Attachment 0004 - MATOC HTRO Self-Scoring Matrix (v2)_12 SEP 2025.xlsx

XLSX spreadsheet 51 KB Posted

Attached to
Design, Build and Construction Services MATOC to support Industrial Base Modernization at Government Owned - Contractor Operated (GOCO) Facilities
Solicitation number
W519TC-25-R-0026
Issued by

About this file

This document is a Highest Technically Rated Offeror (HTRO) Self-Scoring Matrix for a Multiple Award Task Order Contract (MATOC) solicitation (W519TC-25-R-0026) issued by the Department of the Army for design, build, and construction services at Government Owned-Contractor Operated (GOCO) ammunition facilities. The matrix provides a detailed scoring mechanism with 22,400 total possible points and a minimum technical threshold rating of 15,680 (70%), where offerors must self-score across multiple evaluation factors including mandatory technical requirements, prior experience, and small business achievement.

The solicitation requires offerors to demonstrate specific capabilities, including a single task order bonding capacity of $200,000,000, an aggregate bonding capacity of $500,000,000, and an Experience Modification Rate (EMR) less than 1.0. Contractors can earn points by submitting up to four contract references in various categories such as prime contractor experience, architect-engineer design experience, subcontract management, specialized contracts involving chemicals/petroleum, energetic materials, material handling systems, utilities infrastructure, process hazard analysis, site safety planning, and work at government-owned industrial facilities. Feedback and questions are due by September 25, 2025, with potential one-on-one industry sessions available through point of contact Rebecca S. Bernard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HTRO Matrix 12 SEP 2025

Instructions

1. Offeror shall complete all fields in yellow, as applicable, in accordance with Sections L and M and the instructions herein.

2. Offeror shall answer yes or no to Factor 1, Subfactor 1 - Bonding Capacity and Experience Modification Rate.

3. Offeror shall answer by entering the actual number of contract references submitted for all other Factors and Elements.

Example 1: An offeror submits four (4) contract references for contracts involving chemicals/petroleum; Offeror should select four (4) in cell D30.

Example 2: An offeror submits three (3) contract references for contract involving energetic materials; Offeror should select three (3) in cell D35.

3. Offeror shall enter a proposal reference in Column G to the supporting documentation for each factor and element.

Offeror Definition: Relative to this MATOC effort, the definition of ‘Offeror’ includes the Prime Contractor tendering its proposal and the Prime Contractor's team of subcontractors for the MATOC effort for whom the Prime Contractor possesses binding Letters of Commitment. Evaluation

1. Offerors who do not meet bonding and EMR requirements will not be considered for award.

2. HTRO Maximum Score: 22,400

3. Minimum Technical Threshold Rating (70%):15,680

Solicitation NumberW519TC-25-R-0026
Contractor
Unique Identifier Number
CAGE Code
Solicitation
ReferenceAttachment 0001: Highest Technically Rated Offeror Self-Scoring Matrix
Pending UpdateFactor 1: Mandatory Technical RequirementsOfferor Response
Pending UpdateElement 1 Mandatory Requirement: Bonding Capacity: Offeror shall provide documentation that, at the time of the proposal submission under this solicitation, it is able to obtain a single task order bonding capacity of $200,000,000 and an aggregate capacity of $500,000,000 from an approved surety listed in the Department of Treasury Circular 570 or other security permitted by Federal Acquisition Regulation (FAR) Subpart 28.2, unless prohibited by law or regulation.YesAcceptableYes
Pending UpdateElement 2 Mandatory Requirement: Experience Modification Rate (EMR): Offeror shall provide documentation from its insurance company that demonstrates that it has an average EMR for the past three (3) years of less than 1.0.YesAcceptableNo
Pending UpdateFactor 2: Prior Experience
Pending UpdateElement 1: Prime Contractor/Major Subcontractor Experience: Offeror may submit up to four (4) contract references in which it was the prime contractor or a major subcontractor (defined as completing greater than or equal to 40% of the contracted work based on total contract value) for design-build or bid-build projects that meet the description of NAICS codes 2362 (Nonresidential Building Construction) or 2371 (Utility System Construction). Each project must have been successfully completed within 15 years of the issuance of this solicitation. The Government will not consider projects that have not been 100% completed. If utilizing major subcontractor projects as a reference, the value of the project shall be based on the work the offeror was responsible for performing. All project references shall also involve at least five (5) of the following engineering/construction disciplines and one (1) of the following infrastructure disciplines:

- Engineering/Construction Disciplines: (1) Civil Engineering; (2) Architectural Engineering; (3) Mechanical Engineering; (4) Electrical Engineering; (5) Structural Engineering; (6) General Labor; (7) HVAC; (8) Fire Protection; (9) Earthwork and Grading; (10) Foundation and Site Work; (11) Communications; (12) Inside Electrical; (13) Inside Plumbing; (14) Carpentry (structural); (15) Demolition.

- Infrastructure Disciplines: (1) Plant electrical power interface; (2) Plant water interface; (3) Plant wastewater/sewer interface; (4) Plant instrument air interface.Number of ProjectsPoint Value (each)TotalProposal Reference0
Contract References Greater Than $500,000,000040001
Contract References $250,000,000-$499,999,999020002
Contract References $50,000,000-$249,999,999010003
Contract References Less Than $50,000,0000004
Pending UpdateElement 2: Architect-Engineer Design Experience: Offeror may submit up to four (4) contract references in which it was a prime contractor or major subcontractor completing the design work for design-only projects in an operating Government or industrial facility where uninterrupted integration amidst ongoing operations was required. Examples of projects may include but are not limited to those involving chemicals, petroleum, energetic material, plant electrical power, plant water interface, plant wastewater/sewer infrastructure, plant instrument air interface, material handling systems for substantial non-liquid, non-gas materials, and implementation of foreign technology domestically. Each reference must have been successfully completed within 15 years of the issuance of this solicitation. The Government will not consider projects that have not been 100% completed.Number of ProjectsPoint Value (each)TotalProposal Reference0
Contract References Greater Than $40,000,000040001
Contract References $20,000,000-$39,999,999020002
Contract References $4,000,000-$19,999,999010003
Contract References Less Than $4,000,0000004
Pending UpdateElement 3: Subcontract Management: For each contract reference submitted under Factor 2, Element 1, Offeror may submit documentation that identifies the number of subcontracts managed for each project, up to 10 per project.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References with 10 Subcontracts Managed04000
Contract References with 1-9 Subcontracts Managed02000
Contract References with 0 Subcontracts Managed000
Pending UpdateElement 4: Contracts for Chemicals/Petroleum: The Offeror may submit up to four (4) contract references in which it was a prime contractor or major subcontractor (performing at least 40% of the contracted work based on total contract value) for a design-build or bid-build projects that involved chemicals/petroleum. Each project reference must have been successfully completed within 15 years of the issuance of this solicitation.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
Pending UpdateElement 5: Contracts for Energetic Materials: The Offeror may submit up to four (4) contract references in which it was the prime contractor or major subcontractor (performing at least 40% of the contracted work based on total contract value) for design-build or bid-build projects that involved energetic materials. Energetic material is defined as solid, liquid, or dough-like materials (most often solid), based on molecules or formulations whose formation enthalpy is as high as possible, and which are capable of releasing, on demand, in a controlled fashion and without oxygen, the chemical energy stored in the molecular building blocks forming the substance. Each project reference must have been completed within 15 years of the issuance of this solicitation.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
Pending UpdateElement 6: Contracts Involving Material Handling Systems for Solids/Powders/Doughs: The Offeror may submit up to four (4) contract references in which it was the prime contractor or major subcontractor (performing at least 40% of the contracted work based on total contract value) for design-build or bid-build projects that required the implementation of a substantial non-liquid, non-gas material handling and/or automation system. Each contract reference must have been completed within 15 years of the issuance of this solicitation.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
Pending UpdateElement 7: Contracts Involving Utilities and Infrastructure Systems: The Offeror may submit up to four (4) contract references in which it was the prime contractor or major subcontractor (performing at least 40% of the contracted work based on total contract value) for design-build or bid-build projects that required utilities and infrastructure systems. Each contract reference must have been completed within 15 years of the issuance of this solicitation.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
Pending UpdateElement 8: Contracts Involving the Preparation of a Process Hazard Analysis (PHA): The Offeror may submit up to four (4) contract references in which it was the prime contractor or a major subcontractor (performing at least 40% of the contracted work based on total contract value) for design-build or bid-build projects that required the creation of a PHA. Each contract reference must have been completed within 15 years of the issuance of this solicitation.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
Pending UpdateElement 9: Contracts Involving a Site Safety Plan (SSP): The Offeror may submit up to four contract references in which it was the prime contractor or a major subcontractor (performing at least 40% of the contracted work based on total contract value) for domestic design-build or bid-build projects that required creation of a SSP. Each contract reference must have been completed within 15 years of the issuance of this solicitation. Only domestic project references may be utilized for this element.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
Pending UpdateElement 10: Contracts Involving the Implementation of Foreign Technology into a CONUS Project: The Offeror may submit up to four (4) contract references in which it was the prime contractor or a major subcontractor (performing at least 40% of the contracted work based on total contract value) for domestic design-build or bid-build projects that required implementation of a foreign manufacturing and/or chemical process technology in the final constructed facility. Each project reference must have been completed within 15 years of issuance of this solicitation. Only domestic project references may be utilized for this element.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
Pending UpdateElement 11: Contracts Involving Performance on an Operating Facility that Required Uninterrupted Integration into Ongoing Operations: The Offeror may submit up to four (4) contract references in which it was the prime contractor or a major subcontractor performing at least 40% of the contracted work based on total contract value) for design-build or bid-build projects that meet the description of NAICS codes 2362 (Nonresidential Building Construction) or 2371 (Utility System Construction) performed at an operating facility and required uninterrupted integration into ongoing legacy operations. Each contract reference must have been completed within 15 years of the issuance of this solicitation.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
Pending UpdateElement 12: Prime Contractor or Subcontractor at Government-Owned Industrial Facility: Offeror may provide up to four (4) contract references in which it was the prime contractor or major subcontractor (performing at least 40% of the contracted work based on total contract value) for design-build or bid-build projects at a Government-Owned Industrial Facility. Each contract reference must have been completed within 15 years of the issuance of this solicitation.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
Pending UpdateElement 13: Contract Involving Environmental Permitting: The Offeror may submit up to four (4) contract references in which it was the prime contractor or major subcontractor (performing at least 40% of the contracted work based on total contract value) for design-build or bid-build projects that meet the description of NAICS codes 2362 (Nonresidential Building Construction) or 2371 (Utility System Construction) which supported the preparation, submission, and approval of environmental permits for either air and/or water. Each contract reference must have had environmental permitting approval granted within 15 years of the issuance of this solicitation.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 001000
Pending UpdateFactor 3: Small Business
Pending UpdateAchievement of Small Business Goals: The Prime Contractor may submit up to four (4) CONUS contract references where it achieved satisfactory annual Contractor Performance Assessment Reporting System ratings for small business subcontracting goals for domestic design-build or bid-build projects within the prior 15 years. These contract references may be the same but do not need to be the same as those provided for other factors. Contract references for the Prime Contractor’s subcontractors will not be accepted.Number of ProjectsPoint Value (each)TotalProposal Reference
Contract References: 404000
Contract References: 1-302000
Contract Reference: 0000
TOTAL POINTS SCORED:0

File details come from the government source that posted it. Updated .