This document is a Contract Data Requirements List (CDRL) DD Form 1423-1 for a Dot Peen Marking Machine procurement by the Department of the Army. The CDRL outlines five specific data items the contractor must provide with equipment delivery:
- Installation and Preparation Documentation (in multiple subtypes):
- Installation Documentation List
- Tool List
- Footprint Drawing
- Electrical Schematic
- Equipment Identification
- Maintenance Manual with Preventive Maintenance Procedure
- Operator Manual
- Pre-Shipment Testing Report
Each document has specific submission requirements, including providing 3 copies (2 paper, 1 electronic) 60 calendar days prior to equipment delivery, with acceptable electronic formats including .pdf, .dxf, .doc, and .igs files. The documentation must include detailed information such as installation procedures, tool lists, equipment schematics, operation modes, maintenance schedules, and pre-shipment testing results. The preparation date for this CDRL is 06-Jan-2025, associated with solicitation number W519TC-25-Q-2139 for a Portable Dot Peen Machine.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 0001 RIPD E4000-24-3-27 Dot Peen Marking Machine.pdf | ||
| W519TC-25-Q-2139 Released.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 8 Pages
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
Dot Peen Marking Machine
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Installation Documentation List
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD250 REQ 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in either electronic or paper format, a minimum of 60-calendar-days prior to delivery of equipment. The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A plainly visible cover sheet shall be provided with the Installation and Preparation Documentation package listing drawings and schematics required for installation.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
SEE BLOCK 16
15. TOTAL
G. PREPARED BY H. DATE
06-Jan-2025
I. APPROVED BY J. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 8 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
Dot Peen Marking Machine
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Tool List
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD250 REQ 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in either electronic or paper format, a minimum of 60-calendar-days prior to delivery of equipment. The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
An itemized list of all fixtures, tools, and equipment, whether special or not, required to install, align, and maintain the equipment in this purchase description. NOTE: The contractor is responsible for providing special/custom tools and equipment necessary for installation, moving, and/or set-up as part of the equipment.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
SEE BLOCK 16
15. TOTAL
G. PREPARED BY H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 8 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
Dot Peen Marking Machine
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Footprint Drawing
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD250 REQ 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information either in electronic or paper format, a minimum of 60-calendar-days prior to delivery of equipment. The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).
A dimensioned drawing shall be provided to accurately depict the layout of system, showing contours. It shall be fully dimensioned and include net operating clearance for moving components which travel beyond the gross contour. The drawing shall distinguish between the base of the equipment at floor level and the gross contour where it may overhang the base.
Location of access doors for servicing of the equipment shall also be designated.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
SEE BLOCK 16
15. TOTAL
G. PREPARED BY H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 8 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
Dot Peen Marking Machine
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Electrical Schematic
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD250 REQ 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information either in electronic or paper format, a minimum of 60-calendar-days prior to delivery of equipment. The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).
The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
SEE BLOCK 16
15. TOTAL
G. PREPARED BY H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 8 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
Dot Peen Marking Machine
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Identification
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD250 REQ 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information either in electronic or paper format, a minimum of 60-calendar-days prior to delivery of equipment.
This document shall consist of the make & model of the equipment with a complete list of standard features, optional features being installed in order to meet the specification, and a list of optional features available for field installation but not included. Each section shall be clearly identified.
Also included will be any technical data or brochures applicable to the equipment being provided.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
SEE BLOCK 16
15. TOTAL
G. PREPARED BY H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 8 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
Dot Peen Marking Machine
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Maintenance Manual
3. SUBTITLE
Preventive Maintenance Procedure
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD250 REQ 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).
This section of the documentation shall include: Daily Operator Checklist, Visual Inspections, and a Lubrication Schedule. Procedures and schedules for inspections, adjustments, cleaning, and component replacements.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
SEE BLOCK 16
15. TOTAL
G. PREPARED BY H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 7 of 8 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
Dot Peen Marking Machine
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Operator Manual
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD250 REQ 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and initial graphic exchange specification (.igs).
This section of the documentation shall include: Procedures for safe operation of the equipment in all modes. It shall include information necessary for performing all the operations and utilizing all the functions listed in the purchase description.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
SEE BLOCK 16
15. TOTAL
G. PREPARED BY H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 8 of 8 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
Dot Peen Marking Machine
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Pre-Shipment Testing Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD250 REQ 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (1) copies of this information in paper format no later than 10-calendar-days prior to delivery of the equipment.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
SEE BLOCK 16
15. TOTAL
G. PREPARED BY H. DATE
File details come from the government source that posted it. Updated .