Attachment 0004 - 2024-3910 - SOW - Appendix C - Submittal Register.pdf

PDF 700 KB Posted

Attached to
Quarters 1 - Southwest Patio Repair
Solicitation number
W519TC-25-R-A009
Issued by

About this file

The document is a Submittal Register (Appendix C) for the Quarters 1 Southwest Patio Repair project (Contract No. PR# 2024-3910). The register details the comprehensive list of submittals required from the contractor across multiple specification sections, including preconstruction submittals, shop drawings, product data, samples, test reports, certificates, and closeout documents.

Key specification sections requiring submittals include construction scheduling (01 32 16), submittal procedures (01 33 00), safety requirements (01 35 26), quality control (01 45 00), waste management (01 74 19), and technical sections covering demolition, concrete work, steel fabrication, roofing, doors, hardware, pumps, and electrical components. Each submittal is classified with a specific submittal type (e.g., SD-01 Preconstruction Submittals, SD-02 Shop Drawings), assigned a paragraph reference, and marked with a classification (G for Government review, S for information). The register provides a structured tracking mechanism for the contractor to document and the government to review and approve required project documentation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

PR# 2024-3910

Quarters 1 SW Patio

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GBaseline Construction Schedule

SD-07 Certificates

1.4Monthly Updates

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6.1 GAPP - Construction

1.6 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3LHE Inspection Reports

SD-07 Certificates

1.5.1.4Crane Operators/Riggers

1.6.3.1 GStandard Lift Plan

1.7Activity Hazard Analysis (AHA)

1.8.1Hot Work Permit

1.11.4Certificate of Compliance

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 74 19 SD-01 Preconstruction Submittals

1.5 GConstruction Waste Management

Plan

SD-06 Test Reports

1.7.2Quarterly Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Appendix C

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

Quarters 1 SW Patio

01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

1.7.1As-Built Record of Equipment and Materials

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.7Quality Control Organizational

Chart

SD-02 Shop Drawings

1.6.2.2 GReinforcing Steel

SD-03 Product Data

2.3.1Cementitious Materials

2.4.1Concrete Curing Materials

2.6Reinforcement

2.3.4Admixtures

2.2.2Waterstops

1.6.3.4Finishing Plan

Nonshrink Grout; G

SD-06 Test Reports

1.6.1.2 GConcrete Mix Design

1.6.4.1Fly Ash

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

Quarters 1 SW Patio

03 30 00 1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.14.3.3 GCompressive Strength Tests

3.14.3.4Air Content

3.14.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.6.3.6Safety Data Sheets

1.6.7.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.5Joint Sealants

03 37 13 SD-07 Certificates

1.5 GQualifications

2.1.1Cement

2.1.5 GAdmixtures

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.4.2Shop Primer

2.3.1Welding Electrodes and Rods

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

Quarters 1 SW Patio

05 12 00 2.3.2Non-Shrink Grout

2.2.1 GRecycled Content for Structural

Steel

SD-05 Design Data

3.4.1.2Weld Inspection Reports

SD-07 Certificates

1.3AISC Structural Steel Fabricator

Quality Certification

AISC Structural Steel Erector

Quality Certification; G

Welding Procedures and

Qualifications; G

3.4.1.1Certified Welding Inspector

3.4.1.2NDT Technician

3.2Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.3 GFabrication Drawings

SD-03 Product Data

2.1Deck Units

2.1 SRecycled Content of Steel

Products

SD-07 Certificates

1.3.2Welder Qualifications

1.3.2Welding Procedures

1.3.1Manufacturer's Certificate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

Quarters 1 SW Patio

07 14 00 SD-03 Product Data

Fluid-Applied Membrane; G

2.2Membrane Primer

3.3Solvent

Protection Board; G

2.3Bond Breaker

07 53 23 SD-03 Product Data

2.1.1 GEPDM Sheet

2.1.2Seam Tape

2.3 GDRAINAGE MAT

SD-08 Manufacturer’s Instructions

3.2 GApplication

1.6 GCold Weather

07 62 13 SD-02 Shop Drawings

2.1.4Sheet Metal

SD-04 Samples

2.1Materials

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.4 GFrames

SD-03 Product Data

2.1 GDoors

2.1 SRecycled Content for Steel Door

Product

2.4 GFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

Quarters 1 SW Patio

08 11 13 2.4 SRecycled Content for Steel Frame

Product

SD-04 Samples

2.7.3 GFactory-applied Enamel Finish

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

SD-03 Product Data

2.2 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.4 GHardware Schedule

22 14 29.00 SD-03 Product Data

2.1 GManufacturer's Catalog Data

2.1 GPump Performance Curve

2.2.1Submersible Pumps

2.2.1 GAccessories

SD-08 Manufacturer’s Instructions

2.1Manufacturer's Installation

Instructions

26 20 00 SD-03 Product Data

2.7 GReceptacles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS