Attachemnt A - C-sUAS ESS IDIQ BASE PWS Draft.pdf
PDF 362 KB Posted
- Solicitation number
- 10172025
About this file
This Performance Work Statement (PWS) outlines requirements for Force Protection Counter-small Unmanned Aircraft Systems (C-sUAS) Sustainment, Engineering & Integration Support (SEIS) Services for the Air Force Life Cycle Management Center's Force Protection Division at Hanscom AFB, Massachusetts. The contract is an Indefinite Delivery/Indefinite Quantity (IDIQ) mechanism that will support the full lifecycle of C-sUAS products, including development, integration, testing, procurement, training, fielding, and sustainment for Air Force systems deployed in various configurations such as Fixed Site, Mobile, Portable, Transportable, and Handheld.
Key contractor responsibilities include system engineering and integration support, software development with semi-annual releases, procurement and fielding of C-sUAS systems for up to 53 CONUS and OCONUS sites, hard-kill system integration, inventory management, logistics support, maintenance, technical documentation preparation, training, and comprehensive program management. The contractor must also maintain high security standards, with personnel requiring at least a Secret security clearance, and comply with strict government property management, safety, and reporting requirements. The document is marked as a draft dated 29 July 2025 and is designated as Controlled Unclassified Information (CUI) with Distribution Statement C, limiting access to U.S. Government agencies and their contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Performance Work Statement (PWS) for
Force Protection Counter-small Unmanned Aircraft Systems (C-sUAS) Sustainment, Engineering & Integration Support (SEIS) Services
AIR FORCE LIFE CYCLE AND MANAGEMENT CENTER
FORCE PROTECTION DIVISION (AFLCMC/ESS)
HANSCOM AFB, MA
29 July 2025 (DRAFT)
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government Agencies and their contractors (Administrative/Operational Use) (29 Jan 2025). Other requests for this document shall be referred to Force Protection Division, (AFLCMC/ESS), 11 Eglin Street, Bldg. 1618, Hanscom AFB, MA 01731-2100.
Handling and Destruction Notice: For classified documents, DoD civilians or military personnel will follow the procedures outlined in DoDM 5200.01, Volume 3, Enclosure 3; DoD contractors will follow procedures outlined in DoDM 5220.22, sections 11-19. For sensitive unclassified documents, destroy by any method that will prevent disclosure of contents or reconstruction of this document.
Controlled by: AFLCMC/HB Controlled by: AFLCMC/HBU CUI Category: PROCURE Distribution Control: Distribution Statement C POC: Rebecca Kennery, rebecca.kennery@us.af.mil
DSN: 845-5012
mailto:rebecca.kennery@us.af.mil
Contents
1. Introduction
1.1. Purpose
1.2. Scope
2. Contractor Support Requirements
2.1. Transition Periods
2.1.1. Transition In
2.1.2. Transition Out
2.2. Capability development and Enhancement Support
2.3. System Procurement Support
2.4. Support of New C-sUAS Hard-Kill System Integration
2.5. C-sUAS System Sustainment Support
2.6. Program Management
2.7. Government Furnished Property
2.8. Security
3. Deliverables
4. General Requirements
4.1. Base Access and Support
4.2. Essential Services
4.3. Contractor Visit Requests
4.4. Contractor Manpower Reporting
4.5. Safety
4.6. Federal, State, and Local Law Violations
4.7. Duty Hours
5. Acronym List
1. Introduction The Air Force Life Cycle Management Center, Force Protection Division (AFLCMC/ESS) supports the United States Air Force (USAF) Security Forces (SF) by providing full lifecycle support for Air Base Air Defense (ABAD) capabilities. Included as part of these ABAD capabilities is Counter-small (Group 1, 2, & 3) Unmanned Aircraft Systems (C-sUAS).
AFLCMC/ESSprovides life cycle support of C-sUAS fielded equipment. The C-sUAS system is a Commercial Off the Shelf (COTS) and Government Off The Shelf (GOTS) System of Systems (SoS) design comprised of multiple sub-systems which have one or more physical components.
These disparate components and subsystems are connected via a Command-and-Control (C2) system that provides a Human-Machine-Interface (HMI) for the operator to perform their necessary functions. The SoS provides the capability to Detect, Identify, Track and Defeat small Unmanned Aircraft Systems (sUAS). Mission requirements have driven C-sUAS to be deployed in various configurations including Fixed Site, Mobile, Portable, Transportable, and Handheld.
This PWS defines requirements for the contractor to provide full lifecycle support to ensure the continued capability development, and to provide C-sUAS Operational Availability at all locations, both CONUS and OCONUS. These systems serve to protect Air Force assets.
1.1. Purpose
The purpose of this Indefinite Delivery/Indefinite Quantity (IDIQ) Performance Work Statement is to summarize the required tasks and support the contractor shall perform under individual task orders (TOs) to execute the Air Force Counter-small Unmanned Aircraft System (C-sUAS) program.
1.2. Scope
The scope of this effort is a broad range of development, integration, test, procurement, fielding, training, maintenance, and sustainment support provided by the contractor. This includes the necessary support and development of the system throughout the entirety of its lifecycle from concept to an operational state and from purchase to replacement or removal of the equipment. All sections of this PWS will be refined in future Task / Delivery Orders (TO/DOs). The contractor will be responsible for all sections and work as prescribed in this PWS.
2. Contractor Support Requirements The contractor provides the full life cycle support of C-sUAS products to include the development, integration, test support, procurement, training, fielding, and sustainment of AF C- UAS systems. This will include, but is not limited to, the following:
2.1. Transition Periods
2.1.1. Transition In
The contractor leads the transition of current development and sustainment work being conducted on expiring contracts from the incumbent contractors to the new contractor. The USG will act as the mediator in the transition period. The contractor is responsible for:
o Create the transition plan detailing the necessary milestones, actions, and documentation that will be generated.
o Execute the Transition Plan. The plan includes a detailed timeline of transition for their assigned duties.
o Use the Transition Plan to track completion of milestones documenting contractor readiness to assume the C-sUAS RDT&E, procurement, and sustainment workload
2.1.2. Transition Out
At the end of the PoP and/or when directed by the Government, the contractor shall participate in transition of all work from the expiring contract to the new contract/contractor, including but not limited to:
o Participate in Government or new contractor planning and status meetings o Transfer of program and system information, including but not limited to software code and documentation, engineering documentation, equipment status and inventories, etc., ensuring proper transfer of information o Transfer GFP as directed by the Government o The contractor will still be fully responsible for the services required until the end of the TO PoP.
o Perform a 100% physical inventory at equipment locations and storage locations, account for Return Material Authorization (RMA) equipment and reconcile all GFE discrepancies as needed.
o The contractor will employ processes and procedures for ensuring residual materials, critical documents, and all technical/management/other data are properly returned to the appropriate Government representatives for a seamless transition prior to final departure.
2.2. Capability development and Enhancement Support
As tasked by individual task orders, the contractor shall provide engineering support including, but not limited to:
o Systems Engineering and Integration support for sensors, software capabilities for Command and Control (C2) systems, effector capabilities, and Human Systems Integration (HSI) for operator controls and displays o Software RDT&E upgrades with planned semi-annual releases, with a goal of achieving quarterly SW updates including any necessary licenses, tools, apps, packages, updates, and other software services to ensure continued full operation of the system o SW maintenance and cyber security updates included in the above releases.
Perform development work in a Government approved DevSecOPs
Pipeline (DSOP).
The contractor will integrate cyber security throughout the development cycle.
o Support and perform sub-system software updates, upgrades, and patches, including provisions for SRR/PDR/CDR phases of the requirements, design documentation including Engineering Change Proposals (ECP), and test of new components.
o Test and Evaluation execution and support o Configuration management and status accounting o Initial documentation support. Prepare and issue Tech Orders o Spectrum management o Technical refresh support for C-sUAS hardware o Quality assurance / Quality control o Risk management
2.3. System Procurement Support
The contractor shall provide procurement support that includes site surveys, site design and preparation, and site installation of new equipment and system check-out. Activities include, but are not limited to:
o Fielding support for new C-sUAS systems for up to 53 CONUS and OCONUS AF sites, to be initiated immediately at Task Order award.
Site design with site survey support if needed, site preparation, and system installation Initial training of operational personnel o Procurement of limited C-sUAS systems and spares for fielding, including hard-kill systems and low collateral defeat systems.
2.4. Support of New C-sUAS Hard-Kill System Integration
The contractor shall provide support of new C-sUAS hard-kill system integration in the Medusa System of Systems. Activities include, but are not limited to:
o System integration and test o Live Fire Test and Evaluation (LFTE) planning, coordination, and support o Site Survey support for hard-kill systems o Fielding services for initial installation of new systems
2.5. C-sUAS System Sustainment Support
The contractor shall provide sustainment support for current and future C-sUAS systems.
Activities include, but are not limited to:
o Responsibility for providing and managing warehousing/storage locations, both CONUS and OCONUS as needed to support operational readiness o Integrated Logistics Support Plan o Inventory management and control of all Government Furnished Property (GFP)/
Government Furnished Equipment (GFE)/ Government Furnished Material
(GFM)
o Utilize a Government approved Logistics Management Information System (LMIS). The contractor will manage the database and modify configurations as necessary.
o Logistics data collection and performance metrics analysis and reporting, DMSMS management and reporting, level of repair analysis (LORA) o Implement and maintain an IUID Marking Plan for all delivered end items, Line Replaceable Units (LRUs) and identified spares o Packaging, Handling, Storage and Transportation (PHS&T) of equipment, spares, and GFM to include support and test equipment HAZMAT handling Management of shipping losses and/or missing Government property o Software sustainment to include cyber security updates, bug fixes, and other sustainment actions to full release on a periodic basis in a DevSecOPs Pipeline as defined in the TOs Operate and maintain a contractor system integration lab for the SW and integration support Provide fielding support for all SW updates o Sustainment data recommendations to address equipment sparing and equipment obsolescence, including obsolescence analysis addressing any end of production and end of support issues with a recommended replacement o Provide technical manuals and operational manuals, initial manuals as needed.
Prepare and issue Tech Orders.
o Provide fully trained Field Service Representatives (FSR) (appropriate to each location’s C-sUAS configuration) o Unscheduled maintenance response, including O-level maintenance, call-back support (24 hour help desk), fly-out support with FSRs, repair and return tracking/management, and warranty management for newer equipment and parts o Preventive Maintenance & Inspection of fielded and warehoused/stored equipment o Spares management and supply chain management o Provide fully trained organizational level on-site maintenance support o Provide Depot Level Maintenance, and coordination with OEMs and/or Depot
Source of Repair (DSOR) for repair services o Provide Operator, Maintainer, Administrator and Train-the-Trainer training o Sustainment engineering support to include Program Protection Plan support, Anti-Tamper plans, and implementation support
2.6. Program Management
The contractor shall provide program management support for the full scope of Task Orders being executed. Tasks include, but are not limited to:
o Conduct Post-Award Kick-Off Meeting, quarterly Program Management Reviews (PMRs), weekly Integrated Product Team (IPT) meetings, Technical Interchange Meetings (TIM), Design Reviews o Support Government requested meetings to include, but not limited to, change forums, deficiency reviews, technical discussions, sustainment, and DMSMS reviews Provide agendas, briefing materials, and meeting minutes as directed by the Government.
Support communication and meetings with OEMs and other Government organizations during execution of this PWS o Risk Management - perform ongoing program risk analysis within a process for identifying, tracking, and managing/mitigating cost, schedule, and performance risks o Configuration Management, Change Management, Data Management o Quality Assurance o Cost data and status reporting o Travel: Provide all travel arrangements, visas, insurance, business fees, taxes, and other associated travel requirements for personnel to meet the requirements of this
PWS.
The contractor will identify and support all pre-deployment requirements such as the use of Synchronized Pre-deployment and Operational Tracker (SPOT) database.
2.7. Government Furnished Property
The contractor will ensure accurate inventory of Government Furnished Property including equipment, tools, and materials procured for developmental or other use for all sites and storage locations. As part of the physical inventory, the contractor will assess the condition, quantity, and location of all GFP.
o The contractor shall record GFP in the LMIS IAW DoDI 5000.64 Accountability and Management of DoD Equipment and Other Accountable Property.
o The contractor will ensure all procurement actions taken on behalf of the Government are included as part of the GFE/GFP CAP Reporting CDRL.
o In addition, the contractor will include a DD 1150 property transfer form for each piece of equipment as part of the GFE/GFP CAP Reporting CDRL.
o The contractor will record results of site and storage locations inventory into the LMIS database. The contractor shall generate and deliver a GFP report.
o The Contractor shall determine, procure, repair, service, store, receive and dispose of unique spare parts and support equipment.
o The contractor shall perform property control and maintain a 98% or better inventory accuracy for unclassified components and 100% accountability for classified components.
o Maintain accountability records in the Air Force Accountable Property System of Record (APSR), the Enterprise Logistics Management System (ELMS) for property in the contractor’s possession.
o The contractor will replace, at their expense, any Government Furnished Property (GFP) not accounted for at time of turn-over.
2.8. Security
The contractor will possess the capability to receive, store, and generate classified information or material at the Secret level to fulfill the requirements identified in this PWS. Activities include, but are not limited to:
o Select personnel assigned to this task must possess a minimum of a Secret Security Clearance up to a Top Secret Clearance.
o The contractor will comply with the security requirements specified in the Contractor’s DD Form 254, Contract Security Classification Specification.
o The contractor will flow down the security requirements to subcontractors as applicable.
o The contractor will ensure all resources, including those subcontracted, are trained, qualified, and in place IAW the requirements of this PWS.
o The contractor will ensure that all personnel performing onsite labor, training, and management of this contract are U.S citizens and possess a current U.S. clearance no lower than SECRET.
o The contractor will ensure select personnel are able to possess or possess a U.S.
clearance of up to TOP SECRET.
o The contractor will follow the Security Classification Guides (SCG) as provided by the Government.
o The contractor will notify the Government Contracting Activity and the Government Security Manager within 48 hours, or local policy timeframe, whichever is more stringent, of any incident involving the actual or suspected compromise/loss of classified information to enable the Government to conduct immediate assessments of potential impact pending formal inquiry/investigation.
Actual or suspected compromise of Covered Defense Information will be reported IAW DFARS Clause 252.204-7012
3. Deliverables Deliverables will be defined in the applicable TOs. The CDRL data items will also be specified in the individual TOs.
4. General Requirements
4.1. Base Access and Support
The Government will provide authorized Contractor the required base access badges and access to the C-sUAS system for the effort described herein at each base after the contractor complies with the applicable local installation standards. The contractor will comply with all base, restricted, and controlled area access requirements such as attending local security training, safety briefings, and flight line training. Each base requiring C-sUAS support will determine their unique local requirements for base, controlled and restricted areas. Activities include but will not be limited to:
o The Government will provide a work area to support the sustainment of the C-sUAS. This will include a secure area, if available, to store C-sUAS equipment.
If an area is not available, as determined by the local SF unit commander or equivalent, the contractor will acquire a suitable alternative.
o The Government will provide, if available, at the location(s), specialty vehicles such as bucket trucks when in direct support of this task order. If a specialty vehicle is not available, as determined by the local SF commander or designated representative, the contractor will acquire a suitable alternative.
o The contractor will complete Government recognized safety training as required by individual bases.
o The local site personnel and/or the PMO will ensure all available drawings, manuals, and information associated with the C-sUAS program are turned over to the contractor upon assumption of maintenance responsibility.
o As directed by the Government the contractor will provide updated drawings when significant discrepancies are identified. Existing Government C-sUAS spares will be turned over by local SF unit and the contractor will subsequently maintain spares under contractor control until the end of the Period of Performance (PoP) of this contract.
o At the end of the PoP, the Contractor will return all C-sUAS spares and GFE tools to the Government for support of follow-on sustainment contracts.
4.2. Essential Services
These positions are designated as mission essential; therefore, services will be required when the facility is closed at the direction of the base/garrison commander. This includes base closure for inclement weather. The PCO, PM, or PCO designated representative or designated representative will notify the contractor’s POC if the facility is closed due to inclement weather or for other reasons. Emergency situations (i.e., accident and rescue operations, civil disturbances, natural disasters, military contingency operations, and exercises) may necessitate the contractor provide increased or reduced support as determined by the Contracting Officer.
4.3. Contractor Visit Requests
The contractor will submit requests for visit authorization IAW DOD 5220.22M (Industrial Security Manual for Safeguarding Classified Information).
4.4. Contractor Manpower Reporting
FY11 NDAA Section 8108 of Public Law 112-10 of the DoD and Full Year Continuing Appropriations Act, 2011. Data for Air Force (AF) service requirements must be input at the SAM link. The contractor will report all Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for C-sUAS Support via the Air Force secure data collection-site: www.sam.gov. The contractor will fill in completely all required data fields at the collection-site. Reporting inputs will be for the labor executed during the PoP for each Government Fiscal Year (FY) which runs 1 October through 30 September.
While inputs may be reported any time during the FY, all annual data will be reported no later than 31 October of each calendar year or the end of the PoP if prior to 31 October of each year.
Contractors may direct questions to the System for Award Management (SAM) help desk found at the collection-site. Information from the secure web site is proprietary in nature when the contract number and Contractor name are associated with the direct labor hours and direct labor https://usaf.dps.mil/teams/C-sUASCoreSustainmentTeam-SupportandSustainmentFollowonContract/Shared%20Documents/Support%20and%20Sustainment%20Follow%20on%20Contract/S&S%20Follow%20On%20Contract/PWS/www.sam.gov dollars. At no time will any data be released to the public with the contractor’s name and contract number associated with the data.
4.5. Safety
The contractor will coordinate with each base safety office and will be required to follow the guidance presented in the base safety briefing, covering topics such as: Occupational Safety and Health Administration, American National Standards Institute and National Fire Protection Agency standards, Mishap Reporting/Investigation, Environmental and HAZMAT Handling, Hazardous Chemical Reporting, Transporting HAZMAT, and Environmental Act Violations.
Activities include, but are not limited to:
o Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
o Perform work in a safe manner as required by OSHA 2206, General Industry, Occupational Safety and Health Standards (29 CFR 1910).
o If the base requires a safety plan prior to commencement of work on base, develop a safety plan for the protection of Government facilities and property and to provide a safe work environment for contractor personnel; ensure the plan complies with federal, state, local and base requirements, and make the plan available for base review upon request at the start of the orientation period (or start of the performance period if there is no orientation period).
o Provide protection to Government property to prevent damage during the period of time the property is under the control or in possession of the contractor.
o Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
o Record and report promptly (within one hour) to the contracting officer or designated Government representative (GR), all available facts relating to each instance of damage to Government property or injury to either contractor, subcontractor, or Government personnel.
o In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.
o If the Government elects to conduct an investigation of the accident/mishap, the contractor will cooperate fully and assist Government personnel in the conduct of investigation until the investigation is completed.
o Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.
o Ensure personnel have on-base emergency services phone numbers programmed into their cell phones.
4.6. Federal, State, and Local Law Violations
The contractor will perform the requirements of this contract in such a manner as to not violate any federal, state, local laws, or Country to include all Codes of Federal Regulations (Occupational Safety and Health Act, Environmental Protection Act). The contractor will be solely responsible for any reporting requirements and repercussions resulting from such violations. No work requirements directed in this PWS supersede applicable laws and regulations. However, if conflicts arise in the interpretation of applicable rules and regulations, the contractor will notify the PCO, PM, or PCO designated representative, in writing, and the PCO will make the final determination.
4.7. Duty Hours
Required duty hours will be defined in the individual TOs.
5. Acronym List AI - Action Item
ATO - Authorization To Operate
AFRL- Air Force Research Laboratory
AFLCMC - Air Force Life Cycle Material Command
BER - Beyond Economic Repair
C-sUAS - Counter small Unmanned Aircraft Systems
C2 - Command and Control
CA - Corrective Action
CAC - Common Access Card
COMSEC - Communication Security
COTS - Commercial off the Shelf
CONUS - Continental United States
CONOPS - Concept of Operation
CDRL - Contract Data Requirement List
CAP - Contractor Acquired Property
CF - Catastrophic Failure
CE - Security+ Continuing Education
CI - Critical Information
CCB - Configuration Control Board
DoD - Department of Defense
DFARS - Defense Federal Acquisition Regulation System
DRMO - Defense Reutilization and Marketing Offices
DMSMS - Diminishing Manufacturing Sources and Material Shortages
ELMS - Enterprise Logistics Management System
FAA - Federal Aviation Administration
FSP - Forward Supply Points
FSR – Field Service Representative
GFP - Government Furnished Property
GFE - Government Furnished Equipment
GR - Government Representative
GOTS - Government off the Shelf
HAZMAT - Hazardous Materials
ICS - Interim Contractor Support
IPT - Integrated Program Team
IAW - In Accordance With
IUID - Item Unique Identifier
IDIQ - Indefinite Delivery Indefinite Quantity
IMS - Integrated Master Schedule
LMIS - Logistics Management Information System
LRUs - Line Replaceable Units
MIL-STD - Military Standard
NRO - National Reconnaissance Office
OEM - Original Equipment Manufacturer
OCONUS - Outside Continental United States
OSHA - Occupational Safety and Health Standards
OPSEC - Operational Security
PHS&T - Packaging, Handling, Storage & Transportation
PM - Preventative Maintenance
PMRs - Program Management Reports
PO - Performance Objective
PoP - Period of Performance
PT - Performance Threshold
QA - Quality Assurance
RMA - Return Material Authorization
RMF - Risk Management Framework
SCG - Security Classification Guides
SCIF - Sensitive Compartmented Information Facility
SCRM - Supply Chain Risk Management
SF - Security Forces
SME - Subject Matter Experts
SRU - System Replaceable Unit
TAT - Turn Around Time
TIMs - Technical Interchange Meetings
USAF - United States Air Force
| 1. Introduction |
| 1.1. Purpose |
| 1.2. Scope |
| 2. Contractor Support Requirements |
| 2.1. Transition Periods |
| 2.1.1. Transition In |
| 2.1.2. Transition Out |
| 2.2. Capability development and Enhancement Support |
| 2.3. System Procurement Support |
| 2.4. Support of New C-sUAS Hard-Kill System Integration |
| 2.5. C-sUAS System Sustainment Support |
| 2.6. Program Management |
| 2.7. Government Furnished Property |
| 2.8. Security |
| 3. Deliverables |
| 4. General Requirements |
| 4.1. Base Access and Support |
| 4.2. Essential Services |
| 4.3. Contractor Visit Requests |
| 4.4. Contractor Manpower Reporting |
| 4.5. Safety |
| 4.6. Federal, State, and Local Law Violations |
| 4.7. Duty Hours |