Attachment 0002 TO 0001 PWS - 11 Sep 2023.pdf
PDF 123 KB Posted
- Attached to
- Shredding Services Federal contract opportunity
- Solicitation number
- W519TC-24-R-0016
About this file
This document is a performance work statement for shredding services for the Joint Munitions Command at Rock Island Arsenal. The contractor shall provide on-site shredding of controlled unclassified information on a bi-weekly basis at Building 350. The period of performance is for one year. The contractor must provide a range of 30-35 lockable shredding bins with master keys, and collect and return the bins from designated areas within the building. Performance will be monitored by the Contracting Officer's Representative to ensure 100% completion of the bi-weekly shredding schedule and bin collection and return. The related federal contract opportunity is solicitation number W519TC-24-R-0016 for these shredding services issued by the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 0005 Questions and Answers.xlsx | XLSX spreadsheet | |
| Amendment 0001 - Solicitation W519TC-24-R-0016.pdf | ||
| Attachment 0001 Umbrella PWS - 1 February 2024.pdf | ||
| Solicitation W519TC-24-R-0016.pdf | ||
| Attachment 0001 Umbrella PWS - 21 July 2023.pdf | ||
| Attachment 0004 SCA Wage Determination 26 December 2023.pdf | ||
| Attachment 0003 IDIQ Price Matrix 12 December 2023.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contents Introduction:
Description of Required Services
Objective
Type of Contract
Period of Performance
Building Access for JMC
PART 7 ATTACHMENT/TECHNICAL EXHIBIT LISTING
PERFORMANCE WORK STATEMENT (PWS)
Document Shredding Services for the Headquarters Joint Munitions Command, Rock Island Arsenal
Introduction: This requirement for this service is for the shredding of Controlled Unclassified Information (CUI) is for Joint Munitions Command (JMC), a Tennant of the US Army Installation, the Rock Island Arsenal (RIA).
Description of Required Services: Task Order is against the IDIQ IAW with the Overarching PWS.
Objective: The contractor shall provide paper destruction services:
• On site at JMC 2695 Rodman Ave Bldg. 350, Rock Island, IL 61299
• The contractor shall perform pickup and conduct on-site destruction on a recurring bi-weekly basis.
Type of Contract: Task order against the IDIQ.
Period of Performance: The period of performance shall be for 1-year. The Period of Performance will be established upon award.
Building Access for JMC. While in Building 350 the contractor will be escorted by the POC. The POC will issue the contractor an Escort Required Badge prior to entrance into Building 350. The visiting contractor wear an Escort Required Badge above the waist and displayed so that other personnel in Building 350 can see it. Upon departure from Building 350 the contractor will return the Escort Required Badge to the POC.
PART 4 CONTRACTOR FURNISHED ITEMS AND SERVICES
- Bins: The contractor shall provide an approximate range of 30-35 locked bins to collect and store materials to be destroyed until the bi-weekly service occurs.
- Master Key and backup (2 keys total), Key locks for all bins.
PART 7 ATTACHMENT/TECHNICAL EXHIBIT LISTING
7.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
7.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Required Services (Tasks)
Performance Standard
Acceptable Quality Level (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
#2 Shredding Schedule
Shredding will be performed bi-weekly, COR.
100% Completion COR Observation
#3 Contractor shall collect and return the bins
Contractor shall collect and return the bins from there designated areas within JMC Building 350.
100% Completion COR Observation
# 7 Key lockable bins with master on wheels
Provided 10 days after contract award.
No instances of non-completion
Observation by
COR
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE –
Deliverable Frequency # of Copies Medium/Format Submit To # 4 Bins, PWS Provided to the
COR at JMC Building 350.
Range of 30-35 Bins.
Specified Bin COR
# 5 Master Key and locks
Provided to the COR at the JMC Building 350.
Master Key and back up (2 keys total).
One key lock per bin to opened by one master key
COR
PART 7 ATTACHMENT/TECHNICAL EXHIBIT LISTING
File details come from the government source that posted it. Updated .