Attachment 0002 -AED Requirements.pdf
PDF 61 KB Posted
- Attached to
- Overhaul of the CH-47 Shaft Assembly, Drive
- Solicitation number
- W58RGZ-21-B-0008
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04/14/2020
M609PRID 145D3400-23Part Number
1615-01-113-0248NSN CH-47System
SHAFT ASSY,DRIVENomenclature
YAdequate DMWR Available?
DMWR-55-1615-322DMWR ID
11/11/2016DMWR Date
DMWR Chg #
YPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
DMWR 55-1615-322 dated 11 November 2016 is in IADS.
Balance of the assembly within limits and recording by serial number and part number is a critical characteristic.
Shot peening coverage is a critical characteristic. An AMCOM/CCDEVCOM approved source shall be utilized when shot peening is a critical process. Approved sources shall be obtained from AMCOM.
Magnetic particle inspection is a critical characteristic. Magnetic particle inspection shall be done as per ASTM E1444 for cracks.
None allowed.
Fluorescent penetrant inspection is a critical characteristic. Fluorescent penetrant inspection shall be done as per ASTM E1417 for cracks. None allowed.
The applied torque during assembly is a critical characteristic as follows. Torque nut (P/N BACN10RJ9N) onto bolt (P/N 145DS306-1 or 114D3053-1) to 1000 to 1100 inch-pounds (wet). Turn nut only. Hold bolt head firmly to prevent bolt from turning. Lubricate all threads with oil (DOD-PRF-85734, MIL-PRF-7808 or MIL-PRF-23699).
Visual inspection of bearings IAW Bearing Manual, TM 55-150-322-24, is a critical characteristic.
Identify Any Special Processes, Test Procedures, and/or Instructions
YCritical Safety Item?
Per coordination with Cargo Division, there are no emerging airworthiness issues. The following ECP is in work and is summarized below:
The subject Drive Shaft is undergoing a redesign effort as part of the Improved Drive Train (IDT) program under the US Army's CH-47 Block II Aircraft Component Improvement Program (Block II ACIP). The IDT design changes are required to maintain positive ultimate margins and adequate fatigue lives at the increased horsepower and helicopter gross weight demands. The change to the Synchronizing Drive Shafts will impact the aluminum tube, riveted aluminum adapters, riveted splined adapters, and the associated riveted joints.
Special Airworthiness Considerations
FCDD-AMA-M-Sustainment has verified the CSI/NST status through the ARISE CIM on 4 March 2020 and the NHA is CSI and NST. The subcomponents are CSI and NST. Engineering testing, Fatigue, Endurance, and Interchange are not required for overhaul. Updated NHA table in ARISE database. No other changes. DEM
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
The Prime or OEM is required to submit a Frozen Plan 30 days after contract award to Engineering Directorate (ED) and Aviation Engineering Directorate (AED). The Frozen Plan will be reviewed and require approval by ED and AED prior to government acceptance of contract deliverable assets.
Other Requirements / Comments (Part II)
YDoes QE-STD-2 Apply?
Y
Additional CSI Requirements
CSI Contains CSI Replacement Parts? YEngineering Testing Required?
The Contractor shall flow down the Critical Characteristics and QE-STD-1 to all Suppliers of CSIs.
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
01/01/1987Approved Date
M&O AED REQUIREMENTS DATA
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
1615-01-113-0248NSN CH-47System
Special Post-Contract Award Requirements
The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEO(s) D2106, D2107 and D2108.
Other Requirements / Comments (Part III)
26 March 2020 - FCDD-AMA-M-Sustainment has re-verified the CSI/NST status through the ARISE CIM on 26 March 2020 and the NHA is CSI and NST. The subcomponents are CSI and NST. Engineering testing, Fatigue, Endurance, and Interchange are not required for overhaul. No changes made. DEM
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
RStatus
Correlation Performance Study Requirements
1615-01-113-0248NSN CH-47System
C4598
D1718A
D2106
D2107
D2108
D2128A
D2145
D2148
D2212A
D2213
D2214A
D2215
D2216
D2217
D2218
D2219A
D2220A
D2221
D2222
D2223
D2224
D2225B
D2226A
D2227
D2228
D2229A
D2230
D2231A
D2232
D2233
D2234
D2235
D2236
D2237
D2238
D2283
D2466
D2501
D2517
D2556
D2576
D2579
D2584
D2598
D2648
D2687
D2689
D2692
D2699
See Table 2-1 Special Tools and Equipment and Table 2-2 Inspection and Test Equipment
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
D1749 D2106A D2107A D2108A D2221A D2222A D2223A D2759
JacksonKL Line
JacksonKL Line
JacksonKL Line
JacksonKL Line
JacksonKL Line
JacksonKL Line
File details come from the government source that posted it. Updated .