Attachement 1 - Salient Characteristics.pdf
PDF 2 MB Posted
- Attached to
- Brand Name or Equal Parachute Packing Tables
- Solicitation number
- FA462025QA981
About this file
The document is a Salient Characteristics file for a Brand Name or Equal Parachute Packing Tables procurement at Fairchild Air Force Base in Washington. The Air Force requires the contractor to deliver and install 32 collapsible parachute packing tables from Spacesaver Corporation or an equivalent manufacturer. Key specifications include tables that are 45ft x 3ft x 3ft, with a wood top and epoxy plastic coating, built-in equipment storage with locking drawers, and the ability to collapse from 24 ft to 12 ft width to maximize facility space utilization.
The procurement stems from the loss of a free-fall parachute packing facility due to parachute simulator installation, necessitating a space-efficient solution. The tables must be placed on a 50ft x 32ft flat platform with electrical and manual moving capabilities, and must comply with Air Force Technical Order 14D3-11-1 Section 2.4 Para. 2.4.1. The total room space is 2,217 sq/ft, and the project references a similar completed installation at Hurlburt Field, Florida. The solicitation number is FA462025QA981, and the desired delivery is set for July 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach. 1 - Salient Characteristics (Amend 02).pdf | ||
| Amend 02 - SF 30.pdf | ||
| Amend 01 SF 30 QandA.PDF | ||
| 25QA981 Combo.pdf | ||
| Attachment 2 - TO 14D3-11-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALIENT CHARACTERISTICS
FOR
BRAND NAME OR EQUAL
PARACHUTE PACKING TABLES
July 2025
FA462025QA981 - Parachute Packing Tables Attach. 1 - Salient Characteristics
Salient Characteristics For
Brand Name or Equal Parachute Packing Tables
Fairchild AFB, WA
1. BACKGROUND: Following the loss of the entire free-fall parachute packing facility due to parachute simulator installation, acquisition of parachute packing tables with collapsible abilities as well as built in storage is now required to be able to accomplish parachute repacks necessary for mission requirements.
2. OBJECTIVES: Acquire collapsible parachute packing tables with built-in storage to utilize limited facility space following loss of freefall parachute section due to installation of parachute simulators.
3. REQUIREMENTS: The contractor shall deliver and install a total of thirty-two (32) BRAND NAME OR EQUAL Spacesaver Corporation collapsible parachute packing tables IAW the following salient characteristics:
a. Must follow guidelines outlined in Air Force Technical Order 14D3-11-1 Section 2.4 Para.
2.4.1
b. The tables in total will be 45ft x 3ft x 3ft each
i. Configuration should allow for eight (8) tables with built-in equipment stock storage underneath to be attached/combined into one (1) long table, for a total of four (4) long configured tables (see Appendix 1).
c. Tables should have a wood top with epoxy plastic coating with a satin finish
d. Tables must be placed on a flat flush platform system (50ft x 32ft) with built-in tracks with electrical and manual moving capabilities
e. Tables must also be able to collapse inward from 24 ft total width of space utilized to 12 ft condensed to utilize extra space for additional operations
f. Each table must have built-in equipment stock storage underneath along for all assets stored within the structure, with a locking system for accountability of parachute packing tools
i. Storage should be multiple drawers and have a key lock
Additional Information: Total square footage of room is 2217 sq/ft
4. APPENDICES:
APPENDIX 1: Current parachute packing floor layout APPENDIX 2: Desired parachute packing floor layout when system is fully collapsed APPENDIX 3: Blank Floor Plan APPENDIX 4: Photo of current upstairs space APPENDIX 5: Photo of the exact project completed at Hurlburt Field, FL
APPENDIX 1: Current parachute packing floor layout
APPENDIX 2: Desired parachute packing floor layout when system is fully collapsed
APPENDIX 3: Blank Floor Plan
APPENDIX 4: Photo of current upstairs space
APPENDIX 5: Photo of the exact project completed at Hurlburt Field, FL
File details come from the government source that posted it. Updated .