ATTACHMENT 0003 - CONTRACTOR PRICE BREAKDOWN FORM.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- W15QKN26QA132
About this file
This is a Contractor Price Breakdown Form template used to establish firm-fixed-price (FFP) cost proposals for construction solicitation W15QKN-26-Q-1BNR, a renovation project for Common Areas in Single Soldier UPH Building 209 at Fort Hamilton, NY. The form requires offerors to provide detailed cost buildups across five primary sections: Direct Labor (with labor categories, estimated hours, base hourly rates per Davis-Bacon wage determination, fringe rates, and fully burdened rates for trades including HVAC Mechanic/Pipefitter, Painter/Surface Prep, Plumber, General Laborer, and Site Superintendent); Direct Materials (itemized major materials and fixtures such as 4-ton split unit air conditioners, water source heat pumps, paint and primer, cove base, blackout shades, urinals, and shower curtains); Equipment & Rentals (owned or rented equipment including scaffolding, lifts, specialized HVAC handling equipment, and general construction tools); Subcontractor Costs (if applicable, with prime contractor responsible for detailed cost justification upon government request); and Indirect Costs & Profit (overhead, G&A, profit margins, and bonds/insurance estimates calculated as percentages of direct costs).
All proposed labor rates must meet or exceed mandatory minimums established in the attached Davis-Bacon Act Wage Determination. The form concludes with a certification statement requiring offerors to confirm compliance with prevailing wage requirements. Offerors may substitute a substantially similar spreadsheet if preferred. This template is essential for responding to firm-fixed-price construction contracts under Army contracts, ensuring transparent cost accounting and compliance with federal labor standards and cost accounting requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 1 DIRECT LABOR
| ATTACHMENT 0003 – CONTRACTOR COST BREAKDOWN FORM | |||||
| Solicitation Number: W15QKN-26-Q-1BNR | |||||
| Project Title: Renovation of Common Areas, Single Soldier UPH, Building 209, Fort Hamilton, NY | |||||
| Offeror Name: _______________________________________ | |||||
| CAGE Code: __________________ | |||||
| INSTRUCTIONS: Offerors must complete this form (or provide a substantially similar spreadsheet) to detail the buildup of their Firm-Fixed-Price offer for CLIN 0001. All labor rates must meet or exceed the mandatory minimums established in the attached Davis-Bacon Act Wage Determination. | |||||
| Provide a breakdown of the labor categories, estimated hours, and fully burdened labor rates required to complete the SOW. | |||||
| Labor Category / Trade | Est. Hours | Base Hourly Rate (per Wage Det.) | Fringe Rate | Fully Burdened Hourly Rate | Total Labor Cost |
| HVAC Mechanic / Pipefitter | $ | $ | $ | $ | |
| Painter / Surface Prep | $ | $ | $ | $ | |
| Plumber | $ | $ | $ | $ | |
| General Laborer | $ | $ | $ | $ | |
| Site Superintendent | $ | $ | $ | $ | |
| [Add rows as needed] | $ | $ | $ | $ | |
| TOTAL DIRECT LABOR: | $ |
SECTION 2 DIRECT MATERIALS
| Provide an itemized list of the major materials and fixtures required by the SOW. | ||||
| Material Description / Item | Quantity | Unit | Unit Cost | Total Material Cost |
| 4-Ton Split Unit Air Conditioner | 1 | EA | $ | $ |
| Water Source Heat Pumps (as specified) | EA | $ | $ | |
| Paint, Primer, and Prep Materials | 1 | LOT | $ | $ |
| Cove Base and Adhesives | LF/LOT | $ | $ | |
| Blackout Shades / Blinds | EA | $ | $ | |
| Urinal and Plumbing Hardware | 1 | EA | $ | $ |
| Shower Curtains and Rods | EA | $ | $ | |
| [Add rows as needed] | $ | $ | ||
| TOTAL DIRECT MATERIALS: | $ |
SECTION 3 EQUIPMENT & RENTALS
| Provide a breakdown of proposed equipment (owned or rented) necessary to complete the SOW. | ||||
| Equipment Type / Description | Quantity | Days/Hours Required | Rate (Daily/Hourly) | Total Equipment Cost |
| Scaffolding / Lifts (for ceiling work) | $ | $ | ||
| Specialized HVAC handling equipment | $ | $ | ||
| General construction tools/vehicles | 1 | LOT | $ | $ |
| [Add rows as needed] | $ | $ | ||
| TOTAL EQUIPMENT: | $ |
SECTION 4 SUBCONTRACTOR COSTS
| If utilizing subcontractors, provide the total estimated cost for their portion of the work. (Note: The Prime Contractor must still provide a detailed buildup of these costs upon Government request). | ||
| Subcontractor Name | Trade / Scope of Work Performed | Total Subcontract Cost |
| $ | ||
| $ | ||
| TOTAL SUBCONTRACTOR COSTS: | $ |
SECTION 5 INDIRECT COSTS & PROF
| Summarize the direct costs and apply applicable indirect rates and profit. | ||
| Cost Element | Calculation Basis | Total Cost |
| A. Total Direct Costs | (Sum of Sections 1, 2, 3, and 4) | $ |
| B. Overhead | ( ___ % of Direct Costs) | $ |
| C. General & Administrative (G&A) | ( ___ % of Direct Costs + Overhead) | $ |
| D. Subtotal Cost | (A + B + C) | $ |
| E. Profit | ( ___ % of Subtotal Cost) | $ |
| F. Bonds and Insurance | (Estimated Cost for Bid, Perf. & Payment Bonds) | $ |
| GRAND TOTAL FIXED PRICE (CLIN 0001): | (D + E + F) | $ |
| CERTIFICATION: | ||
| By submitting this breakdown, the Offeror certifies that the proposed labor rates comply with the mandatory minimums established in the attached Department of Labor Wage Determination. |