Zone 1

Center Fuselage:

Zone 2

Empennage: Zone 3

Landing Gear: Zone 5

Wings: Zone 4

Engines: Zone 6

1-1 1-2 1-3

Zone 1-1: Require removal of corrosion followed by prime and paint

1-1

1-2

1-3

Zone 1-2: Damaged skin requires repair.

Zone 1-3: Requires removal of corrosion followed by prime and paint

1-4 1-5 1-6

1-4

1-5

1-6

Zone 1-4: Requires replacement of broken window.

Zone 1-5: Panels require removal of corrosion. Then fill panel seams with sealant to prevent further corrosion.

Zone 1-6: Window seams require sealing to avoid further corrosion.

1-7 1-8 1-9

1-7

1-8

1-9

Zone 1-7: Requires replacement of missing fasteners. Will also require sealing around the window.

Zone 1-8: Requires replacement of missing fasteners. Will also require sealing around window.

Zone 1-9: Requires replacement of missing fasteners. Will also require sealing around window.

2-1 2-2 2-3

2-1

2-2

2-3

Zones 2-1 and 2-2: Requires removal of corrosion and resealed along panel seams.

Zone 2-3: Requires removal of corrosion followed by prime and paint.

2-4 2-5 2-6

Zone 2-4: Requires removal of corrosion followed by sealing panel seams.

Zone 2-5: Requires removal of corrosion followed by prime and paint.

Zone 2-6: Panel requires repair followed by prime and paint.

2-4

2-5

2-6

2-7 2-8 2-9

Zone 2-7: Requires removal of corrosion followed by resealing panel seams.

Zone 2-8: Requires installation of door seals. Crew door will also require replacement of door knob.

Zone 2-9: Requires sheet metal repair along with resealing around windows.

3-1 3-2 3-3

3-1

3-2

3-3

Zones 3-1 and 3-2: Requires removal of corrosion followed by prime and paint.

Zone 3-3: Requires sealing along panel seams.

3-4 3-5 3-6

3-4

3-5

3-6

Zone 3-4: Requires removal of corrosion followed by resealing along the panels.

Zone 3-5: Requires sheet metal repair.

Zone 3-6: Requires removal of corrosion followed by prime and paint.

3-7 3-8 3-9

3-7

3-8

3-9

Zone 3-7: Skin requires sheet metal repair.

Zone 3-8: Requires sealant along seam of panels to prevent water intrusion.

Zone 3-9: Requires corrosion removal followed by prime and paint.

4-1 4-2 4-3

Zones 4-1, 4-2 and 4-3: Requires repair of skin along with removal of all Exfoliated Corrosion. May require repair to wing structure.

4-1

4-2

4-3

4-4 4-5 4-6

4-4

4-5

4-6

Zones 4-4 and 4-6: Requires repair to skin panels. Will also require removal of all Exfoliated Corrosion. May require repair to wing structure.

Zone 4-5: Requires removal of corrosion. Will also require replacement of all missing fasteners.

4-7 4-8 4-9

4-7

4-8

4-9

Zones 4-7, 4-8 and 4-9: Require sheet metal repair along with removal of all Exfoliated Corrosion.

4-10 4-11

Zones 4-10 and 4-11: Requires panel repair along with removal of all Exfoliated Corrosion.

4-12 4-13 4-14

4-12

4-13

4-14

Zone 4-12: Requires replacement of severely corroded Flap Hinge.

Zone 4-13: Requires removal of exfoliated corrosion followed by prime and paint.

Zone 4-14: Requires removal of corrosion followed by prime and paint.

5-1 5-2 5-3

5-1

5-3

Zone 5-1: Requires removal of corrosion on jack stands.

Zone 5-3: Requires removal of corrosion followed by prime and paint.

Zone 5-4: Requires removal of corrosion followed by Prime and Paint.

5-4

5-5 5-6 5-7

Zone 5-5: Requires removal of corrosion followed by prime and paint.

5-5

Zone 5-6: Requires skin repair and removal of corrosion. Will also require prime and paint.

5-6

6-1 6-2 6-3

6-1

6-2

6-3

Zone 6-1: Requires replacement of inlet-scoop.

Zone 6-2: Requires installation of loose hanging panel.

Zone 6-3: Requires installation of missing part.

Interior: Zone 7

7-1

Zone 7-1: Requires repair to Exfoliated Corrosion to Bulkhead.

7-2

Zone 7-2: Requires repair of Exfoliated Corrosion to window frame in flight deck.

7-3

Zone 7-3: Has evidence of water leaking which has caused corrosion damage. Recommend Sealing all seams on top of the aircraft. Followed by removing interior corrosion.

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 20
Slide Number 21
Slide Number 22
Slide Number 23
Slide Number 24
Slide Number 25
Slide Number 26
Slide Number 27
Slide Number 28
Slide Number 29
Slide Number 30
Slide Number 31
Slide Number 32
Slide Number 33
Slide Number 34
Slide Number 35
Slide Number 36
Slide Number 37
Slide Number 38
Slide Number 39
Slide Number 40
Slide Number 41
Slide Number 42

File details come from the government source that posted it. Updated .