Attachment 0007 - Form 1379.pdf
PDF 601 KB Posted
- Solicitation number
- W58RGZ-21-R-0118
About this file
This document contains a request for proposal for the overhaul and upgrade of the Enhanced Digital Electronic Control Unit for the UH-60 and AH-64 helicopters. The Army Materiel Command Contracting Command is seeking a contractor to furnish all labor, parts, materials, equipment, and data necessary to overhaul a minimum of 250 and maximum of 2,700 Enhanced Digital Electronic Control Units per year over a five-year indefinite delivery indefinite quantity contract. The units have national stock numbers ranging from 2995-01-572-1860 to 2995-01-680-3143. Delivery is required FOB origin with no identified depot maintenance work requirements. Currently, Triumph Engine Control Systems is the only approved repair source, and contractors are encouraged to seek additional source approvals by following the process outlined on the Army's website. No telephone requests for the solicitation will be accepted.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR DEPOT ENGINEERING SUPPORT
FCDD-AMR-AM FORM 1379, Page 1 of 3
Contractor Tracking No.
Contract No. Priority of Request
☐Urgent ☐Routine Date of Request
Contractor Address State, Zip
AC System
AC Type
NSN
CSI
☐Yes ☐No Part No.
Nomenclature
Serial No.
Publication No.
Publication Title
Change No.
Pub Date
Page/WP No. Paragraph/Section Figure No. Table No.
Discrepancy/suggested corrections or solutions:
Submitted by Signature Date
Email Address Phone No.
FCDD-AMR-AM FORM 1379, Page 2 of 3
Contractor Tracking No. Contract No.
Government Disposition:
Authorized by
Authorization Signature
Date
Reference TTS Reference MEO(s) Reference PAID
**The Government Disposition contained on this FCDD-AMR-AM FORM 1379 is not to be construed or interpreted as direction to perform tasks, work, or labor which could result in a monetary charge to the U.S. Government. Additionally, the contents of this Government Disposition shall not be used as direction to modify any existing contract between vendors and the U.S. Government. For questions regarding contracts and changes to contracts, consult your contracting officer. The contracting officer is the approving authority for all matters related to contracts.**
FCDD-AMR-AM FORM 1379, Page 3 of 3
INSTRUCTIONS
Contractor Tracking No. The contractor’s internal 1379 tracking number.
Contract No. The contract number issued to the contactor (required field).
Priority of Request. Request urgency.
Date of Request. Engineering support request date.
Contactor. Contractor company name.
Address. Contractor company address.
State, Zip. Contractor company state and zip code.
AC System. Aircraft system.
AC Type. Aircraft type.
NSN. National Stock Number.
CSI. Critical Safety Item.
Part No. Part number if applicable.
Nomenclature. Name of part.
Serial No. Serial number if applicable.
Publication No. Depot Maintenance Work Requirements (DMWR) or Technical Manual (TM) number.
Publication title. Depot Maintenance Work Requirements (DMWR) or Technical Manual (TM) title.
Change No. Depot Maintenance Work Requirements (DMWR) or Technical Manual (TM) change number.
Pub Date. Depot Maintenance Work Requirements (DMWR) or Technical Manual (TM) date.
Page/WP No. The page/work package the discrepancy/suggestion correction location.
Paragraph/Section. The paragraph/section the discrepancy/suggestion correction is location.
Figure No. The figure number of the discrepancy/suggestion correction.
Table No. The table number of the discrepancy/suggestion correction.
Discrepancy/suggested corrections or solutions. Detailed explanation of the issue/problem.
Submitted by. Contractor submitting form.
Signature. Contractor’s signature.
Date. Date signed.
Email Address. Contractor’s email address.
Phone No. Contractor’s phone number.
Government Disposition. Government’s recommend correction/solution to the issue/problem.
Authorized by. Government disposition approver.
Authorizing Signature. Government disposition approver signature.
Date. Government approval date.
Reference TTS. Task Tracking System number.
Reference MEO(s). MEOs pertaining to problem.
Reference PAID. PAID system number.
| Contractor Tracking No: |
| Contract No: |
| Date of Request: |
| State Zip: |
| AC System: |
| AC Type: |
| CSI: No |
| PartNo: |
| Serial No: |
| PublicationNo: |
| Publication Title: |
| ChangeNo: |
| PubDate: |
| PageWP No: |
| Discrepancysuggested corrections or solutions: |
| SubmittedBy: |
| FigureNo: |
| TableNo: |
| Date: |
| EmailAddress: |
| PhoneNo: |
| Priority: Routine |
| Contractor: |
| Address: |
| ACSystem: |
| ACType: |
| NSN: |
| Nomenclature: |
| PublicationTitle: |
| PageWPNo: |
| ParagraphSection: |
| Discrepancy: |
| DateOfRequest: |
| StateZip: |
| SerialNo: |
| GovernmentDisposition: |
| AuthorizedBy: |
| DispositionDate: |
| ReferenceTTS: |
| ReferenceMEOs: |
| ReferencePAID: |
| FormDate: 27 Apr 2021 |
| ContractorTrackingNo: |
| ContractNo: |
File details come from the government source that posted it. Updated .