approvals section recommends distribution based on the categories listed at the bottom of the form. The approved distribution is circled at the bottom of the form and will equal the most stringent distribution category selected by the signators.
For more information on the clearance process or this form, please contact the Picatinny Arsenal Public Affairs Office; DSN 880-6365; (973) 724-6365.
INSTRUCTIONS
COMMENTS
(Use this space, and additional pages as necessary, to make additional remarks or written changes to the submitted material. If changes are made directly on the material, a note to that effect in the Required Approvals section under "Remarks" is all that's necessary.)
INME-PIC-IM Form 3002, 1 MAR 2011 Replaces AMSTA-AR Form 3002 Page 2 of 2
| Check_Box17: Off |
| Check_Box16: Off |
| Check_Box15: Off |
| Check_Box14: Off |
| Check_Box31: Off |
| Check_Box68: Off |
| Check_Box64: Off |
| Check_Box66: Off |
| Check_Box63: Off |
| Check_Box55: Off |
| Check_Box40: Off |
| Check_Box30: Off |
| Check_Box38: Off |
| Check_Box35: Off |
| Check_Box34: Off |
| Check_Box46: Off |
| Check_Box45: Off |
| Check_Box44: Off |
| Check_Box43: Off |
| Check_Box42: Off |
| Check_Box54: Off |
| Check_Box50: Off |
| Check_Box60: Off |
| Check_Box59: Off |
| Check_Box62: Off |
| Title: |
| PAOLogNo: |
| Author: |
| OffSym: |
| PhoneandBldg: |
| Address: |
| CompAddress: |
| Arthor2: |
| Contno: |
| PicaSponsor: |
| SponsorSym: |
| SponsorPhoneBldg: |
| Check_Box18: Off |
| Check_Box19: Off |
| Check_Box20: Off |
| Check_Box21: Off |
| Check_Box22: Off |
| Check_Box23: Off |
| Check_Box24: Off |
| Check_Box25: Off |
| Check_Box26: Off |
| Check_Box27: Off |
| Check_Box28: Off |
| Check_Box29: Off |
| Check_Box32: Off |
| Check_Box33: Off |
| Check_Box36: Off |
| Check_Box37: Off |
| Check_Box39: Off |
| Check_Box41: Off |
| Check_Box47: Off |
| Check_Box48: Off |
| Check_Box49: Off |
| Check_Box51: Off |
| Check_Box52: Off |
| Check_Box53: Off |
| Check_Box56: Off |
| Check_Box57: Off |
| Check_Box58: Off |
| Check_Box61: Off |
| Check_Box65: Off |
| Check_Box67: Off |
| Text70: |
| Text71: |
| Text72: |
| Text73: |
| Text74: |
| Text75: |
| Text76: |
| Text77: |
| Text78: |
| Text79: |
| Text81: |
| AuthorSignature: |
| LegalSignature: |
| ContractSignature: |
| PAOSignature: |
| PAODate: |
| Signature2: |
| Signature3: |
| Signature4: |
| Signature5: |
| Signature6: |
| Signature7: |
| Signature8: |
| PrintButton1: |
| Text80: |
File details come from the government source that posted it. Updated .