Attachment 0003- TAMMS-A M and O SOW.docx

DOCX document 49 KB Posted

Attached to
Apache AH-64 Support Shock Strut
Solicitation number
W58RGZ-24-B-0039
Issued by

About this file

This document is a Statement of Work (SOW) for the overhaul of the HIGH PERFORMANCE SHOCK STRUT for the AH-64 helicopter, identified by NSNs 1620-01-535-3515 and 1620-01-610-1094. The contractor shall provide all services, facilities, labor, parts, materials, equipment, tools, and data necessary to inspect, overhaul, and return the components to serviceable condition. The overhaul is for a Critical Safety Item (CSI) and must comply with QE-STD-1E and QE-STD-2C requirements. The planned quantity for overhaul over 5 years is a minimum of 40 and a maximum of 240 for each NSN. The replacement cost for the component is $54,099.13, and if the overhaul price exceeds $35,164.43, the government will review the disposition. The contractor must apply Item Unique Identification (IUID) and comply with packaging, shipping, and TAMMS-A documentation requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for

NSN: 1620-01-535-3515& 1620-01-610-1094

PRID:2022H015PART NUMBER: 1168100-509STATUS: R
2022AH0061168189-105

1. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data, necessary to accomplish the inspection and overhaul for the HIGH PERFORMANCE SHOCK STRUT for the AH-64 (hereinafter “the component”) that is required to return the component to a serviceable condition sufficient to meet the standard of continued airworthiness in accordance with (IAW) Army Regulation (AR) 70-62. Upon completion of the overhaul, the overhauled components shall be packaged IAW with this contract and shipped to the destination(s) specified in each individual delivery order.

2. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the component to the extent necessary to determine if the component is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer and shall discontinue the overhaul until given further instructions or the authorization for disposition of the component by the PCO.

3. In the event the PCO determines that certain items should be scrapped, the contractor shall scrap such items at the fixed unit price in Section B. In IAW Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.245-7004 Reporting, Reutilization, and Disposal (Deviation 2022-O0006), included in this contract, the Contractor shall complete the Plant Clearance Inventory Schedule using the Plant Clearance capability of the GFP Module of the Procurement Integrated Enterprise Environment (PIEE), an electronic equivalent of the Standard Form 1428, Inventory Disposal Schedule. Users shall register for access and obtain training on the PIEE home page https://wawf.eb.mil/piee-landing. Such scrapped components shall count toward the quantities ordered and the Government can replace any components scrapped by the Contractor.

4. The Government does not have an adequate Depot Maintenance Work Requirement (DMWR) for this effort.

5. Critical Safety Item (CSI): The HIGH PERFORMANCE SHOCK STRUT is a CSI.

a. This overhaul is for a CSI as identified by the Government and shall comply with the requirements of AMCOM Regulation 702-1, Aviation Critical Safety Items, Critical Application Items, and new Source Testing Program Management, 19 June 2017, Appendix C, Quality Engineering Standard-1, Revision E (QE-STD-1E) and Appendix D, Quality Engineering Standard-2, Revision C (QE-STD-2C). If during the overhaul and upgrade process, the contractor determines that completion of the overhaul will require the contractor to acquire and utilize a new component, the contractor shall procure new components only from sources of supply approved by the Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center (AvMC), Systems Readiness Directorate (SRD). The contractor must require purchase and acquisition of any new components to comply with QE-STD-1E. Adherence to QE-STD-1E and QE-STD-2C is required to maintain the integrity of the Critical Characteristics (CCs) of each CSI component. QE-STD-1E, QE-STD-2C, and a list of the applicable CCs are attached in Section J.

b. Written notification shall be given to the PCO as soon as possible but at least 30 days prior to first delivery indicating the time frame when the subject CSI under this contract will be actively in production so that a Supplier Interface and Oversight Program (SIOP) on-site review can be scheduled if such a review is determined by the Government to be necessary. The Contractor shall cooperate with and allow the Government to conduct a SIOP on-site review (1-3 days typically) while the contractor is actively overhauling the components. This review may also require site visits to critical process subcontractors. The purpose of the SIOP on-site review is to inspect the overhaul processes and documentation for CSIs and provide feedback and direction regarding the CSI program.

c. NOTE: Some of the personnel that support the SIOP program (for example, evaluation of manufacturing planning and participation in the SIOP onsite reviews) are support contractors of the DEVCOM, AvMC, and SRD, who provide programmatic and technical services under the AMCOM EXPRESS program. The SRD will, within 30 days of contract award, identify the contractors who may require access to your company's proprietary data (for example, frozen manufacturing planning) and facilities in performing their duties. The engineering support contractors will be allowed access only if a Non-Disclosure Agreement (NDA) between their employer and your company has been executed. A standard NDA will accompany the SRD notification. If an NDA with the identified support contractor has not been executed with your company, sign and submit the NDA with the frozen manufacturing planning to the PCO within 30 days of contract award. If you have any objections to the NDA or to its terms or conditions, contact the PCO in writing within 10 days of receipt of the SRD notification to allow sufficient time for a mutually acceptable arrangement to be reached.

6. Upon receipt of the components, contractor shall inspect containers for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Components received without containers or containers determined to be unserviceable shall be processed IAW the Contractor's locally approved GFP procedures. Components received improperly packaged, damaged with corrosion/deterioration, or those with shipping discrepancies shall be reported IAW DI-MGMT-80503 (See section B, Contract Data Requirements List [CDRL] A002).

7. GFP Attachment: The components being provided to the Contractor are identified and tracked as GFP. The Contractor shall maintain a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) GFP in its possession IAW Federal Acquisition Regulation (FAR) 52.245-1, and its property management system shall satisfy the requirements of this clause. The contractor shall record the acquisition, receipt, shipment, consumption, disposal of GFP, and any transfer to another contract utilizing the GFP Module in PIEE, https://piee.eb.mil, as required by the DFARS Procedures, Guidance, and Information (PGI) 245.103-72 Government-furnished Property Attachments to Solicitations and resultant contracts. GFP training and guidance is located at the Department of Defense (DoD) Procurement Toolbox at https://dodprocurementtoolbox.com/.

8. Contactor shall comply with U.S. Army Technical Manual (TM) 1-1500-345-23, Painting and Marking of Army Aircraft, or most recent version, if painting is required in the performance of this contract.

9. Contractor shall submit required data IAW the CDRL, DD Form 1423, Exhibit A - G electronically to the addresses indicated on the DD Form(s) 1423.

10. Product Verification Audit (PVA): The Contractor shall conduct the PVA IAW the detailed instructions as specified in Section E of the solicitation and resultant contract.

11. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in Department of the Army Pamphlet (DA PAM) 738-751 and TM 1-1500-328-23 as detailed in the attached TAMMS-A instructions. The U.S. Army Aviation Missile Command (AMCOM) TAMMS-A Customer Support Office (AMAM-OPL) is reachable via email at usarmy.redstone.amcom.mbx.g3m-snrr@army.mil. The Contractor shall prepare TAMMS-A data IAW DI-SESS-81758A and the TAMMS-A instructions attached to the solicitation and resultant contract (CDRL A004).

12. Product Quality Deficiency Reports (PQDRs): When requested, the Contractor shall assist the cognizant Contract Administration Office in evaluating PQDRs and exhibits for defects reported on components overhauled under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the Contractor’s Quality Program. The Contractor shall utilize the Product Data Reporting and Evaluation Program (PDREP) to submit a PQDR at https://www.pdrep.csd.disa.mil/pdrep_files/report_tools/pqdr.htm IAW AR 702-7-1, Reporting of Product Quality Deficiencies within the U.S. Army.

13. The items the Contractor shall overhaul are identified below:

Input NSNP/N
1620-01-535-35151168100-509
Output NSNP/N
1620-01-535-35151168100-509
Input NSNP/N
1620-01-610-10941168189-105
1620-01-465-92321168100-507
1620-01-610-32061168189-101
Output NSNP/N
1620-01-610-10941168189-105

14. The overhaul planned quantity for 5 years is Minimum 40, Maximum 240 for NSN 1620-01-535-3515 and Minimum 40, Maximum 240 for NSN 1620-01-610-1094. Input will be 30 days after receipt of order. Output shall be as specified in the solicitation and resultant contract schedule. Serviceable assets shall be returned to Department of Defense Activity Address Directory (DODAAC) W45H08, Plant 7015.

NSN 1620-01-535-3515
1st year qty 484th year qty 48
2nd year qty 485th year qty 48
3rd year qty 48
NSN 1620-01-610-1094
1st year qty 484th year qty 48
2nd year qty 485th year qty 48
3rd year qty 48

15. Transactional Inventory Procedures - The contractor shall prepare the following reports:

a. The contractor shall complete and retain a signed copy of DD Form 1348-1A, receipt for repairable on all shipments. The contractor shall complete the DD Form 1348-1A and include a signature to evidence shipment and receipt. Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at: https://www.dla.mil/Disposition-Services/DDSR/Turn-In/1348-Help/

The contractor shall prepare this form and include the following corresponding receipt information:

(1) Document Number - (Positions 30-44)

(2) National Stock Number (NSN) - (Positions 8-22)

(3) Condition Code - (Position 71)

(4) Unit Price - (Positions 74-80)

(5) Total Price - (Block 1)

(6) Actual Quantity Received - (Block 10)

(7) Nomenclature - (Block 17)

(8) Signature and Date - (Blocks 22 and 23) For questions with the above information, please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil

b. The Contractor shall perform an annual inventory of all GFP, including items for overhaul and any contractor-acquired property such as containers during the period of performance of this contract. This shall include any subcontractor inventories where GFP has been provided by the Government for overhaul. Contractor shall provide all results, findings, and corrective actions of any annual physical inventories to the Government IAW FAR Clause 52.245-1(f)(1)(iv), Physical Inventory. The contractor shall prepare a physical inventory report IAW DI-MGMT-80441D (CDRL A001).

c. The Contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 0001 "Contractor Overhaul TAV-C Requirements and TAV-C Portal End User Standard Operating Procedures (SOP)".

16. Foreign Military Sales (FMS): Contractor shall always segregate US quantities and FMS quantities and must keep segregated at all times in transit and in storage and shall flow down this requirement to all subcontractors.

17. The replacement cost is $54,099.13 for the component. When price of overhaul exceeds $35,164.43, a review of disposition will be made by the Government.

18. Item Unique Identification (IUID): The Contractor shall apply IUID IAW Military Standard (MIL-STD) MIL-STD-130N, AR 700-145, Item Unique Identification, and DA PAM 700-145, IUID Procedures, DFARS 211.274-2 Policy for item unique identification, which requires in paragraph (a)(3)(i) that IUID is required “regardless of value for any DoD serially managed item (reparable or nonrepairable) or subassembly, component, or part embedded within a subassembly, component, or part.” All registered Unique Item Identifiers (UIIs) shall be maintained as received and any UIIs created for component received without one, shall follow any published documentation, such as DMWRs or Maintenance Engineering Orders (MEO). In the absence of these documents, Contractors must strictly adhere to the procedures outlined in the MIL-STD-130N. “Maintaining a UII as received” means the construction of the UII string shall not change; however, the UII can and will receive updates to the associated data, such as Marks, PN Rollovers, within the DoD IUID National Registry. Any questions about the IUID program should be directed toward the AMCOM IUID helpdesk at 256-425-8566 or usarmy.redstone.amcom.mbx.immc-sim-iuid@army.mil.

19. Shipping Containers and Shipment: Contractor shall utilize the packaging requirements contained in “Attachment 0001, M&O Packaging Requirements.” If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor-furnished property. The method of shipment must include tracking of all packages for maintaining government property accountability and visibility. Contractor must comply with MIL-STD-2073-1E, DoD Standard Practice for Military Packaging and MIL-STD-129R, DoD Standard Practice for Military Marking for Shipment and Storage. The Contractor shall package electronic parts susceptible to static discharge damage IAW ANSI/ESD S20.20-2021 Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices). If TAMMS-A is required, each individual repaired item must include a copy of all forms required by The Army Maintenance Management System – Aviation (TAMMS-A).

20. Overhaul Plan Documentation: The contractor shall provide overhaul plan documentation to include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul/Repair travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration approved documentation) that the contractor utilized or shall utilize in the overhaul of the item. The documentation may be in contractor format. The contractor shall provide documentation IAW DI-MISC-80508B (CDRL A003).

21. NOTE - Applicable Technical Documents: The applicable documents referenced in this Statement of Work (SOW) are listed on the Contract Document Summary List (DSL) attached to the solicitation and resultant contract. The DSL lists the referenced documents by document ID, title, date, and category. The document versions specified on the DSL take precedence over the generic references (those without the revision letters) cited in the SOW.

05/16/2023