Attachment 0002_ESCP.pdf
PDF 26 MB Posted
- Solicitation number
- 69056726Q000032
About this file
This file is a template document package for Storm Water Pollution Prevention Plan (SWPPP) compliance and construction site inspection procedures used by the Federal Highway Administration Western Federal Lands Highway Division. The document serves as an administrative and operational framework rather than specifying required products or services for procurement purposes.
The template includes multiple standardized forms and logs: a Delegation of Authority form, Amendment Log for tracking project modifications, Construction Site Inspection Reports for documenting Best Management Practices (BMPs) and corrective actions, Corrective Action Logs, monitoring data sheets for pH and turbidity testing, training logs for sediment and erosion control certification, Grading and Stabilization Logs, and Quality Assurance Checklists. Each form contains detailed instructions for recording environmental compliance activities, including documentation of structural and non-structural BMPs, identification of non-compliance incidents, tracking of corrective actions with completion dates, field monitoring of water quality parameters, personnel training records, and verification that stormwater controls are properly installed and maintained. The forms are designed to ensure comprehensive documentation of NPDES Construction General Permit compliance throughout the construction project lifecycle, with emphasis on maintaining records that demonstrate adherence to storm water pollution prevention requirements and federal water quality standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26Q000032 QandA_2026-7-30.pdf | ||
| 26Q000032 QandA_2026-7-23.pdf | ||
| 69056726Q000032_0001.pdf | ||
| 26Q000032 QandA_2026-7-22.pdf | ||
| Attachment 0004_Past Perf Questionnaire Template.docx | DOCX document | |
| 69056726Q000032_rfq.pdf | ||
| Attachment 0001_Price Schedule.xlsx | XLSX spreadsheet | |
| Attachment 0003_Past Experience Submission.pdf | ||
| Attachment 0005_USDOL SCA WD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plan
S P
For:
Federal Highway Administration Western Federal Lands Highway Division
Tab 1
Tab 2
Tab 3
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS
HIGHWAY DIVISION
DELEGATION OF AUTHORITY
Name or Position:
Company:
Address:
City, State, Zip:
Phone:
Company:
Title:
Signature:
Name:
Tab 5
Tab 7
WESTERN FEDERAL LANDS HIGHWAY DIVISION
AMENDMENT LOG
Project Name: Page:
Amendment Number Description of Amendment/BMP Location of Amendment/BMP, Page/Sheet Number Date of
Amendment Amendment Approved by:
(Name, Title)
WFLHD 157-4 (5/2011)
Tab 9 Inspection Reports
HIGHWAY DIVISION
CONSTRUCTION SITE INSPECTION REPORT
General Information
Project Name:
Date of Inspection: Start/End Times:
Project Name:
Inspector’s Names: Inspectors Title:
Inspector’s Company:
Inspector’s Contact Information:
Inspector’s Qualifications (CESCL or other certification number): Inspector’s Qualifications expiration date:
Describe present phase of construction
Type of Inspection:
Weather Information
Has there been a storm event since the last inspection?
If yes, provide:
Weather at time of this inspection?
WFLHD 157-2 (5/2011)
Site-specific BMPs BMP - Describe and give the location of the structural and non-structural BMPs identified in your SWPPP in the BMP column below (add as many BMPs as necessary on the continuation sheets. Include areas that are required to be inspected by the CGP, such as material storage areas that are exposed to precipitation.
BMP Installed – If a BMP should be installed at the current phase of the project and you marked “No” in the “BMP Installed” column, then you must check “Yes” in the “BMP Action Required?” column BMP Action Required? - .If a BMP needs repair, modification, replacement, maintenance or a new BMP is needed or a SWPPP amendment is needed, then a BMP Action is required.
BMP Action Required, Complete by Date - Before certifying the report, fill in the date when the BMP Action can reasonably be expected to be completed. When a BMP Action is NOT required, leave the “Complete by Date” blank.
Describe BMP Action, if Needed – Anytime you check “Yes” for “BMP Action Required”, then you must also fill in the “Describe BMP Action” column.
Delayed Action Item Report - When a BMP Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met Keep the Delayed Action Item Report in the SWPPP.
Corrective Action Log - When a BMP Action is required as noted in this report, you must also enter all the information for this action in the Corrective Action Log.
BMP & Location BMP Installed?
BMP Action Required?
Describe BMP Action, if Needed
BMP & Location BMP Installed?
BMP Action Required?
Describe BMP Action, if Needed
Please use continuation sheets if there are additional BMPs to list.
Overall Site Issues BMP or Activity -- These are some general site issues that must be assessed during inspections.
Implemented? – If a BMP or activity should be implemented at the current phase of the project and you check “No”, then you must mark “Yes” in the “Corrective Action Required?” column.
Corrective Action Required? - When maintenance or some other corrective action is required, check “Yes” in this column.
Corrective Action Required, Complete by Date - When a corrective action is required, before certifying the report, fill in the date when the corrective action can reasonably be expected to be completed. When a corrective action is NOT required, leave the “Complete by Date” blank.
Describe Corrective Action, if Needed – Anytime you check “Yes” in the “Corrective Action Required?”
column, you must fill in the “Describe Corrective Action” column as well.
Delayed Action Item Report – When a Corrective Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the date was not met. Keep the Delayed Action Item Report in the SWPPP.
Corrective Action Log - When a Corrective Action is required as noted in this report, you must also enter all the information for this action in the Corrective Action Log.
BMP or Activity Implemented? Corrective Action
Describe Corrective Action and Location, if Needed
BMP or Activity Implemented? Corrective Action Required?
Describe Corrective Action and Location, if Needed
Overall Site Issue Answer to Question
Corrective Action
Describe Corrective Action and Location, if Needed
Scope of Inspection
Check the box below if the project is in compliance with the CGP and the SWPPP:
I certify that on the date of this inspection, this project was found to be in compliance with the terms of its Storm Water Pollution Prevention Plan and the current Construction General Permit.
If there are incidences of non-compliance, then do not check the box above.
When you don’t check the box above, then you must describe each incident of non-compliance and the actions that are needed to bring the project into compliance.
If there is an Action Item described in the non-compliance box that does not already have a “Complete by Date” assigned elsewhere in this report, then add a completion date within the box.
Incidence of Non-compliance:
Action Item and Complete by Date:
CERTIFICATION STATEMENT
Contractor’s Duly Authorized Representative FHWA’s Duly Authorized Representative
Print name: Print Name:
Title: Title:
Signature: Signature:
CORRECTIVE ACTION LOG
Project Name: Page:
Inspection Date Inspector Name Description of BMP Deficiency Location of BMP Deficiency
Date Corrective Action Taken/
Responsible Person
WFLHD 157-5 (5/2011)
Tab 11
Sampling Agency: Date:
Sample Collector:
Permit Number:
pH
Meter S/N ID#1:
Accuracy Criterion: +/- 0.2 SUMeter Make:
Meter Model:
Pre time2: Post time3:
Std Temp (°C)
Theo
(SU)
Read
(SU)
Diff
(SU)
Pass4
(Y/N) Std Temp (°C)
Theo
(SU)
Read
(SU)
Diff
(SU)
Pass4
(Y/N)
Turbidity
Meter S/N ID#1:
Accuracy Criterion: +/-
10% Meter Make:
Meter Model:
Pre time2: Post time3:
Std Read
(NTU)
Diff
Pass4 (Y/N)
Read
(NTU)
Diff
Pass4 (Y/N)
Standards QA information5 pH
Std Value 7 10 4
Lot #
Exp.
Date
Instructions for completing CCV:
1 Meter ID, please record the meter number used for each parameter
Pre-time, please record the time each meter was checked with standards prior to sample analysis
Post-time, please record the time each meter was checked with standards after sample analysis
Pass, please indicate whether the meter passed the pre-check according to the accuracy criteria for the meter by indicating Y or N
Standards QA Information, please record the lot numbers and expiration dates for pH standards being used in the field
Monitoring Agency: Monitoring Observation Date1:
Monitoring Personnel2: Permit Number:
Monitoring Information Field Data
Notes5 pH
(SU)
Conductivity
(NTU)
Result
Monitoring Site
Description3 Time4
Instructions for completing Data Field Sheet:
1 Observation Date, please record the date once at the top of the data field sheet
For Monitoring Personnel, please list all personnel that were present during sampling. Initials are not sufficient for this field
The Monitoring Site Description should describe the exact location from which the sample was collected
4 Please record the Time the field measurement was observed
For Notes, please identify any pertinent information, including but not limited to whether initial test failed acceptance criteria, any treatment performed, and whether result is a re-test after treatment
TRAINING LOG
Sediment and Erosion Control/NPDES Training
Project Name:
Course Title:
Instructor’s Name(s)/Title(s):
Course Location:
Course Date: Course Length (hours):
Training Topics:
Erosion Control BMPs Good Housekeeping BMPs Other (Specify)
Sediment Control BMPs SWPPP Provisions
Non-Storm Water BMPs Conducting Inspections
Emergency Procedures Turbidity Monitoring
(attach additional pages as necessary)
Name of Attendee Company/Agency
WFLHD 157-3 (5/2011)
FEDERAL HIGHWAY ADMINISTRATION
HIGHWAY DIVISION
GRADING AND STABILIZATION LOG
Project Name: Page:
Date Grading Activity Initiated
Description of Grading Activity and Location
Date Grading Activity Ceased
(Indicate Temporarily or Permanently)
DateWhen Stabilization Measures Initiated
Description of Stabilization Measures
WFLHD 157-6 (5/2011)
Quality Assurance Checklist
General Information
Project Name:
Date of Inspection:
Project Reviewed by:
Contact Information:
Describe present phase of construction:
Information
Date of Original SWPPP:
Date of Most Recent Amendment or Modification:
Is the SWPPP signage properly and conspicuously posted?
Are the SWPPP narrative and plan sheets being updated to accurately reflect the progress of the project?
If the answer is No to any of the above questions, the following corrective action is recommended:
Inspections
Inspection Frequency Required by SWPPP:
Are inspections being performed and documented at the above stated frequency?
Are inspection reports included in the SWPPP?
Are borrow and/or waste sites dedicated to the project inspected as part of the SWPPP construction site inspection?
Are stormwater pollution controls effectively in place at borrow and/or waste sites?
Are inspections and SWPPP documentation signed by the Signatory Official?
Stormwater Pollution Controls
Are perimeter controls installed before any ground disturbing activities take place?
Are temporary and permanent erosion control practices properly installed and effectively maintained within the required timeframe?
Are temporary and permanent sediment control practices properly installed and effectively maintained?
If the answer is No to any of the above questions, the following corrective action is recommended:
Are BMPs being selected, installed, implemented, and maintained as stated in the SWPPP?
Is the SWPPP being updated and revised as needed to address problems and reflect changes in the contractor’s operations?
Are the BMPs adequate to minimize pollutants in stormwater discharge necessary to meet water quality standards as stated by the State Water Quality Certification and/or NPDES?
File details come from the government source that posted it. Updated .