This document is a Contract Price Schedule for a roof replacement project at Tuskegee Institute National Historic Site. The solicitation (Number 140P5125Q0018) seeks a contractor to replace the roof of the Curatorial Maintenance Building, with two primary contract line items: roof replacement and bonding. The pricing schedule requires offerors to submit a base offer conforming to solicitation documents, with the option to propose alternate proposals that could result in cost savings to the government.
The bid schedule allows for submission of unit prices and total prices, with specific instructions to round totals to whole dollars and clarify that pricing will be evaluated based on best value to the government. The project is being managed by the Department of the Interior National Park Service Southeast Region, located in Tuskegee, Alabama. Offerors are advised that failure to submit a minimum offer that meets solicitation requirements may result in the proposal being deemed unacceptable.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5125Q0018_Amd_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Attachment_0002__Statement_of_Work.pdf | ||
| Attachment_0003__WG.pdf | ||
| Sol_140P5125Q0018.pdf | ||
| Attachment_0001__140P5125Q0018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER:
PARK - PMIS: DEVELOPED AREA: PROJECT TITLE:
140P5125Q0018 311388 Tuskegee Institute NH Roof Replacement
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. Pricing will be evaluated based on what is determined to be the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)
CONTRACT LINE ITEM (CLI) TITLE
QUANTITY
UNIT OF MEASURE
UNIT PRICE
TOTAL PRICE
Replacement of Roof, IAW SOW
LOT
| 2 |
| Bonding |
LOT
| TOTAL BASE PRICE (Contract Line Item Number 1 through 2) |
| $ |
| TOTAL PRICE FOR ALL (Contract Line Item Numbers 3 through 5) |
| $ |
| TOTAL PROPOSED PRICE - BASE PLUS ALL LINES (Contract Line Item Numbers 1 through 5) |
| $ |
CPS - 4