Attachment 0005 - Critical Characteristics.pdf
PDF 7 KB Posted
- Solicitation number
- W58RGZ-24-R-0035
About this file
This document contains an attachment outlining critical characteristics for a midframe assembly and the related federal contract opportunity solicitation. The attachment specifies dimensional and hardness requirements for components of the midframe assembly per the identified drawings, including a minimum axial diameter of 2.050 inches and case thickness between 0.040 to 0.055 inches for specific parts. The solicitation seeks offers for the overhaul of the Midframe Assembly, NSN 2840-01-305-6946, in support of the T700 engine. The solicitation was issued by the Department of the Army Materiel Command Contracting Command at Redstone Arsenal. Offerors should refer to the attached solicitation for additional details on requirements and submission instructions.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
05/31/2023
6055T46G08 2840 01 305 - 6946
Y
Y
Y
Y
N
N
N
N
N
N
N
N
Dimension per Drawing 6055T46, Note 36, Axial Diameter BP minimum 2.050 inches from Surface AA for subcomponent item 3, 'No. 4 Bearing Housing Sumpa' PN 6039T38G08 (Zone C13, Sht. 1) as shown on subcomponent drawing 6039T38 (Zone C16, Sht. 1) Dimension per Drawing 6055T46, Note 36, Case Thickness 0.040-0.055 inches in area 'AF' for subcomponent item 2, 'Outer Midframe Casea' PN 6055T44G05 (Zone J12, Sht. 1) as shown on subcomponent drawing 6055T44 (Zone F22, Sht. 1) Hardness per Drawing 6055T46, Note 36, Rc 38-47 for subcomponent item 2, 'Outer Midframe Casea' PN 6055T44G05 (Zone J12, Sht. 1) as shown on subcomponent drawing 6055T44, Note 6.D.
Hardness per Drawing 6055T46, Note 5A, Rc 38-47 for subcomponent item 18 'Scavenge Tubea' PN 6055T46P08 (Zone B17, Sht.2).
99207 General Electric Company
CAGE
Critical CharacteristicsM ID
Part No NSN
Midframe AssyNoun YCritical Safety
YSerial Number Req'd YEngineering Test Req'd YFatigue YEndurance YInterchange
Approved M&O Sources
01/01/1994CSI Date
Approved Date
M&O CRITICAL SAFETY ITEMS
File details come from the government source that posted it. Updated .