Attachemnts Location Map Illustration Sketch and Photos I and M Statton Park - dock repair.pdf

PDF 7 MB Posted

Attached to
DNR WM G Stratton Boat Dock Repairs
Solicitation number
21-422DNR-REALT-B-16519
Issued by
Grundy County, Illinois

About this file

This document is an attachment to a state and local contract opportunity issued by the Illinois Department of Natural Resources (IDNR) for dock repair work at the William G. Stratton State Park located in Morris, Grundy County, Illinois. The scope of work includes the replacement of 3 dock floats, 2 pipe anchor floats, 2 ADA handrail returns, and 1 ADA handrail/guardrail. The contractor is responsible for field verifying all existing conditions, materials, sizes, and components to match replacements in kind. The contract is for routine maintenance and selected replacement activities to restore the dock to its original design situated on the Illinois River.

The contract does not provide any details on pricing terms, set asides, incumbents, funding requirements or sources, or contract values. The document does not contain any legal language, contract clauses, or other non-essential information. Overall, this attachment provides the technical scope of work and details for the dock repair project being procured by IDNR.

View the file

Other files

File Type Posted
Standard Certifications.doc DOC document
Scope of Work Large~7.docx DOCX document
SMALL CONSTRUCTION BID FORM~72.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Loca�on

DOCK

A D

A G

A N

G W

Y

APPROX 80’, V.I.F.

P

P R

O X

V .I

.F

EXTG PIPE ANCHOR

REPLACE:

3—DOCK FLOATS

2—PIPE ANCHOR FLOATS

A P

P R

O X

V

.I .F

REPLACE:

2—ADA HANDRAIL RETURN

2—DETACHED OR BROKEN TRUSS /FRAME

REPLACE:

1—ADA HANDRAIL /GUARDRAIL, V.I.F. SIZE

1—DOCK FLOATS

1—DETACHED OR BROKEN TRUSS/FRAME

NOTES:

-EXISTING DOCK SYSTEM IS SHOREMASTER INC. PRODUCT.

-CONTRACTOR RESPONSIBLE FOR FIELD VERIFYING CONDITION , MA-

TERIALS, SIZES, COMPONENTS AND MATCHING ALL REPLACEMENTS IN

KIND.

File details come from the government source that posted it. Updated .