Attachment 0002 - CDRL.pdf
PDF 593 KB Posted
- Attached to
- EXHAUST AND FAN WORK Federal contract opportunity
- Solicitation number
- W519TC-24-Q-2123
About this file
This Contract Data Requirements List (CDRL) outlines technical documentation requirements for an exhaust and fan equipment installation contract. The contractor must provide one paper copy of installation drawings and software details within 30 days of award, including electrical circuit requirements and any necessary utilities or filtration. A second copy must be delivered with the equipment. The documentation will be provided to David Holgerson at the Department of the Army Materiel Command Contracting Command Rock Island Arsenal under solicitation number W519TC-24-Q-2123 for exhaust and fan work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W519TC-24-Q-2123.pdf | ||
| Attachment 0001 - RIPD E4000-24-3-13.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
Air Compressor Cooling in B222
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation & Information Technology Documents
3. SUBTITLE
Installation Drawings and Software
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD250 REQ 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (1) copy of this information in paper format, a maximum of 30-calendar-days after contract award. The contractor shall provide a second copy of this information in paper format at the time of delivery of the equipment. Installation and Information Technology information will provided detailing utility feed requirements, and computer hardware and software data.
1) Installation Utility Feeds: Contractor shall provide electrical circuit size required for the equipment to be provided, and if other utilities may also be required (such as air). The contractor shall also identify whether filtration is needed.
PROVIDE COPIES TO THE FOLLOWING: David Holgerson
See Block 16
15. TOTAL
G. PREPARED BY
Tad Larson
H. DATE
December 11, 2023
I. APPROVED BY J. DATE
File details come from the government source that posted it. Updated .