Attachment 0001 SOW - HazMat Building.pdf

PDF 171 KB Posted

Attached to
USPFO Hazardous Material Building Repair Federal contract opportunity
Solicitation number
W9127P26QA004
Issued by
Department of the Army National Guard

About this file

This Statement of Work (SOW) details repairs for the Virgin Islands Army National Guard's (VIARNG) United States Property and Fiscal Office (USPFO) Hazardous Material Building located on the Estate Bethlehem Military Compound in St. Croix. The project scope includes removing and replacing three metal roll-up doors, removing and installing new roof panels covering 672 square feet, installing interior and exterior solar lighting, pressure washing the entire building, applying two coats of exterior paint, and replacing eight existing hazardous material signs.

The contractor must complete all work within 90 calendar days of receiving the Notice to Proceed, following specific requirements including obtaining necessary permits, providing direct supervision, submitting product specifications for approval, and adhering to strict security protocols. All personnel must be legally authorized to work in the United States, wear safety vests, complete mandatory security trainings like AT Level I and iWatch Program, and maintain a daily project log. The contractor will provide a one-year limited warranty on the work and must follow all federal and territorial safety and building codes throughout the project.

View the file

Other files for this federal contract opportunity

Other files attached to USPFO Hazardous Material Building Repair, newest first.
File Type Posted
Notice ID_ W9127P26QA004_Industry Questions and Answers 9 Dec 25_Updated.pdf PDF
Solicitation - W9127P26QA004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VIRGIN ISLANDS ARMY NATIONAL GUARD

STATEMENT OF WORK (SOW)

FOR

USPFO HAZARDOUS MATERIAL BUILDING REPAIRS

3 November 2025

Statement of Work (SOW)

USPFO Hazardous Material Building Repairs

1. General. The objective of this project is to repair and refresh multiple areas of the

Virgin Islands Army National Guard (VIARNG) United States Property and Fiscal Office

(USPFO) Hazardous Material Building.

a. Background. The USPFO Hazardous Material Building is used to store hazardous material designated for disposal by VIARNG. The building is located on the Estate Bethlehem Military Compound (EBMC) on the island of St. Croix, U.S.

Virgin Islands.

b. Scope. The contractor shall provide all personnel, labor, materials, equipment, tools, supervision and transportation necessary to perform the complete repairs as defined in the SOW. Work includes removal and disposal of three (3) metal roll-up doors; installation of new metal roll-up doors; removal and disposal of metal roof panels; installation of new roof panels; installation of new interior and exterior solar lights; and painting of the exterior of the building.

c. Specific Tasks. The contractor shall:

• Be responsible for obtaining all necessary permits and approvals for the work to be performed in accordance with local, state and federal regulations.

• Provide direct supervision over all aspects of the work and maintain control of personnel assigned to the project.

• Submit product specifications and materials to the Contracting Officer for approval prior to ordering and delivery.

• Remove three (3) existing metal roll-up doors (8’ x 10’) including existing track system and springs. Dispose of all old doors and materials offsite and in accordance with all applicable laws.

• Verify that the door frames and surrounding structure are prepared and leveled to receive the new doors.

• Install, in accordance with manufacturer’s specifications, three (3) new weatherproof, manual, roll-up, metal doors with new tracks. The doors shall be operable by hand with smooth, consistent motion and must be securely locked when fully closed.

• Remove the existing 672 square feet of roof covering including the existing standing seam panels, fasteners, flashing and associated components (not including ridge or rafters). Dispose of all removed materials in accordance with local waste management regulations. After the existing roof covering is removed, inspect the roof deck, ridge and rafters for any damage or deterioration. Any required repairs or reinforcements to the roof deck structure must be reported to and approved by the Construction and Facilities Management Office (CFMO) –

Byron A. Todman or Andrea Bryan-McIntosh. Once repair and/or reinforcement work is approved, work will not commence until a scope modification to the existing contract has been completed.

• Install 672 square feet of new standing seam galvanized roofing panels, ensuring they are aligned, secured, and weathertight. Panels must be installed in accordance with the manufacturer’s guidelines, with appropriate overlap and seam locking to prevent water infiltration. Install any necessary flashing, ridge caps and trim to ensure a fully integrated and watertight roofing system.

• Demolish and repair 30 lineal feet of 24” deep concrete bond beam complete with reinforcing steel.

• Install three (3) solar-powered indoor lights in pre-determined locations within the building. Locations should be chosen to ensure even lighting coverage for safety and operational efficiency. Lights are to be switch controlled. For integrated systems, ensure that all wiring is securely routed and properly insulated to prevent damage. Use conduit where necessary to protect cables and wiring. Install batteries or power storage units for each light in a safe and accessible location, ensuring proper ventilation.

• Install three (3) solar-powered outdoor lights at the doors. Mount each outdoor light fixture securely to the wall. Run the necessary wiring from the solar panel to the light fixture while ensuring that all cables are secure and weatherproof. Ensure that the battery or power storage system for each outdoor light is installed in a safe, accessible location, protected from extreme weather conditions.

• Pressure wash all surfaces (3,000 sf) of the building to remove dirt, dust and contaminants. Pressure wash both interior and exterior of the building. The walls, ceiling and floor are to be washed.

• Apply two (2) coats of paint to the exterior of the structure. Paint approximately 1,100 sf of wall surface. Paint color to match the existing building.

Ensure finished surfaces are free from streaks, runs and other imperfections.

• Replace eight (8) existing hazardous and caution/danger signs with new signs.

d. All warranties should be in accordance with manufacturer’s specifications.

Contractor will provide a limited warranty of 1 year from date of acceptance. The limitation of this warranty would not include improper applications or repairs.

e. Site Clean-Up: Remove all tools, equipment, and materials from the job site.

Ensure the site is left clean and free from debris. Contractor shall maintain housekeeping of all areas within the jobsite, including lawn maintenance and ensuring the jobsite is free of unnecessary trash. The installation does not provide garbage containers. The contractor is responsible for waste management, garbage collection and disposal of all waste generated from this project. Contractor shall maintain disposal logs, records and manifests for review and inspection upon request.

f. Work Duration and Schedule. The contractor shall be required to perform the work during the hours of 8:00 a.m. and 5:00 p.m., Mondays to Fridays except on

Federal holidays. Arrangements to work at different times or days must be coordinated through the Construction and Facilities Management Office (CFMO) to gain access to the facility.

g. Performance Requirements. The contractor and its employees shall be subject to and shall at all times conform with any and all rules, regulations, policies and procedures pertaining to the security at the facilities. Any violations or disregard for the rules, regulations and policies may be cause for immediate termination of the contractor.

• Performance Period. The contractor shall complete all work within 90 calendar days of receiving the Notice to Proceed (NTP).

• Work Schedule. Work shall be performed during normal duty hours (unless otherwise approved) to minimize operational disruptions.

h. Quality Assurance. All work shall comply with the standards expressed in the

Federal and Territorial Building Codes. The contractor shall submit a Quality

Assurance Plan (QAP) to monitor and evaluate performance for review and approval of the Contracting Officer. The plan shall include routine inspections, service checklists, technician signoffs and customer feedback tracking. The Government reserves the right to inspect work at any time to ensure compliance with performance standards.

i. Submittals. The contractor shall submit technical data, documents and specifications to the CFMO at the following email addresses:

byron.a.todman.civ@army.mil and andrea.a.bryan-mcintosh.civ@army.mil. Provide carbon copy (cc) to VING Security Branch at: ng.vi.viarng.mbx.g34@army.mil.

mailto:byron.a.todman.civ@army.mil mailto:andrea.a.bryan-mcintosh.civ@army.mil mailto:ng.vi.viarng.mbx.g34@army.mil

j. Deliverables

• Technical data, documents, specifications and certifications.

• Maintenance Plan, Quality Assurance Plan and schedule of work.

2. Project Management and Coordination

a. Project Coordination/Point of Contact

• The contractor shall always have supervisory point of contact on the jobsite during the workday. This person shall have the authority to act on behalf of the prime contractor. A list of all key personnel to include phone numbers and email addresses shall be submitted to the CFMO.

• The submission of a proposal by a contractor shall be accepted as prima facie evidence that they have examined all aspects of the work required and has satisfied themselves as to the nature and location of the work and all matters that can affect the work or cost thereof under this agreement. Any failure of the contractor to acquaint themselves with all available information including physical survey of the site of the proposed work will not relieve them from successfully performing all work for a complete and acceptable job.

• The above brief outline of principal features of the work in no way limits the responsibility of the contractor to perform all work and furnish all labor and materials required by the specifications. Any omission from the specifications or misdescription there shall not relieve the contractor from performing all the work required or furnishing the materials necessary to completely fulfill the intent of the contract.

• The contractor shall confine operations at the jobsite to areas permitted by the CFMO or his representative. The contractor shall not unreasonably encumber the jobsite with materials or equipment and shall assume full responsibility for the protection and safekeeping of the products stored on the premises.

b. Safety

• Safety requirements shall be in accordance with all Federal and Territorial laws and codes. The current Department of Labor Occupational Safety and

Health regulations will govern the overall job safety program. The guidance from current version of the USACE EM 385-1-1 is also acceptable for the overall job safety program.

• The contractor will not, under any circumstance, permit any person to enter the work areas without the appropriate protective clothing and equipment.

• For the safety and security of all personnel, the work area and equipment must be secured at all times. The contractor will ensure that no unauthorized personnel enter the work area.

c. Security

• The contractor and their employees shall at all times produce and display picture identification identifying the individual as an employee of the vendor.

• The contractor shall comply with all regulations imposed by the base/post commander and/or agency occupying the space where work is to be performed.

Any necessary security clearances shall be obtained prior to commencement of work.

• It is expected that new security requirements to satisfy contractor personal identification requirements in Homeland Security Presidential Directive (HSPD-

12), “Policy for a Common Identification Standard for Federal Employees and

Contractors,” and Federal Information Processing Standards Publication (FIPS

PUB) Number 201, “Personal Identity Verification (PIV) of Federal Employees and Contractors” will be enacted during the life of this contract. The contractor shall comply with all requirements at no additional cost to the Government.

• The contractor shall ensure that all parts of the facility where work is being performed are adequately protected against vandalism and theft.

• The contractor shall follow instructions provided by the Security Forces for access to the Estate Bethlehem Military Compound. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support or performance of services, please contact the Contracting Officer. Be sure that all of your employees have the proper identification (driver’s license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away. A list of all employees’ full legal names shall be submitted for clearance by the Security Forces.

• The prime contractor and all its subcontractors will be required to wear safety vests while performing work on the installation.

• The U.S. Government will not be held liable for any delays or breach of contract caused by refusal of the Security Forces to allow entry.

• All prospective contractors MUST be U.S. citizens or MUST have established and maintained legal residence in the U.S. and are authorized by the U.S.

Government to work in the U.S. (i.e. Green Card, work authorization, etc.). All prospective contractors MUST have at least one form of U.S. Government issued photo identification (drivers’ license, U.S. Passport, U.S. work visa, etc.) for entry to the installation.

• All prospective contractors/contractor employees are subject to a Criminal

History Check to enter the facility.

• Note: For the purposes of contracting services, it is implied that all parties agree to a Criminal History Background Check once entered into any contract.

Any documents that are provided and found to be fraudulent to include, but not limited to driver’s license, contractor’s license, etc. will result in an arrest and potential termination for default from the contract. All contractors are subject to search in order to obtain entry onto the installation and while working on the installation. Any refusal to submit to a search of their person or vehicle will be deemed as a violent act of aggression against the installation and will be cause for dismissal from the installation and revocation of future privileges and installation access.

d. Security Training

• AT Level I Training. All contractor employees, including subcontractor employees, requiring access to National Guard installations and facilities shall complete AT Level I Awareness Training. The contractor shall submit certificates of completion for each employee and subcontractor employee within 15 days of contract award to the VIARNG Security Branch Office and CFMO. AT Level I

Awareness Training is available at the following website:

https://jko.jten.mil/courses/AT-level1/launch.html.

• iWatch Program. The contractor and all employees, subcontractors and their employees shall coordinate to receive the iWatch training from the Anti-https://jko.jten.mil/courses/AT-level1/launch.html

Terrorism Office and the Physical Security Officer within 15 calendar days of contract award. New employees shall be trained within 15 days of being hired to work on this project. Please watch the short “iWatch Video” on how you, as a contractor, can be vigilant and report suspicious activities – See Something, Say

Something – as you perform your job in support of the U.S. Army contract.

(Approximately 8 min and 28 sec). The video can be found at https://www.mepcom.army.mil/Home/Contractors/.

• OPSEC Training. This web-based course provides Operational Security

(OPSEC) awareness for military members, government employees and contractors. The course provides information on the basic need to protect unclassified information about operations and personal information to ensure safe and successful operations and personal safety. The course can be found at https://securityawareness.dcsa.mil/opsec/index.htm.

• Submit the certificate of completion to the Security Branch at ng.vi.viarng.mbx.g34@army.mil and CFMO at byron.a.todman.civ@army.mil and andrea.a.bryan-mcintosh.civ@army.mil.

3. Existing Features. None

4. Items Needed by A 3rd Party

Testing, Certifications, Etc. The contractor shall submit the qualifications of any required Independent Testing and Inspection Agent in advance for approval. All test results shall be submitted to the CFMO.

5. Reporting Information

a. Routine Reporting and Invoicing

• Invoices shall be submitted after receipt of final acceptance in Wide Area

Workflow (WAWF). See contract clause 252.232-7006 for specifics.

• The contractor shall maintain a Daily Project Log consisting of a 3-ring binder.

The daily project log will be utilized each day to document the following:

a. Date and time of the project.

b. Name of competent person and qualifications.

https://www.mepcom.army.mil/Home/Contractors/ https://securityawareness.dcsa.mil/opsec/index.htm mailto:ng.vi.viarng.mbx.g34@army.mil mailto:byron.a.todman.civ@army.mil mailto:andrea.a.bryan-mcintosh.civ@army.mil

c. Brief description of daily work activities.

d. Work area sign-in and sign-out sheet/log.

• All waste disposal tickets for hazardous materials (final disposal manifest, if applicable.

b. Personnel Qualifications. All personnel shall be legal to work in the United

States and its territories.