Attachment 0001 - Construction Form for Contractor Proposal.xls

XLS spreadsheet 185 KB Posted

Attached to
Install Access Control Point Gate Ft. Meade, MD (MD008) Federal contract opportunity
Solicitation number
W15QKN-20-R-5058
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This document contains an attachment providing a construction form template for contractor proposals related to a solicitation by the Department of the Army Materiel Command Contracting Command Picatinny Arsenal. The form template includes sheets for contractors to provide details on construction tasks required such as labor, equipment, materials, and pricing. Contractors must also specify crew skill sets, labor hours, unit costs, and totals for labor, equipment, materials, overhead, profit, bonds, and other expenses. The related solicitation requests proposals to install an access control point gate at Fort Meade in Maryland. No other requirement details are provided beyond referring to attached solicitation documents.

View the file

Other files for this federal contract opportunity

Other files attached to Install Access Control Point Gate Ft. Meade, MD (MD008), newest first.
File Type Posted
W15QKN-20-R-5058 Questions and Answers Amendment 0001.pdf PDF
W15QKN-20-R-5058-0001.pdf PDF
Attachment 0004 - Site Drawing - Install Acess Control Point CSS 3840.pdf PDF
Attachment 0003 - GDN MD2020039 dated 26 June 2020.pdf PDF
Attachment 0002 - SOW CSS3840.pdf PDF
W15QKN-20-R-5058.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

IDSortTypeDescription (to include labor,equipment, material type and grade)QuantityUnit MeasureLabor in ManhoursEquipmentMaterialTotal Cost
Crew (skill set)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Unit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost
Totals
GENERAL CONTRACTOR
OVERHEAD$ - 0
$ - 0
PROFIT$ - 0
$ - 0
BOND$ - 0
G & A$ - 0
GRAND TOTAL$ - 0
Unit Cost*Cost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours"