ATTACHMENT 0003 - CONTRACTOR PRICE BREAKDOWN FORM.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Rubberized Roof Sealant Removal and Replacement, Fort Devens
Solicitation number
W15QKN26QA132
Issued by

About this file

This is a Contractor Price Breakdown Form template used to establish firm-fixed-price (FFP) cost proposals for construction solicitation W15QKN-26-Q-1BNR, a renovation project for Common Areas in Single Soldier UPH Building 209 at Fort Hamilton, NY. The form requires offerors to provide detailed cost buildups across five primary sections: Direct Labor (with labor categories, estimated hours, base hourly rates per Davis-Bacon wage determination, fringe rates, and fully burdened rates for trades including HVAC Mechanic/Pipefitter, Painter/Surface Prep, Plumber, General Laborer, and Site Superintendent); Direct Materials (itemized major materials and fixtures such as 4-ton split unit air conditioners, water source heat pumps, paint and primer, cove base, blackout shades, urinals, and shower curtains); Equipment & Rentals (owned or rented equipment including scaffolding, lifts, specialized HVAC handling equipment, and general construction tools); Subcontractor Costs (if applicable, with prime contractor responsible for detailed cost justification upon government request); and Indirect Costs & Profit (overhead, G&A, profit margins, and bonds/insurance estimates calculated as percentages of direct costs).

All proposed labor rates must meet or exceed mandatory minimums established in the attached Davis-Bacon Act Wage Determination. The form concludes with a certification statement requiring offerors to confirm compliance with prevailing wage requirements. Offerors may substitute a substantially similar spreadsheet if preferred. This template is essential for responding to firm-fixed-price construction contracts under Army contracts, ensuring transparent cost accounting and compliance with federal labor standards and cost accounting requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 1 DIRECT LABOR

ATTACHMENT 0003 – CONTRACTOR COST BREAKDOWN FORM
Solicitation Number: W15QKN-26-Q-1BNR
Project Title: Renovation of Common Areas, Single Soldier UPH, Building 209, Fort Hamilton, NY
Offeror Name: _______________________________________
CAGE Code: __________________
INSTRUCTIONS: Offerors must complete this form (or provide a substantially similar spreadsheet) to detail the buildup of their Firm-Fixed-Price offer for CLIN 0001. All labor rates must meet or exceed the mandatory minimums established in the attached Davis-Bacon Act Wage Determination.
Provide a breakdown of the labor categories, estimated hours, and fully burdened labor rates required to complete the SOW.
Labor Category / TradeEst. HoursBase Hourly Rate (per Wage Det.)Fringe RateFully Burdened Hourly RateTotal Labor Cost
HVAC Mechanic / Pipefitter$$$$
Painter / Surface Prep$$$$
Plumber$$$$
General Laborer$$$$
Site Superintendent$$$$
[Add rows as needed]$$$$
TOTAL DIRECT LABOR:$

SECTION 2 DIRECT MATERIALS

Provide an itemized list of the major materials and fixtures required by the SOW.
Material Description / ItemQuantityUnitUnit CostTotal Material Cost
4-Ton Split Unit Air Conditioner1EA$$
Water Source Heat Pumps (as specified)EA$$
Paint, Primer, and Prep Materials1LOT$$
Cove Base and AdhesivesLF/LOT$$
Blackout Shades / BlindsEA$$
Urinal and Plumbing Hardware1EA$$
Shower Curtains and RodsEA$$
[Add rows as needed]$$
TOTAL DIRECT MATERIALS:$

SECTION 3 EQUIPMENT & RENTALS

Provide a breakdown of proposed equipment (owned or rented) necessary to complete the SOW.
Equipment Type / DescriptionQuantityDays/Hours RequiredRate (Daily/Hourly)Total Equipment Cost
Scaffolding / Lifts (for ceiling work)$$
Specialized HVAC handling equipment$$
General construction tools/vehicles1LOT$$
[Add rows as needed]$$
TOTAL EQUIPMENT:$

SECTION 4 SUBCONTRACTOR COSTS

If utilizing subcontractors, provide the total estimated cost for their portion of the work. (Note: The Prime Contractor must still provide a detailed buildup of these costs upon Government request).
Subcontractor NameTrade / Scope of Work PerformedTotal Subcontract Cost
$
$
TOTAL SUBCONTRACTOR COSTS:$

SECTION 5 INDIRECT COSTS & PROF

Summarize the direct costs and apply applicable indirect rates and profit.
Cost ElementCalculation BasisTotal Cost
A. Total Direct Costs(Sum of Sections 1, 2, 3, and 4)$
B. Overhead( ___ % of Direct Costs)$
C. General & Administrative (G&A)( ___ % of Direct Costs + Overhead)$
D. Subtotal Cost(A + B + C)$
E. Profit( ___ % of Subtotal Cost)$
F. Bonds and Insurance(Estimated Cost for Bid, Perf. & Payment Bonds)$
GRAND TOTAL FIXED PRICE (CLIN 0001):(D + E + F)$
CERTIFICATION:
By submitting this breakdown, the Offeror certifies that the proposed labor rates comply with the mandatory minimums established in the attached Department of Labor Wage Determination.

File details come from the government source that posted it. Updated .