Attachment 0002 - Certificate of Material Analysis_Redacted.pdf

PDF 103 KB Posted

Attached to
MJU 76B Igniter Bodies
Solicitation number
W519TC-23-Q-IGBO
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERTIFICATE OF ANALYSIS

For those material(s) identified below, a Certificate of Analysis (C of A) shall be provided to the government at time of delivery to CAAA (Crane Army Ammunition Activity). The information contained on the Certificate of Analysis shall be adequate to determine compliance with all applicable requirements of the material specification(s) listed below. Availability of the Certificate of Analysis may be in addition to other Purchase requirements and does not reduce or prejudice the Government’s right to inspect supplies under other provisions of this contract.

The certificate of analysis shall contain the following:

a. Name and address of Manufacturer and Supplier when *applicable. (*If not manufactured by the Supplier.)

b. Purchase order number.

c. Identification of material by drawings, description, specifications, revisions, and part number.

d. Quantity of material.

e. Material results shall address drawing specifications.

Item: Igniter Body.

Drawing DEV21004 Rev. R2

Development drawing.

(Air Force Drawing Reference 201825318).

Made from Material: XEONY 6370.

Required: 100% Virgin Material. No Reground Material Allowed.

Note: The igniter body shall be identifiable / traceable to the individual mold cavity.

Note: The igniter body shall be identified with a traceable lot number at time delivery. The lot number shall contain identification of manufacturer, date of production and should be exclusive to each production run.

(e. g. CRA23A001-001, Crane Army, manufactured January 2023, lot 1)

At time of delivery to CAAA, Item(s) cannot be accepted without documentation to support the above material was used to produce.

f. Quantity tested, sample size, and specimen type as applicable.

g. Date, signature, and title of the authorized representative of the contractor that is attesting to the accuracy of test report content.

Component: Igniter Body.

Requirements for: MJU-76/B Program

30 January, 2023

File details come from the government source that posted it. Updated .