Attachment 0002 - QASP.pdf

PDF 457 KB Posted

Attached to
Lab Calibrations for RIA-JMTC Federal contract opportunity
Solicitation number
W9098S-22-Q-0059
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Lab Calibrations for RIA-JMTC, newest first.
File Type Posted
W9098S-22-Q-0059 P00002.pdf PDF
W9098S22Q0059 P00001.pdf PDF
W9098S22Q0059.pdf PDF
Attachment 0001 - Scope of Work - May 2022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QASP

RIA-JMTC Science and Engineering Directorate: Science Lab Divison and Heat treat department Service Contract: Calibrations of Hardness, Tensile, Compression Instruments, and a Microsope - (12) Instruments

SOW Task Acceptable Quality Level Surveillance Date/Result:

1) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes/No adjustments to calibration, of : specification in May. COR, or Lab POC. Date:

Instron 3345 Tensile Tester, Model 2519-107 SN 49328, 5k N capacity (1 Load) one direction (tensile) PLUS 1 extensometer per ASTM E 4 and ASTM E 83 Calibration due May

2) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes/No adjustments to calibration, of : specification in May. COR, or Lab POC. Date:

Riehle Model FA60 Compression Tester, SN 83544;

per ASTM E 4 Calibration due May

3) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes/No adjustments to calibration, of : specification in May. COR, or Lab POC. Date:

Riehle Model RA20 Tensile Tester, SN 61401;

(Used for Hydrogen Embrittlement);

per ASTM E 4 Calibration due May

4) Contractor to provide on-site calibration, including Contractor provided onsite calibration, 100% Inspection by: Yes /No adjustments to calibration, of : inspection, etc. of Riehle and scope, to COR, or Lab POC. Date:

Brinell indentation, Riehle/Ametek RA-18968, specification in July.

3000kg, (high medium low);

per ASTM E 10-15a.

with Brinell scope, Newage 5620-05, SN 334.

Direct and Indirect. Verification Method.

Inspect Indenter Ball and Holder.

Clean and Inspect Scope.

Calibration due July

5) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes /No adjustments to calibration, of : specification in July. COR, or Lab POC. Date:

Rockwell, Wilson 3YR, SN 78, A B C (high medium low) per ASTM E 18.

Calibration due July

6) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes /No adjustments to calibration, of : specification in July. COR, or Lab POC. Date:

Rockwell, Wilson, 4JS-574, 15N 30N 45N (high medium low) per ASTM E 18.

Calibration due July

7) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes/No adjustments to calibration, of : specification in July. COR, or Lab POC. Date:

LECO Microhardness Tester, LM100AT, Vickers 100 300 500g (high medium low) Knoop 100 300g (high medium low) (indenter need alignment with scope) per ASTM E 92.

Calibration due July

8) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes/No adjustments to calibration, of : specification in July. COR, or Lab POC. Date:

Creep Tester, Satec Model C, C2738-P, full scale capacity 10,000 lbf, single range, tension, lever ration 20:1, typical application is 6800#.

per ASTM E 4.

Calibration due July

9) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes/No adjustments to calibration, of : specification in July. COR, or Lab POC. Date:

Phase II Rockwell Hardness Tester, SN 1342A, 15N, 30N, and 45N per ASTM E 18.

Calibration due July

10) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes /No adjustments to calibration, of : specification in July. COR, or Lab POC. Date:

Olympus GX51Microscope, SN 3A10406, PAX IT 2 Camera/Software, 100x and 200x per ASTM E 1951 Calibration due July

11) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes /No adjustments to calibration, of : specification in July. COR, or Lab POC. Date:

Instron Corporation, Wilson Rockwell series B2000, Model 2002T, SN RB2000Q4007, Rockwell scales C, 15N, B, A, 30N. Instrument Condition: The Indentation Unit and Scope were in good working condition;

Calibration in May.

12) Contractor to provide on-site calibration, including Contractor provided onsite calibration to 100% Inspection by: Yes /No adjustments to calibration, of : specification in July. COR, or Lab POC. Date:

Louis Small, Brinell Hardness tester, Model BT60TR, SN 5513, 3000Kg load; with Brinell Scope, Newage testing instruments, SN 562, Model 5620-05; per ASTM E 10.

Direct and Indirect verification methods. Inspect Indenter Ball and holder for damage or wear. Clean and inspect the scope.

Instrument Condition: The Indentation Unit and Scope were in good working condition.

Calibration in May.

13) Service Calls to be scheduled for completion in the Contractor scheduled calibration service 100% Inspection by: Yes/No month annual calibrations are due: during months due, but no sooner than COR, or Lab POC. Date:

May or July, as applicable. 2 months prior, nor more than 1 month later.

May schedule no sooner than 2 months prior, nor more than 1 month later.

14) Service Calls to be scheduled for normal business Calls scheduled during normal business days 100% Inspection by: Yes/No days (Monday through Friday) typically 7am to 3pm. and times, unless otherwise agreed upon. COR, or Lab POC. Date:

excluding holidays, unless otherwise agreed upon between contractor and JMTC staff.

15) Service Calls shall include Inspection, cleaning, Calls included "Adjustment" to Calibration; no 100% Inspection by: Yes/No and Calibration, including “Adjustment to Calibration”. extra charge for time and labor. COR, or Lab POC. Date:

There shall be no extra charge for time and labor.

In the event parts and repair are necessary to complete calibration-verification, and/or “Adjustment to Calibration”, parts and repair will be negotiated under a separate contract.

16) Upon completion of work, calibration certificates Contractor forwarded calibration certificates and 100% Inspection by: Yes/No and a report of all services performed shall be forwarded, service report within 7 business days to the COR COR, or Lab POC. Date:

within 7 business days, to the Material Science or Performance Certifier. The Service report Laboratory COR or Performance Certifier. contained detailed itemization of work The report shall contain detailed itemization of work performed and recommendations for good performed and recommendations for continued good operations.

operations.

17) Contractor will comply with all RIA-JMTC and Contractor complied with all security 100% Inspection by: Yes/No installation security and safety requirements, and safety requirements. COR, or Lab POC. Date:

as outlined in SOW