This document is a Request for Use of Prohibited Material Attachment under Contract No. W912CH-24-R-00025. The attachment outlines the process for a contractor to request a waiver to use prohibited materials in the production of components for the M870A4 Semitrailer, Lowbed, Construction Equipment Transporter (SLCET) 40-Ton. The request must include details on the parts/processes requiring the prohibited material, associated health hazards, analysis of alternatives, technical justification, program risks, and a get-well plan. The government's Environmental Safety and Occupational Health Working Group will evaluate the request and provide a recommendation to the Product Director/Project Manager for approval or disapproval. This attachment is associated with the M870A4 SLCET 40-Ton federal contract opportunity, which is a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract with two optional ordering years, solicited as a 100% Small Business set-aside by the Department of the Army Materiel Command TACOM Life Cycle Management Command.

View the file

Other files

File Type Posted
Attachment 0017 - Experience Matrix.xlsx XLSX spreadsheet
Attachment 0019 - RESERVED.docx DOCX document
Attachment 0012 - Production Weekly Report.xlsx XLSX spreadsheet
W912CH24R0025 Final.pdf PDF
Attachment 0020 - Hazardous Materials Management Report (HMMR) Template.xlsx XLSX spreadsheet
Attachment 0008 - M870A4 TDP Use and Non-Disclosure Agreement _ W912CH24R0025 Final.pdf PDF
Attachment 0030 - M870A4 SCLET ECP TM Update.zip ZIP file
Attachment 0011 - Economic Price Adjustment (EPA) - Labor and Material 13 FEB 24 FINAL.xlsx XLSX spreadsheet
Attachment 0022 TOP_01-1-010A_Vehicle_Test_Course_Severity.pdf PDF
Attachment 0010 - Pricing Workbook - All CLINS 2.28.24.xlsx XLSX spreadsheet
Attachment 0029 - RESERVED.docx DOCX document
Attachment 0008 - M870A4 TDP Use and Non-Disclosure Agreement _ W912CH24R0025 Final.docx DOCX document
Attachment 0025 - DA 2404 Equipment Inspection and Maintance Worksheet.pdf PDF
Attachment 0024- Use of Existing Government-Furnished Property.xlsx XLSX spreadsheet
Attachment 0002 - PEO CSCSS Armoring SCG.pdf PDF
Attachment 0004 - Contract Data Requirements List (CDRL) Module Access.docx DOCX document
Attachment 0028 - Change Package TM Requirements Matrix.pdf PDF
Attachment 0021 - M870A4 SLCET Care Storage Report.xlsx XLSX spreadsheet
Attachment 0005 - OEM Contractor CDRL Module Access Request Form.docx DOCX document
Attachment 0026 - M870A4 PSPL.pptx PPTX presentation
Attachment 0009 - M870A4 TM 5-2330-343-13andP.pdf PDF
Attachment 0006 - Army CDRL Module OEM Contractor Training.pptx PPTX presentation
Attachment 0016 - TACOM Linear Sample Data Plate FI-06.pdf PDF
Attachment 0013 - Provisioning Requirements Summary (LSA-036) Data Products Worksheet.xlsx XLSX spreadsheet
Attachment 0015 - IUID Val Ver Report Template 4 Jan 23.xlsx XLSX spreadsheet
Attachment 0023 - Special Waiver Requests.docx DOCX document
Attachment 0014 - Items Requiring IUID Worksheet 4 Jan 23.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

Attachment [xx] – Request for Use of Prohibited Material

Attachment 0007 Request for Use of Prohibited Materials

Revision No.: 001 Contract No. W912CH-24-R-00025 Date: XX XXX XX

Distribution Statement A – Approved for Public Release; distribution unlimited

(*Distribution Statement A only applies when form is not filled in. Once filled check the PEO CS&CSS Security Class Guide for proper distribution statement/markings)

Controlled by: Department of Army Controlled by: PEO CS&CSS, PdM HTV CUI Category: CTI Distribution Statement C POC: Eric Murphy, APM MET

Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors for critical technology date of determination 2 August 2022. Other requests for this document shall be referred to Product Manager Multi-Mission Protected Vehicle Systems, Warren, MI

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq). or the Export Administration Act of 1979, (Title 50, U.S.C., App. 2401 et seq). as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

1. General Information

Requesting Company

Date of Request

Point of Contact

MET Prohibited material for which waiver is requested

2. Explanation of Use

Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon vehicle delivery including quantities of these parts. Indicate the specific variant and/or trailer the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.

3. Health Hazard

Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).

4. Analysis of Alternatives

Instructions: Identify all alternative which were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for. Include explanation as to why each cannot be implemented.

5. Technical Justification

Instructions: Provide technical justification for the use of MET prohibited material. Explain why it is necessary and why it cannot be eliminated.

6. Program Risk

Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.

7. Get Well Plan

Instructions: Identify which parts where an alternative may be integrated at a later date. Provide a get well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.

The following Sections will be filled in by the Government

8. Environmental Safety and Occupational Health Working Group (ESOH WG) Evaluation/ Recommendation

Instructions: Government ESOH WG will to provide evaluation of the above information and a recommendation to the Product Director/Project Manager regarding approval/disapproval of the prohibited material request.

ESOH Representative

9. Concurrence

I concur that use of {prohibited material} as described above under the {Contractor Name} Contract –{Contract Number} is acceptable and justified:

MET Lead Engineer

Product Manager

10. Approval

Upon the basis of the findings above, I hereby determine that use of {prohibited material} in the parts identified in Section 1 for {Contractor Name} Contract {Contract Number}is acceptable and justified.

Project Manager