Attach5_Breakdown_W912C324Q0004_Generator B379_20240715.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
AMENDMENT 0001 Power Generator Installation, B379, Fort Buchanan, PR
Solicitation number
W912C324Q0004
Issued by

About this file

This document appears to be a proposal breakdown sheet associated with a Request for Quote (RFQ) for the replacement and installation of two generators at Building 379 at Fort Buchanan, Puerto Rico. The solicitation number is W912C324Q0004 and the work description includes the replacement and installation of two existing generators at the specified location.

The proposal breakdown sheet provides a line-item cost estimate for the materials, labor, and equipment required for the project. The total cost of the project is to be calculated based on the subtotals for each category, along with additional costs for overhead, profit, insurance, taxes, and bonds. The contract will be a Construction Firm Fixed-Price Contract, and the requirement is set aside for Small Businesses with a NAICS code of 238210 and a size standard of $19M. The magnitude of the requirement is between $100,000 and $250,000. The RFQ will be posted and accessed electronically on the SAM.gov website, and interested parties are responsible for monitoring the website for updates and amendments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT 1- PROPOSAL BREAKDOWN
Solicitation Number:W912C324Q0004
Description of Work:Replacement and Installation of Two 2 exisiting Generator Bldg. 379 at Fort Buchanan, PR 00934
Contractor:
WORK DESCRIPTIONMATERIALSLABOREQUIPMENT
QTYUNIT of MeasureUnit CostSUB-TOTALUnit CostSUB-TOTALUnit CostSUB-TOTALTOTAL
000$ - 0
000$ - 0
000$ - 0
000$ - 0
000$ - 0
000$ - 0
000$ - 0
000$ - 0
000$ - 0
000$ - 0
000$ - 0
SUBTOTAL (1) before overhead$ - 0$ - 0$ - 0$ - 0
OVERHEAD%- 0
SUBTOTAL (2) before Profit$ - 0
Profit%- 0
SUBTOTAL (3) Project cost$ - 0
Insurance%- 0
Municipal Patent and Taxes%- 0
Sales Taxes%- 0
Bonds%- 0
GRAND TOTAL$ - 0

File details come from the government source that posted it. Updated .