Attachment 00 SOW Section C ERFO 2019 Repairs.docx

DOCX document 26 KB Posted

Attached to
NC-2019 ERFO Repairs Road Construction & Stream Restoration
Solicitation number
12445224R0015
Issued by

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to repair 10 fill bank failure sites, realign approximately 800 feet of road and stream sections, and perform stream restoration work along National Forest Service Road 982 in the Linville Gorge Area of North Carolina.

The project has an estimated price range of $1,000,000 to $5,000,000 and a period of performance from June 3, 2024 to October 15, 2025. It requires the contractor to perform various work items including construction survey, temporary traffic control, soil erosion and pollution control, culvert removal and installation, earthwork, geotextile installation, riprap placement, aggregate placement, roadway reconditioning, seeding, mulching, and fertilizing. The contractor must also submit a written and approved safety plan prior to project commencement. The Forest Service will obtain the necessary stream preservation permits, and the contractor must adhere to the permit stipulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION C—DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1 PROJECT DESCRIPTION AND LOCATION

(a) Description of Work.

The project along NFSR 982 Mortimer Piedmont includes the repair of 10 fill bank failure sites with MSE and geo-reinforced designs and the realignment of road and stream sections approximately 800 feet long. Work will also include stream restoration component. The project also includes three additional repairs of fill bank failures along roads 45, 981, and 464. Other work items include but are not limited to: construction survey and staking, temporary traffic control, soil erosion and pollution control, culvert removal and installation, earthwork geotextile installation, riprap placement, aggregate placement, roadway reconditioning, culvert installation, seeding, mulching, & fertilizing, and all other items necessary to complete the project in accordance with the plans and specifications.

(b) Project Location

Craigs Creek Crossings on National Forest Service Road 982 Mortimer Piedmont Mile Post 1.61 and 1.82 of Linville Gorge Area. Coordinates: 35.957302, -81.774646

(c) Price Range. $1,000,000 to $5,000,000

(d) Pre-bid Tour. Yes

(e) Pre-bid Conference. Yes

(f) Start Work. It is estimated that once the contract is awarded, a notice to proceed for materials will be issued. Work can begin June 3rd , 2024. Contract time will run continuously with no shutdown.

(g) Period of Performance. Contract is to be completed by October 15th, 2025.

(h) Safety Plan. A written and approved safety plan in accordance with applicable regulations such as FARS, OSHA, etc. is required prior to commencement of project work. The Safety Plan is also part of the criteria in evaluation of responsive bidders. Contractor shall provide adequate safety briefings and ensure safe practices are followed from all personnel involved in the project. Emergency contact numbers shall be readily available on site.

(i) Submittals. Contractor is responsible for and shall submit, at a minimum and at addressed times, all items listed within FSSS (Forest Service Supplemental Specification).

(j) Permits. The Forest Service will obtain the necessary stream preservation permits for this project and the contractor is responsible for adhering to the stipulations of these permits.

C-2 SPECIFICATIONS

This project makes use of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) U.S. Customary Units. FP-14 is included by reference only and can be found on the internet at the following website: https://flh.fhwa.dot.gov/resources/specs/

C-3 – FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS)

The following Forest Service Supplemental Specifications are a part of this solicitation and any resulting contract and are made a separate attachment. Supplemental Specifications (FSSS) include additions and revisions to the Standard Specifications (FP-14).

FSSS No.
DESCRIPTION

Preface

101
Terms, Format, and Definitions
102
Bid, Award, and Execution of Contract
103
Scope of Work
104
Control of Work
105
Control of Material
106
Acceptance of Work
107
Legal Relations and Responsibility to the Public
108
Prosecution and Progress
109
Measurement and Payment
152
Construction Survey and Staking
154
Contractor Sampling and Testing
155
Schedules for Construction Contracts
157
Soil Erosion and Sediment Control
201
Clearing and Grubbing
203
Removal of Structures and Obstructions
204
Excavation and Embankment
207
Earthwork Geotextiles
251
Rip Rap
302
Minor Crushed Aggregate
303
Road Reconditioning
602
Culverts and Drains
625
Turf Establishment
635
Temporary Traffic Control

File details come from the government source that posted it. Updated .