This is Amendment 0001 to a Request for Quote (RFQ) issued by the Federal Highway Administration (FHWA) Western Federal Lands Division for post-construction environmental compliance monitoring services related to OR GRANT 24(1), Granite Hill Road Reconstruction project. The amendment, effective July 24, 2026, updates Section C (Contract Clauses) and removes FHWA Local Clauses that are not applicable to this requirement. Pages C-32 through C-40 now constitute the official contract clause pages, with amendments indicated by red strikethrough text.
The amendment primarily removes or modifies several FHWA local clauses including FHWA-004 (U.S. Department of Transportation Contractor Personnel Security and Agency Access), FHWA-005 (Homeland Security Presidential Directive-12), FHWA-006 (Contractor Personnel Preprocessing, Background Investigation, and Information Security System Awareness Training), and FHWA-007 (Contractor Personnel Out-Processing). The retained provisions address contractor personnel security processing, identification card requirements, background investigations, and personnel clearance procedures for contractor employees requiring access to USDOT facilities, sensitive information, and information systems. All other contract stipulations remain unchanged. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation by completing items 8 and 15 of the form or by separate letter/electronic communication referencing the solicitation and amendment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26Q000032 QandA_2026-7-30.pdf | ||
| 26Q000032 QandA_2026-7-23.pdf | ||
| 26Q000032 QandA_2026-7-22.pdf | ||
| Attachment 0002_ESCP.pdf | ||
| Attachment 0004_Past Perf Questionnaire Template.docx | DOCX document | |
| 69056726Q000032_rfq.pdf | ||
| Attachment 0001_Price Schedule.xlsx | XLSX spreadsheet | |
| Attachment 0003_Past Experience Submission.pdf | ||
| Attachment 0005_USDOL SCA WD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
See continuation page
Federal Highway Administration
FHWA WESTERN FED LANDS DIVISION
610 E FIFTH STREET
Vancouver WA 98661
690567
69056726Q000032
07/24/2026
07/16/2026
1 2 douglas.g.taylor Highlight douglas.g.taylor Highlight
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
69056726Q000032/0001
OR GRANT 24(1), GRANITE HILL ROAD
RECONSTRUCTION
Post-Construction Environmental Compliance
Monitoring Services
Amendment 0001 is issued to update Section C, Contract Clauses, and removes FHWA Local
Clauses which are not applicable to this requirement. Amendments are indicated by red and struck through text on the following pages and these pages (C-32 through C-40) now become the official pages in the RFQ and any subsequent PO award.
All other stipulations remain unchanged.
C-32
AMENDMENT 0001
within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer’s response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the TPOC.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the TPOC acting within his or her appointment, shall be at the Contractor’s risk.
(End of Clause)
FHWA-004 -- U.S. Department of Transportation (USDOT) Contractor Personnel Security and Agency Access (November 2011)
(a) Definitions. The following definitions are provided:
“Agency Access” means access to USDOT facilities, sensitive information, information systems, or other USDOT resources.
“Applicant” is a Contractor employee for whom the Contractor applies for a USDOT identification card.
“Contractor Employee” means prime Contractor and Subcontractor employees who require agency access to perform work under a USDOT contract.
“Identification Card” (or “ID card”) means a government-issued or accepted identification card such as a Personal Identity Verification (PIV) card, a PIV Interoperable (PIV-I) card from an authorized PIV-I issuer, or a non-PIV card issued by USDOT, or a non-PIV card issued by another Federal agency and approved by USDOT. PIV and PIV-I cards have physical and electronic attributes that other (non-PIV) ID cards do not have.
“Issuing Office” means the USDOT entity that issues identification cards to Contractor employees.
“Local Security Servicing Organization” means the USDOT entity that provides security services to the USDOT organization sponsoring the contract.
(b) Risk and Sensitivity Level Designations. For contracts requiring access to USDOT facilities, sensitive information, information systems, or other USDOT resources, the Contractor employees will be required to complete background investigations, identity proofing, and Government identification card application procedures to determine suitability for access. USDOT will assign a risk and sensitivity level designation to the overall contract and to Contractor employee positions
C-33 by category, group, or individual. The risk and sensitivity level designations will be the basis for determining the level of personnel security processing required for Contractor employees.
IF THE DESIGNATED RISK IS THE BACKGROUND INVESTIGATION IS
Low National Agency Check with Written Inquiries (NACI) Moderate Minimum Background Investigation (MBI) High Background Investigation (BI)
Contractor employees may also be required to obtain security clearances (i.e., Confidential, Secret, or Top Secret). National Security work designated “special sensitive,” “critical sensitive,” or “non-critical sensitive” will determine the level of clearance required for Contractor employees.
Personnel security clearances for national security contracts in USDOT will be processed according to the Department of Defense National Industrial Security Program Operating Manual
(NISPOM).
Historically, similar contracts and the associated Contractor employee positions have been designated “Low Risk” and only the NACI investigation has been conducted. This investigation is appropriate for positions designated as public trust positions that require responsible and trustworthy employees but with no national security impact.
(c) Pre-screening of Contractor Employees. Pre-screen individuals designated for employment under any USDOT contract by verifying minimal suitability requirements to ensure that only quality candidates are considered for contract employment, and to mitigate the burden on the Government of conducting background investigations on objectionable applicants. The Contractor must exercise due diligence in pre-screening all employees before submission to USDOT for agency access. USDOT may decline to grant the agency access to a contractor employee for reasons including, but not limited to:
(1) Conviction of a felony, a crime of violence, or a misdemeanor involving moral turpitude.
(2) Falsification of the information entered on forms or of other documents submitted.
(3) Improper conduct including criminal, infamous, dishonest, immoral, or notoriously disgraceful conduct or other conduct adverse to the Government regardless of whether the conduct is directly related to the contract.
(4) Any behavior judged to pose a potential threat to USDOT facilities, sensitive information, information systems, or other resources.
(d) Citizenship and Alien Status. As necessary, monitor an alien’s continued authorization for employment in the United States. Provide documentation to the Contracting Officer or the Contracting Officer’s Representative during the background investigation process that validates that the E-Verify requirement has been met for each Contractor employee.
(e) Background Investigation and Adjudication. The Contractor employee must have a favorable adjudication of background investigation before USDOT will issue an ID card to the Contractor employee granting access to USDOT facilities, sensitive information, and information systems, or other USDOT resources. USDOT may accept favorable adjudications of background investigations from other Federal agencies when applicants have held PIV cards issued by those agencies with no break in service. USDOT may also accept PIV-I (interoperable) cards issued by an authorized PIV-I issuer as evidence of identity. A favorable adjudication does not preclude
C-34
USDOT from initiating a new investigation when deemed necessary. At a minimum, the FBI National Criminal History Check (fingerprint check) must be favorably completed before a USDOT identification card can be issued. Each Contractor must use the Office of Personnel Management’s (OPM) e-QIP system to complete any required investigative forms. Instructions for obtaining fingerprints will be provided by the COR or CO. The USDOT Office of Security, M- 40, or a USDOT organization delegated authority by M-40, is responsible for adjudicating the suitability of Contractor employees.
(f) Agency Access Denied. Upon contract award, USDOT will initiate the agency access procedure for all Contractor employees requiring access to USDOT facilities, sensitive information, information systems, and other USDOT resources for contract performance. USDOT may deny agency access to any individual about whom an adverse suitability determination is made. Failure to submit the required security information or to truthfully answer all questions shall constitute grounds for denial of access. The Contractor must not provide agency access to Contractor employees until the COR or CO provides notice of approval, which is authorized only by the USDOT Office of Security (M-40) or a USDOT organization delegated authority by M-40.
Where a proposed Contractor’s employees are denied agency access by the Government or, if for any reason proposed applications are withdrawn by the Contractor during the agency access process, the additional costs and administrative burden for conducting additional background investigations caused by a lack of effective pre-screening or planning on the part of the Contractor may be considered as part of the Contractor’s overall performance evaluation.
(g) Identification Card Application Process.
(1) The COR will be the USDOT ID card Sponsor and point of contact for the Contractor’s application for a USDOT ID card. The COR shall review and approve the USDOT ID card application before an ID card is issued to the applicant. An applicant may be issued either a Personal Identity Verification (PIV) card that meets the standards of the Homeland Presidential Security Directive (HSPD-12), or an applicant may be issued a non-PIV card. Generally, a non- PIV card will be issued for contracts that expire in six (6) months or less, including option periods.
The COR may request the issuing office to waive the six (6) month eligibility requirement when it is in USDOT’s interest for contract performance.
(2) The applicant must complete a USDOT online application for a PIV card. For a non-PIV card, the applicant must complete and submit a hard copy of Form 1681 to the COR/Sponsor.
Regardless of the type of card to be issued (PIV or non-PIV), the applicant must appear in person to provide two forms of identity source documents in original form to USDOT. The identity source documents must come from the list of acceptable documents included in Form I-9, OMB No. 1115- 0136, Employment Eligibility Verification. At least one document must be a valid State or Federal Government-issued picture identification. For a PIV card, the applicant may be required to appear in person a second time for enrollment and activation.
(h) Identification Card Custody and Control.
(1) The Contractor is responsible for the custody and control of all forms of Government identification issued by USDOT to Contractor employees for access to USDOT facilities, sensitive information, information systems, and other USDOT resources. The Contractor must immediately notify the COR or, if the COR is unavailable the CO, when a contractor employee no longer requires agency access due to transfer, completion of a project, retirement, removal from work on the contract, or termination of employment.
C-35
(2) The Contractor is responsible for maintaining and safeguarding the USDOT ID card upon issuance to the Contractor employee. Ensure that Contractor employees comply with USDOT requirements concerning the renewal, loss, theft, or damage of an ID card. The Contractor must immediately notify the COR or, if the COR is unavailable, the CO when an ID card is lost, stolen, or damaged.
(3) Failure to comply with the requirements for custody and control of USDOT ID cards may result in withholding final payment or contract termination based on the potential for serious harm caused by inappropriate access to USDOT facilities, sensitive information, information systems, or other USDOT resources.
(i) Renewal. A Contractor employee’s USDOT issued ID card is valid for a maximum of three (3) years or until the contract expiration date (including option periods), whichever occurs first. The renewal process should begin six (6) weeks before the PIV card expiration date. If a PIV card is not renewed before it expires, the Contractor employee will be required to sign-in daily for facility access and may have limited access to information systems and other resources.
(ii) Lost/Stolen. Immediately upon detection, the Contractor or Contractor employee must report a lost or stolen USDOT ID card to the COR, or if the COR is unavailable, the CO, the issuing office, or the local servicing security organization. The Contractor must submit an incident report within 48 hours, through the COR or, if the COR is unavailable, the CO, the issuing office, or the local security servicing organization describing the circumstances of the loss or theft. The Contractor must also report a lost or stolen PIV card through the USDOT online registration system. If the loss or theft is reported by the Contractor to the local police, a copy of the police report must be provided to the COR or CO. From the date of notification to USDOT, the Contractor must wait three (3) days before getting a replacement ID card. During the 3-day wait period, the Contractor employee must sign in daily for facility access.
(iii) Replacement. An ID card will be replaced if it is damaged, contains incorrect data, or is lost or stolen for more than 3 days, provided there is a continuing need for agency access to perform work under the contract.
(i) Surrender of ID Cards. Upon notification that routine access to USDOT facilities, sensitive information, information systems, or other USDOT resources is no longer required, the Contractor must surrender the USDOT issued ID card to the COR, or if the COR is unavailable, the CO, the issuing office, or the local security servicing organization following agency procedures.
(j) The Contractor is required to flow down this paragraph in any subcontracts that require the
Subcontractor or Subcontractor’s employees to have access to USDOT facilities, sensitive information, information systems, or other resources.
FHWA-005 -- HOMELAND SECURITY PRESIDENTIAL DIRECTIVE-12 (HSPD-12) (August 2004)
(a) Homeland Security Presidential Directive-12 was issued in response to the general threat of unauthorized persons gaining access to federal facilities and information systems. HSPD-12 requires all Federal agencies to use a common Personal Identity Verification (PIV) standard when identifying and issuing access rights to users of Federally controlled facilities and Federal Information Systems.
C-36
(b) To perform the work specified herein, Contractor personnel will require access to sensitive data, regular access to USDOT-controlled facilities, and access to USDOT information systems.
The Government has determined the position risk/sensitivity level under this effort to be low risk/non-sensitive.
(c) Accordingly, before any individual may obtain a USDOT identification card (new or replacement) authorizing him/her routine access to USDOT facilities, or logical access to USDOT's information systems, the individual must provide two forms of identity source documents in original form. One identity source document must be a valid Federal or state Government-issued picture identification card. USDOT Contractors must contact the USDOT servicing security organization to obtain the list of acceptable forms of documentation. Submission of these documents, and related background checks, are mandatory for the Contractor to receive a building access identification card, and before access will be granted to any of USDOT's information systems. Identification documents must be presented again to receive the card after it is manufactured. USDOT identification cards are Government property and must be returned when access to Government facilities or information systems is no longer authorized, e.g., upon the termination of employment, upon the Contractor's reassignment of the employee to a non- USDOT project, upon the termination of the contract, or upon demand by USDOT.
(d) The minimum Government investigation for a low-risk or non-sensitive position is a National
Agency Check and Inquiries (with fingerprinting), which consists of searches of records covering specific areas of a person's background during the past five (5) years. Those inquiries are sent to current and past employers, schools attended, references, and local law enforcement authorities. Higher-level positions, above low risk/non-sensitive, require more extensive documentation and investigation.
(e) To the greatest extent practicable, Contractors should ensure that the employees whose names they submit have a reasonable chance for access approval. Delays associated with rejections and consequent reinvestigations may not be excusable.
(f) Comply with all applicable HSPD-12 and PIV procedures, as described above, and any subsequent DOT or government-wide HSPD-12 and PIV procedures/policies, including any subsequent related DOT directives and required procedures.
(g) In the event of inconsistencies between this clause and later issued agency or government-wide HSPD-12 guidance, the most recently issued guidance shall take precedence unless otherwise instructed by the Contracting Officer.
(h) The Contractor is required to flow down this paragraph in any subcontracts that require the
Subcontractor or Subcontractor’s employees to have access to USDOT facilities, sensitive information, information systems, or other resources..
FHWA-006 -- Contractor Personnel Preprocessing, Background Investigation, and Information Security System Awareness Training (ISSAT)
(a) This FHWA local clause applies to contracts that have or will have Contractor Personnel (CP) working onsite in FHWA facilities, require Department of Transportation (DOT) network
C-37 access, require access to sensitive information, or access to DOT resources. The clause is issued to:
(1) Supplement DOT HSPD-12 Personal Identity Verification, TAR 1252.237-70 Qualifications of Contractor Employees, and TAR 1252.239-70 Security Requirements for Unclassified Information Technology Resources, as applicable;
(2) Provide detailed instructions for preprocessing CP and initiating background investigations;
(3) Implement the requirement for CP who work onsite in FHWA facilities or require DOT network access to submit proof of Information Security System Awareness (ISSA) training in conjunction with their background investigation request; and
(4) Provide information about the required ISSA training.
(b) CP shall not be permitted to begin work in USDOT facilities, have connectivity to the USDOT network, access sensitive information, OR access USDOT resources until documentation required to initiate a background investigation is received, ISSA training is completed, and authorization is received from USDOT Personnel Security. The initial process takes several business days and IS ONLY THE BEGINNING OF THE ACTUAL BACKGROUND INVESTIGATION. The Contractor, Program Manager (PM)/CP will be notified by USDOT Personnel Security via e-mail once CP are cleared to report for duty. While CP may report for duty, final clearance is granted only after the background investigation is complete. Completion of the background investigation can take months depending upon the actual investigation findings and the depth of investigation that results from those findings. The Government will provide the Contractor/PM/CP with all required forms to initiate a background investigation for use by CP.
Contractor/PM/CP shall complete and submit required forms for a background investigation as soon as possible after notification of selection for a position. It is imperative that the PM and CP respond promptly to any additional information requests from the COR, USDOT Personnel Security, or the Office of the Secretary of Transportation (OST) Security Office so that the process can be completed as efficiently and quickly as possible.
(c) Within five (5) days of selection for a position, Contractor employees shall submit all required forms and other items for a background security clearance to the WFL-COR Security Liaison (address and email below). The Government will provide the required security clearance investigation forms to the Contractor for use by the contractor employee. A contractor employee cannot begin work until the Contractor receives a Notice to Proceed or other official notification.
REQUIRED SECURITY DOCUMENTATION
DOCUMENT HOW TO SUBMIT
1. 2 Fingerprint cards (FD 258)
(Must use FD-258. If requested will be provided by WFL. The local sheriff’s office or police department is a viable option to obtain fingerprints.)
Send via U.S. Mail, FedEx or UPS to:
WFL-COR Security Liaison Western Federal Lands 610 E. 5th Street Vancouver, WA 98661
2. Current resume * SEND ELECTRONICALLY IN PDF
FORMAT UNLESS NOTED OTHERWISE
3. DOT 1600.8 Personnel Security Action Request (Must be typed.)
C-38
4. OF 306 Declaration for Federal Employment
Send items 2-4 in one email to Theresa.Roldan@dot.gov
NOTE: Some material may contain personally identifiable information (PII). FHWA uses security measures when storing and sending PII electronically.
It is recommended the Contractor Employee encrypt or password-protect documents and provide the code to the WFL-COR Security Liaison in a separate email.
5. SF-85 Questionnaire for Non-Sensitive
Positions Initiated and automatically uploaded through the e-QIP questionnaire.
(i) The DOT 1600.8 must be typed and submitted as the original electronic form (scanned copies will not be accepted). Include the following in block 8 of the DOT 1600.8:
(A) Contract Number:
(B) Contractor/Company Name and Address:
(C) Contract Period of Performance Start and End Date:
(ii) Use the full 4-digit year (i.e., 2022, 2023, etc.) in all instances.
(iii) Type the OF-306 when possible – it makes it easier to read – the DOT 1600.8 will not be accepted if it’s handwritten/scanned.
(iv) Preferred file naming convention is “Form number_last name, first name” (i.e. DOT
1600.8_Smith, John)
(v) If documentation cannot be sent electronically, send all hard copies in one package to the WFL COR Security Liaison.
(2) Upon receipt of Items 1-5, FHWA Personnel Security will email the Contractor
Employee’s address entered on the DOT 1600.8 with a link to the eQIP system. The link provides the Contractor Employee with access to item #9 above (SF-85) and eQIP application; the link is valid for only three (3) days.
(3) The Contractor Employee must access the link and follow the instructions to complete the questionnaire and forms within the three (3) day limit.
(4) If the Contractor Employee does not receive the eQIP email within four (4) days from the date the documentation for Items 1-5 is sent to WFL, the Contractor Company shall immediately email the COR and WFLCORSECURITYLIAISON@dot.gov.
(5) At the end of the eQIP questionnaire, the Contractor Employee must print, sign, release the application and scan the signature pages to upload into eQIP. If documentation cannot be scanned, the Contractor Employee must send the hard copies to the WFL COR Security Liaison.
(6) FHWA will not reimburse the Contractor for the time and expense incurred by the Contractor Employee to complete the paperwork or the eQIP questionnaire. The Contractor Employee will not have access to a government computer until the process is completed, and the employee is cleared.
(d) Once all of the items listed in the table above are received and processed by FHWA Personnel Security (PERSEC), the COR will notify the Contractor whether the Contractor Employee is cleared to report for duty.
C-39
(e) On the first day of work at WFL, the employee will be required to complete DOT Form 1631, Fair Credit Reporting; DOT Form 1681, ID Card Application (if a PIV is required); and ISSAT Rules of Behavior Certificate. Formal ISSAT training will be required via the DOT Learns platform once the employee has received their PIV card.
(f) This clearance process enables the Contractor Employee to report for duty. Final clearance is granted by the Office of the Secretary of Transportation (OST) after the background investigation is complete. Completing the background investigation can take months, depending upon the actual investigation findings and the depth of the investigation that results from those findings.
(g) The Contractor Company will be notified when an employee is determined unsuitable and will be required to withdraw or remove the Contractor Employee from all duties under this contract.
(h) The Contractor Company should contact the COR to determine the required documents for
Contractor Employees who were previously assigned to a contract with FHWA.
(i) This clause must flow down to subcontractors in its entirety.
(End of clause)
FHWA-007 -- Contractor Personnel Out-Processing
(a) This FHWA local clause applies to contracts that have or will have one or more of the following:
(1) Contractor Personnel (CP) working onsite in FHWA facilities;
(2) CP who require DOT network access;
(3) CP who require access to sensitive information; or
(4) CP who require access to DOT resources.
(b) It is the Contractor’s responsibility to ensure that CP properly out-process from FHWA when leaving a position supporting FHWA contract activities. All questions relating to out-processing FHWA should be directed to the CO or Contracting Officer’s Representative (COR).
(c) At a minimum, the following must be accomplished by the Contractor’s Program Manager or CP prior to CP departure from FHWA:
(1) Return ALL government property assigned to CP;
(2) Obtain all required signatures on the Western Federal Lands Highway Division Check-
In /Clearance Form for Contractors and submit the original to the COR; and
(3) Turn in Personal Identification Verification (PIV) card to the COR.
(d) The Contracting Officer (CO) may withhold payment of pending invoices until CP is properly out-processed.
(e) This clause must flow down to subcontractors in its entirety.
C-40
(d) The Federal Highway Administration utilizes the Contractor Performance Assessment
Reporting System (CPARS) to record and maintain past performance information. CPARS hosts a suite of web-enabled applications that are used to document contractor performance information that is required by Federal Regulations. The CPARS module assesses performance on contracts for Systems, Services, Information Technology, and Operations Support; Architect-Engineer contracts; and Construction contracts. Reference material can be accessed in CPARS.
(e) The registration process requires the Contractor to identify an individual that will serve as a primary contact. This individual will be authorized access to the evaluation for review and comment. In addition, the Contractor is encouraged to identify a secondary contact in the event the primary contact is unavailable to process the evaluation within the required 60-day time period. After the FHWA Focal Point registers the contract in CPARS, the contractor representative will receive a system-generated email notifying him/her that the contract is registered. A system-generated email will also provide the Contractor with a User ID if the person does not already have a CPARS User ID.
(f) After a performance evaluation has been prepared and is ready for comment, the
Contractor representative will receive a system-generated email notification that the performance evaluation is electronically available for review and comment. The Contractor representative will receive an automated email whenever an assessment is completed and can subsequently retrieve the completed assessment from CPARS for review and comment.
RESERVED
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .