Exhibit-A
| SCHEDULE OF INDEFINITE QUANTITY WORK "A" |
| Exhibit A, Price for Ordering Period 1 |
| IDIQ EXTERIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS |
| NAF MISAWA, JAPAN |
| ePROJECT No. 1689228 |
| | Estimated | Unit of | | Estimated |
| Item No. | Description | Quantity | Issue | Unit Price | Amount |
| ELIN | | |
| A | 01 | Base Year | ¥ |
| | Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe. | |
| Sub ELIN | | Sub ELINs for ELIN A001 are listed hereunder. | |
1.1 SITE PREPARATION (Common)
| A | 001 | | Scaffolding (0-not exceed 7.5 meters high) | 3,000 | SM | ¥ | ¥ | 0 |
| A | 002 | | Scaffolding (7.5-not exceed 22.5 meters high) | 2,500 | SM | ¥ | ¥ | 0 |
| A | 003 | | Scaffolding (22.5-not exceed 38 meters high) | 500 | SM | ¥ | ¥ | 0 |
| A | 004 | | Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall | 1,000 | EA | ¥ | ¥ | 0 |
| A | 005 | | Additional Bracket Support for Scaffolding (W-500mm) | 200 | LM | ¥ | ¥ | 0 |
| A | 006 | | Additional Bracket Support for Scaffolding (W-900mm) | 1,500 | LM | ¥ | ¥ | 0 |
| A | 007 | | 45-ton Crane w/Worker Bucket per Day | 15 | Day | ¥ | ¥ | 0 |
| A | 008 | | Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket | | | | | |
| per Day | 15 | Day | ¥ | | ¥ | 0 | | | |
| A | 009 | Water Wash/Wire-Brush Cleaning | 500 | SM | ¥ | ¥ | 0 |
| A | 010 | Water Blast Cleaning (areas to be painted) | 7,000 | SM | ¥ | ¥ | 0 |
| A | 011 | Sandblast Cleaning (areas to be painted) | 100 | SM | ¥ | ¥ | 0 |
| A | 012 | Temporary Ground Protection Steel Sheets | 100 | SM | ¥ | ¥ | 0 |
| A | 013 | Excavate and Sodding to Paint Foundation | 100 | SM | ¥ | ¥ | 0 |
| A | 014 | Tree Branch Trimming & Disposal | 3 | TR | ¥ | ¥ | 0 |
1.2 SITE PREPARATION (INTERIOR/EXTERIOR)
| A | 015 | Portable Stepladder for Wall (Ceiling Height=below 3 meters) | 100 | LM | ¥ | ¥ | 0 |
| A | 016 | Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters) | 100 | SM | ¥ | ¥ | 0 |
| A | 017 | Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day | 50 | Day | ¥ | ¥ | 0 |
| A | 018 | Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day | 10 | Day | ¥ | ¥ | 0 |
| A | 019 | Temporary Shield and Ventilation System | 5 | SET | ¥ | ¥ | 0 |
1.3 REPAIR/REMOVAL WORK
A 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0
| A | 021 | Remove Floated Concrete Substrate (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
| A | 022 | Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
A 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0
A 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| A | 025 | Remove Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| A | 026 | Remove ACM Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| A | 027 | Remove Wood Chip Cement Board (WCCB) Siding | 20 | SM | ¥ | ¥ | 0 |
| A | 028 | Remove Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| A | 029 | Remove Metal Roofing | 50 | SM | ¥ | ¥ | 0 |
| A | 030 | Remove Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| A | 031 | Remove V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| A | 032 | Remove Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| A | 033 | Remove Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| A | 034 | Remove Downspouts with Stay Brackets (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| A | 035 | Remove Downspouts with Stay Brackets (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| A | 036 | Remove Vent Pipe with Union and Brackets (75mm dia) | 50 | LM | ¥ | ¥ | 0 |
| A | 037 | Remove Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| A | 038 | Lead-containing surface preparation with type 3 | 200 | SM | ¥ | ¥ | 0 |
| A | 039 | Lead-containing surface preparation with solvent cleaning | 200 | SM | ¥ | ¥ | 0 |
1.4 INSTALLATION
A 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| A | 041 | Install Hardboard Ceiling System (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| A | 042 | Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| A | 043 | Provide Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| A | 044 | Provide GSS Metal Roof System | 50 | SM | ¥ | ¥ | 0 |
| A | 045 | Provide V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| A | 046 | Provide Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| A | 047 | Provide Stainless Metal Surfaces | 20 | SM | ¥ | ¥ | 0 |
| A | 048 | Replace Stainless Hood Meshes | 20 | SM | ¥ | ¥ | 0 |
| A | 049 | Provide Metal Cover Roof System to Existing Roof | 200 | SM | ¥ | ¥ | 0 |
| A | 050 | Provide Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| A | 051 | Provide Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| A | 052 | Provide Downspouts with Stay Bracket (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| A | 053 | Provide Downspouts with Stay Bracket (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| A | 054 | Provide Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| A | 055 | Provide Sealing without Back-Up Foam | 300 | LM | ¥ | ¥ | 0 |
| A | 056 | Provide Asphalt Roofing Membrane for Metal Roof (24kg) | 50 | SM | ¥ | ¥ | 0 |
1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)
| A | 057 | Repair Unsound BUR with Cut & Patch (where Non-ACM BUR) | 150 | SM | ¥ | ¥ | 0 |
| A | 058 | Remove BUR where Non-ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| A | 059 | Disposal of Non-ACM BUR | 150 | SM | ¥ | ¥ | 0 |
| A | 060 | Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)
| A | 061 | Repair Unsound BUR with Cut and Patch (where ACM BUR) | 100 | SM | ¥ | ¥ | 0 |
| A | 062 | Remove BUR where ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| A | 063 | Disposal (Over 0.1%) to off-base landsite | 150 | SM | ¥ | ¥ | 0 |
| A | 064 | Remove/Reinstall Aluminum Edge Flashing System for ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.7 INSTALLATION TO BUILT-UP ROOF
| A | 065 | Overlay BUR System to Existing BUR | 100 | SM | ¥ | ¥ | 0 |
| A | 066 | Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR | 2,500 | SM | ¥ | ¥ | 0 |
| A | 067 | Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR | 500 | SM | ¥ | ¥ | 0 |
| A | 068 | Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer | 1,000 | SM | ¥ | ¥ | 0 |
| A | 069 | Replace Aluminum Edge Flashing System to Non- ACM BUR | 200 | LM | ¥ | ¥ | 0 |
| A | 070 | Replace Aluminum Edge Flashing System to ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.8 PAINTING WORK
A 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0
| A | 072 | | Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material) | 2,000 | SM | ¥ | ¥ | 0 |
| | | | Surfaces (Common by Local Mateial) | | | | | |
| A | 073 | | Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces | | | | | |
| (Common by Local Material) | 2,000 | SM | ¥ | | ¥ | 0 | | | |
| A | 074 | | Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall . | 100 | SM | ¥ | ¥ | 0 |
| | | | Surfaces, CMU Wall Surfaces, etc. | | | | | |
| A | 075 | | Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces, | | | | | |
| CMU Wall Surfaces, etc. | 100 | SM | ¥ | | ¥ | 0 | | | |
| A | 076 | Apply Repair-Coat on Existing BUR | 200 | SM | ¥ | ¥ | 0 |
| A | 077 | Additional Special Primer for Metal Surfaces | 4,000 | SM | ¥ | ¥ | 0 |
| A | 078 | Penetrative Water Repellent Coating for Concrete Surfaces | 250 | SM | ¥ | ¥ | 0 |
| A | 079 | Paint/Draw Building Letter and Number, including Wall Graphics | 20 | EA | ¥ | ¥ | 0 |
| A | 080 | Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth | 100 | SM | ¥ | ¥ | 0 |
1.9 QUANTITATIVE SURVEY REQUIREMENTS
| A | 081 | ACM/LBP Bulk Sampling | 50 | EA | ¥ | ¥ | 0 |
| A | 082 | Quantity Survey and Report (Class 0~not exceed 200 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| A | 083 | Quantity Survey and Report (Class 200~ not exceed 500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| A | 084 | Quantity Survey and Report (Class 500~ not exceed 1000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| A | 085 | Quantity Survey and Report (Class 1000~ not exceed 1500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| A | 086 | Quantity Survey and Report (Class 1500~ not exceed 2500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| A | 087 | Quantity Survey and Report (Class 2500~ not exceed 4000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| A | 088 | Quantity Survey and Report (Class 4000~ not exceed 6000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| A | 089 | Quantity Survey and Report (Class 6000~ not exceed 10000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen) | ¥ | 0 |
| (This amount is the same as the estimated amount of CLIN 0001 and ELIN A01 of Exhibit A) | | |
* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.
&8CUI//FEDCON (When filled in)
&10Exhibit A &10Page &P of &N
&10Exhibit A RFP No. FA5205-07-R-0002 &10Page &P of &N
&10Exhibit A &10Page &P of &N
&8CUI//FEDCON (When filled in) &9Page &P of &N
Exhibit-B
| SCHEDULE OF INDEFINITE QUANTITY WORK "B" |
| Exhibit B, Price for Ordering Period 2 |
| IDIQ EXTEIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS |
| NAF MISAWA, JAPAN |
| ePROJECT No. 1689228 |
| | Estimated | Unit of | | Estimated |
| Item No. | Description | Quantity | Issue | Unit Price | Amount |
| ELIN | | |
| B | 01 | Base Option one | ¥ |
| | Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings Rrepair / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe. | |
| Sub ELIN | | Sub ELINs for ELIN B001 are listed hereunder. | |
1.1 SITE PREPARATION (Common)
| B | 001 | | Scaffolding (0-not exceed 7.5 meters high) | 3,000 | SM | ¥ | ¥ | 0 |
| B | 002 | | Scaffolding (7.5-not exceed 22.5 meters high) | 2,500 | SM | ¥ | ¥ | 0 |
| B | 003 | | Scaffolding (22.5-not exceed 38 meters high) | 500 | SM | ¥ | ¥ | 0 |
| B | 004 | | Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall | 1,000 | EA | ¥ | ¥ | 0 |
| B | 005 | | Additional Bracket Support for Scaffolding (W-500mm) | 200 | LM | ¥ | ¥ | 0 |
| B | 006 | | Additional Bracket Support for Scaffolding (W-900mm) | 1,500 | LM | ¥ | ¥ | 0 |
| B | 007 | | 45-ton Crane w/Worker Bucket per Day | 15 | Day | ¥ | ¥ | 0 |
| B | 008 | | Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket | | | | | |
| per Day | 15 | Day | ¥ | | ¥ | 0 | | | |
| B | 009 | Water Wash/Wire-Brush Cleaning | 500 | SM | ¥ | ¥ | 0 |
| B | 010 | Water Blast Cleaning (areas to be painted) | 7,000 | SM | ¥ | ¥ | 0 |
| B | 011 | Sandblast Cleaning (areas to be painted) | 100 | SM | ¥ | ¥ | 0 |
| B | 012 | Temporary Ground Protection Steel Sheets | 100 | SM | ¥ | ¥ | 0 |
| B | 013 | Excavate and Sodding to Paint Foundation | 100 | SM | ¥ | ¥ | 0 |
| B | 014 | Tree Branch Trimming & Disposal | 3 | TR | ¥ | ¥ | 0 |
1.2 SITE PREPARATION (INTERIOR/EXTERIOR)
| B | 015 | Portable Stepladder for Wall (Ceiling Height=below 3 meters) | 100 | LM | ¥ | ¥ | 0 |
| B | 016 | Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters) | 100 | SM | ¥ | ¥ | 0 |
| B | 017 | Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day | 50 | Day | ¥ | ¥ | 0 |
| B | 018 | Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day | 10 | Day | ¥ | ¥ | 0 |
| B | 019 | Temporary Shield and Ventilation System | 5 | SET | ¥ | ¥ | 0 |
1.3 REPAIR/REMOVAL WORK
B 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0
| B | 021 | Remove Floated Concrete Substrate (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
| B | 022 | Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
B 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0
B 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| B | 025 | Remove Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| B | 026 | Remove ACM Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| B | 027 | Remove Wood Chip Cement Board (WCCB) Siding | 20 | SM | ¥ | ¥ | 0 |
| B | 028 | Remove Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| B | 029 | Remove Metal Roofing | 50 | SM | ¥ | ¥ | 0 |
| B | 030 | Remove Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| B | 031 | Remove V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| B | 032 | Remove Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| B | 033 | Remove Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| B | 034 | Remove Downspouts with Stay Brackets (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| B | 035 | Remove Downspouts with Stay Brackets (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| B | 036 | Remove Vent Pipe with Union and Brackets (75mm dia) | 50 | LM | ¥ | ¥ | 0 |
| B | 037 | Remove Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| B | 038 | Lead-containing surface preparation with type 3 | 200 | SM | ¥ | ¥ | 0 |
| B | 039 | Lead-containing surface preparation with solvent cleaning | 200 | SM | ¥ | ¥ | 0 |
1.4 INSTALLATION
B 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| B | 041 | Install Hardboard Ceiling System (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| B | 042 | Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| B | 043 | Provide Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| B | 044 | Provide GSS Metal Roof System | 50 | SM | ¥ | ¥ | 0 |
| B | 045 | Provide V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| B | 046 | Provide Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| B | 047 | Provide Stainless Metal Surfaces | 20 | SM | ¥ | ¥ | 0 |
| B | 048 | Replace Stainless Hood Meshes | 20 | SM | ¥ | ¥ | 0 |
| B | 049 | Provide Metal Cover Roof System to Existing Roof | 200 | SM | ¥ | ¥ | 0 |
| B | 050 | Provide Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| B | 051 | Provide Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| B | 052 | Provide Downspouts with Stay Bracket (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| B | 053 | Provide Downspouts with Stay Bracket (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| B | 054 | Provide Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| B | 055 | Provide Sealing without Back-Up Foam | 300 | LM | ¥ | ¥ | 0 |
| B | 056 | Provide Asphalt Roofing Membrane for Metal Roof (24kg) | 50 | SM | ¥ | ¥ | 0 |
1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)
| B | 057 | Repair Unsound BUR with Cut & Patch (where Non-ACM BUR) | 150 | SM | ¥ | ¥ | 0 |
| B | 058 | Remove BUR where Non-ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| B | 059 | Disposal of Non-ACM BUR | 150 | SM | ¥ | ¥ | 0 |
| B | 060 | Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)
| B | 061 | Repair Unsound BUR with Cut and Patch (where ACM BUR) | 100 | SM | ¥ | ¥ | 0 |
| B | 062 | Remove BUR where ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| B | 063 | Disposal (Over 0.1%) to off-base landsite | 150 | SM | ¥ | ¥ | 0 |
| B | 064 | Remove/Reinstall Aluminum Edge Flashing System for ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.7 INSTALLATION TO BUILT-UP ROOF
| B | 065 | Overlay BUR System to Existing BUR | 100 | SM | ¥ | ¥ | 0 |
| B | 066 | Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR | 2,500 | SM | ¥ | ¥ | 0 |
| B | 067 | Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR | 500 | SM | ¥ | ¥ | 0 |
| B | 068 | Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer | 1,000 | SM | ¥ | ¥ | 0 |
| B | 069 | Replace Aluminum Edge Flashing System to Non- ACM BUR | 200 | LM | ¥ | ¥ | 0 |
| B | 070 | Replace Aluminum Edge Flashing System to ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.8 PAINTING WORK
B 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0
| B | 072 | | Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material) | 2,000 | SM | ¥ | ¥ | 0 |
| | | | Surfaces (Common by Local Mateial) | | | | | |
| B | 073 | | Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces | | | | | |
| (Common by Local Material) | 2,000 | SM | ¥ | | ¥ | 0 | | | |
| B | 074 | | Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall . | 100 | SM | ¥ | ¥ | 0 |
| | | | Surfaces, CMU Wall Surfaces, etc. | | | | | |
| B | 075 | | Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces, | | | | | |
| CMU Wall Surfaces, etc. | 100 | SM | ¥ | | ¥ | 0 | | | |
| B | 076 | Apply Repair-Coat on Existing BUR | 200 | SM | ¥ | ¥ | 0 |
| B | 077 | Additional Special Primer for Metal Surfaces | 4,000 | SM | ¥ | ¥ | 0 |
| B | 078 | Penetrative Water Repellent Coating for Concrete Surfaces | 250 | SM | ¥ | ¥ | 0 |
| B | 079 | Paint/Draw Building Letter and Number, including Wall Graphics | 20 | EA | ¥ | ¥ | 0 |
| B | 080 | Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth | 100 | SM | ¥ | ¥ | 0 |
1.9 QUANTITATIVE SURVEY REQUIREMENTS
| B | 081 | ACM/LBP Bulk Sampling | 50 | EA | ¥ | ¥ | 0 |
| B | 082 | Quantity Survey and Report (Class 0~not exceed 200 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| B | 083 | Quantity Survey and Report (Class 200~ not exceed 500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| B | 084 | Quantity Survey and Report (Class 500~ not exceed 1000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| B | 085 | Quantity Survey and Report (Class 1000~ not exceed 1500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| B | 086 | Quantity Survey and Report (Class 1500~ not exceed 2500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| B | 087 | Quantity Survey and Report (Class 2500~ not exceed 4000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| B | 088 | Quantity Survey and Report (Class 4000~ not exceed 6000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| B | 089 | Quantity Survey and Report (Class 6000~ not exceed 10000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen) | ¥ | 0 |
| (This amount is the same as the estimated amount of CLIN 0001 and ELIN B01 of Exhibit B) | | |
* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.
&8CUI//FEDCON (When filled in)
&8CUI//FEDCON (When filled in) &9Page &P of & 3
Exhibit-C
| SCHEDULE OF INDEFINITE QUANTITY WORK "C" |
| Exhibit C, Price for Ordering Period 3 |
| IDIQ EXTEIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS |
| NAF MISAWA, JAPAN |
| ePROJECT No. 1689228 |
| | Estimated | Unit of | | Estimated |
| Item No. | Description | Quantity | Issue | Unit Price | Amount |
| ELIN | | |
| C | 01 | Base Option two | ¥ |
| | Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings Rrepair / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe. | |
| Sub ELIN | | Sub ELINs for ELIN C001 are listed hereunder. | |
1.1 SITE PREPARATION (Common)
| C | 001 | | Scaffolding (0-not exceed 7.5 meters high) | 3,000 | SM | ¥ | ¥ | 0 |
| C | 002 | | Scaffolding (7.5-not exceed 22.5 meters high) | 2,500 | SM | ¥ | ¥ | 0 |
| C | 003 | | Scaffolding (22.5-not exceed 38 meters high) | 500 | SM | ¥ | ¥ | 0 |
| C | 004 | | Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall | 1,000 | EA | ¥ | ¥ | 0 |
| C | 005 | | Additional Bracket Support for Scaffolding (W-500mm) | 200 | LM | ¥ | ¥ | 0 |
| C | 006 | | Additional Bracket Support for Scaffolding (W-900mm) | 1,500 | LM | ¥ | ¥ | 0 |
| C | 007 | | 45-ton Crane w/Worker Bucket per Day | 15 | Day | ¥ | ¥ | 0 |
| C | 008 | | Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket | | | | | |
| per Day | 15 | Day | ¥ | | ¥ | 0 | | | |
| C | 009 | Water Wash/Wire-Brush Cleaning | 500 | SM | ¥ | ¥ | 0 |
| C | 010 | Water Blast Cleaning (areas to be painted) | 7,000 | SM | ¥ | ¥ | 0 |
| C | 011 | Sandblast Cleaning (areas to be painted) | 100 | SM | ¥ | ¥ | 0 |
| C | 012 | Temporary Ground Protection Steel Sheets | 100 | SM | ¥ | ¥ | 0 |
| C | 013 | Excavate and Sodding to Paint Foundation | 100 | SM | ¥ | ¥ | 0 |
| C | 014 | Tree Branch Trimming & Disposal | 3 | TR | ¥ | ¥ | 0 |
1.2 SITE PREPARATION (INTERIOR/EXTERIOR)
| C | 015 | Portable Stepladder for Wall (Ceiling Height=below 3 meters) | 100 | LM | ¥ | ¥ | 0 |
| C | 016 | Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters) | 100 | SM | ¥ | ¥ | 0 |
| C | 017 | Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day | 50 | Day | ¥ | ¥ | 0 |
| C | 018 | Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day | 10 | Day | ¥ | ¥ | 0 |
| C | 019 | Temporary Shield and Ventilation System | 5 | SET | ¥ | ¥ | 0 |
1.3 REPAIR/REMOVAL WORK
C 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0
| C | 021 | Remove Floated Concrete Substrate (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
| C | 022 | Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
C 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0
C 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| C | 025 | Remove Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| C | 026 | Remove ACM Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| C | 027 | Remove Wood Chip Cement Board (WCCB) Siding | 20 | SM | ¥ | ¥ | 0 |
| C | 028 | Remove Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| C | 029 | Remove Metal Roofing | 50 | SM | ¥ | ¥ | 0 |
| C | 030 | Remove Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| C | 031 | Remove V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| C | 032 | Remove Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| C | 033 | Remove Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| C | 034 | Remove Downspouts with Stay Brackets (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| C | 035 | Remove Downspouts with Stay Brackets (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| C | 036 | Remove Vent Pipe with Union and Brackets (75mm dia) | 50 | LM | ¥ | ¥ | 0 |
| C | 037 | Remove Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| C | 038 | Lead-containing surface preparation with type 3 | 200 | SM | ¥ | ¥ | 0 |
| C | 039 | Lead-containing surface preparation with solvent cleaning | 200 | SM | ¥ | ¥ | 0 |
1.4 INSTALLATION
C 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| C | 041 | Install Hardboard Ceiling System (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| C | 042 | Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| C | 043 | Provide Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| C | 044 | Provide GSS Metal Roof System | 50 | SM | ¥ | ¥ | 0 |
| C | 045 | Provide V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| C | 046 | Provide Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| C | 047 | Provide Stainless Metal Surfaces | 20 | SM | ¥ | ¥ | 0 |
| C | 048 | Replace Stainless Hood Meshes | 20 | SM | ¥ | ¥ | 0 |
| C | 049 | Provide Metal Cover Roof System to Existing Roof | 200 | SM | ¥ | ¥ | 0 |
| C | 050 | Provide Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| C | 051 | Provide Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| C | 052 | Provide Downspouts with Stay Bracket (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| C | 053 | Provide Downspouts with Stay Bracket (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| C | 054 | Provide Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| C | 055 | Provide Sealing without Back-Up Foam | 300 | LM | ¥ | ¥ | 0 |
| C | 056 | Provide Asphalt Roofing Membrane for Metal Roof (24kg) | 50 | SM | ¥ | ¥ | 0 |
1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)
| C | 057 | Repair Unsound BUR with Cut & Patch (where Non-ACM BUR) | 150 | SM | ¥ | ¥ | 0 |
| C | 058 | Remove BUR where Non-ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| C | 059 | Disposal of Non-ACM BUR | 150 | SM | ¥ | ¥ | 0 |
| C | 060 | Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)
| C | 061 | Repair Unsound BUR with Cut and Patch (where ACM BUR) | 100 | SM | ¥ | ¥ | 0 |
| C | 062 | Remove BUR where ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| C | 063 | Disposal (Over 0.1%) to off-base landsite | 150 | SM | ¥ | ¥ | 0 |
| C | 064 | Remove/Reinstall Aluminum Edge Flashing System for ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.7 INSTALLATION TO BUILT-UP ROOF
| C | 065 | Overlay BUR System to Existing BUR | 100 | SM | ¥ | ¥ | 0 |
| C | 066 | Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR | 2,500 | SM | ¥ | ¥ | 0 |
| C | 067 | Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR | 500 | SM | ¥ | ¥ | 0 |
| C | 068 | Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer | 1,000 | SM | ¥ | ¥ | 0 |
| C | 069 | Replace Aluminum Edge Flashing System to Non- ACM BUR | 200 | LM | ¥ | ¥ | 0 |
| C | 070 | Replace Aluminum Edge Flashing System to ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.8 PAINTING WORK
C 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0
| C | 072 | | Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material) | 2,000 | SM | ¥ | ¥ | 0 |
| | | | Surfaces (Common by Local Mateial) | | | | | |
| C | 073 | | Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces | | | | | |
| (Common by Local Material) | 2,000 | SM | ¥ | | ¥ | 0 | | | |
| C | 074 | | Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall . | 100 | SM | ¥ | ¥ | 0 |
| | | | Surfaces, CMU Wall Surfaces, etc. | | | | | |
| C | 075 | | Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces, | | | | | |
| CMU Wall Surfaces, etc. | 100 | SM | ¥ | | ¥ | 0 | | | |
| C | 076 | Apply Repair-Coat on Existing BUR | 200 | SM | ¥ | ¥ | 0 |
| C | 077 | Additional Special Primer for Metal Surfaces | 4,000 | SM | ¥ | ¥ | 0 |
| C | 078 | Penetrative Water Repellent Coating for Concrete Surfaces | 250 | SM | ¥ | ¥ | 0 |
| C | 079 | Paint/Draw Building Letter and Number, including Wall Graphics | 20 | EA | ¥ | ¥ | 0 |
| C | 080 | Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth | 100 | SM | ¥ | ¥ | 0 |
1.9 QUANTITATIVE SURVEY REQUIREMENTS
| C | 081 | ACM/LBP Bulk Sampling | 50 | EA | ¥ | ¥ | 0 |
| C | 082 | Quantity Survey and Report (Class 0~not exceed 200 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| C | 083 | Quantity Survey and Report (Class 200~ not exceed 500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| C | 084 | Quantity Survey and Report (Class 500~ not exceed 1000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| C | 085 | Quantity Survey and Report (Class 1000~ not exceed 1500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| C | 086 | Quantity Survey and Report (Class 1500~ not exceed 2500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| C | 087 | Quantity Survey and Report (Class 2500~ not exceed 4000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| C | 088 | Quantity Survey and Report (Class 4000~ not exceed 6000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| C | 089 | Quantity Survey and Report (Class 6000~ not exceed 10000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen) | ¥ | 0 |
| (This amount is the same as the estimated amount of CLIN 0001 and ELIN C01 of Exhibit C) | | |
* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.
&8CUI//FEDCON (When filled in)
&8CUI//FEDCON (When filled in) &9Page &P of &N
Exhibit-D
| SCHEDULE OF INDEFINITE QUANTITY WORK "D" |
| Exhibit D, Price for Ordering Period 4 |
| IDIQ EXTEIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS |
| NAF MISAWA, JAPAN |
| ePROJECT No. 1689228 |
| | Estimated | Unit of | | Estimated |
| Item No. | Description | Quantity | Issue | Unit Price | Amount |
| ELIN | | |
| D | 01 | Base Optiom three | ¥ |
| | Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings Rrepair / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe. | |
| Sub ELIN | | Sub ELINs for ELIN D001 are listed hereunder. | |
1.1 SITE PREPARATION (Common)
| D | 001 | | Scaffolding (0-not exceed 7.5 meters high) | 3,000 | SM | ¥ | ¥ | 0 |
| D | 002 | | Scaffolding (7.5-not exceed 22.5 meters high) | 2,500 | SM | ¥ | ¥ | 0 |
| D | 003 | | Scaffolding (22.5-not exceed 38 meters high) | 500 | SM | ¥ | ¥ | 0 |
| D | 004 | | Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall | 1,000 | EA | ¥ | ¥ | 0 |
| D | 005 | | Additional Bracket Support for Scaffolding (W-500mm) | 200 | LM | ¥ | ¥ | 0 |
| D | 006 | | Additional Bracket Support for Scaffolding (W-900mm) | 1,500 | LM | ¥ | ¥ | 0 |
| D | 007 | | 45-ton Crane w/Worker Bucket per Day | 15 | Day | ¥ | ¥ | 0 |
| D | 008 | | Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket | | | | | |
| per Day | 15 | Day | ¥ | | ¥ | 0 | | | |
| D | 009 | Water Wash/Wire-Brush Cleaning | 500 | SM | ¥ | ¥ | 0 |
| D | 010 | Water Blast Cleaning (areas to be painted) | 7,000 | SM | ¥ | ¥ | 0 |
| D | 011 | Sandblast Cleaning (areas to be painted) | 100 | SM | ¥ | ¥ | 0 |
| D | 012 | Temporary Ground Protection Steel Sheets | 100 | SM | ¥ | ¥ | 0 |
| D | 013 | Excavate and Sodding to Paint Foundation | 100 | SM | ¥ | ¥ | 0 |
| D | 014 | Tree Branch Trimming & Disposal | 3 | TR | ¥ | ¥ | 0 |
1.2 SITE PREPARATION (INTERIOR/EXTERIOR)
| D | 015 | Portable Stepladder for Wall (Ceiling Height=below 3 meters) | 100 | LM | ¥ | ¥ | 0 |
| D | 016 | Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters) | 100 | SM | ¥ | ¥ | 0 |
| D | 017 | Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day | 50 | Day | ¥ | ¥ | 0 |
| D | 018 | Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day | 10 | Day | ¥ | ¥ | 0 |
| D | 019 | Temporary Shield and Ventilation System | 5 | SET | ¥ | ¥ | 0 |
1.3 REPAIR/REMOVAL WORK
D 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0
| D | 021 | Remove Floated Concrete Substrate (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
| D | 022 | Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
D 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0
D 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| D | 025 | Remove Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| D | 026 | Remove ACM Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| D | 027 | Remove Wood Chip Cement Board (WCCB) Siding | 20 | SM | ¥ | ¥ | 0 |
| D | 028 | Remove Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| D | 029 | Remove Metal Roofing | 50 | SM | ¥ | ¥ | 0 |
| D | 030 | Remove Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| D | 031 | Remove V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| D | 032 | Remove Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| D | 033 | Remove Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| D | 034 | Remove Downspouts with Stay Brackets (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| D | 035 | Remove Downspouts with Stay Brackets (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| D | 036 | Remove Vent Pipe with Union and Brackets (75mm dia) | 50 | LM | ¥ | ¥ | 0 |
| D | 037 | Remove Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| D | 038 | Lead-containing surface preparation with type 3 | 200 | SM | ¥ | ¥ | 0 |
| D | 039 | Lead-containing surface preparation with solvent cleaning | 200 | SM | ¥ | ¥ | 0 |
1.4 INSTALLATION
D 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| D | 041 | Install Hardboard Ceiling System (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| D | 042 | Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| D | 043 | Provide Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| D | 044 | Provide GSS Metal Roof System | 50 | SM | ¥ | ¥ | 0 |
| D | 045 | Provide V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| D | 046 | Provide Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| D | 047 | Provide Stainless Metal Surfaces | 20 | SM | ¥ | ¥ | 0 |
| D | 048 | Replace Stainless Hood Meshes | 20 | SM | ¥ | ¥ | 0 |
| D | 049 | Provide Metal Cover Roof System to Existing Roof | 200 | SM | ¥ | ¥ | 0 |
| D | 050 | Provide Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| D | 051 | Provide Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| D | 052 | Provide Downspouts with Stay Bracket (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| D | 053 | Provide Downspouts with Stay Bracket (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| D | 054 | Provide Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| D | 055 | Provide Sealing without Back-Up Foam | 300 | LM | ¥ | ¥ | 0 |
| D | 056 | Provide Asphalt Roofing Membrane for Metal Roof (24kg) | 50 | SM | ¥ | ¥ | 0 |
1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)
| D | 057 | Repair Unsound BUR with Cut & Patch (where Non-ACM BUR) | 150 | SM | ¥ | ¥ | 0 |
| D | 058 | Remove BUR where Non-ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| D | 059 | Disposal of Non-ACM BUR | 150 | SM | ¥ | ¥ | 0 |
| D | 060 | Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)
| D | 061 | Repair Unsound BUR with Cut and Patch (where ACM BUR) | 100 | SM | ¥ | ¥ | 0 |
| D | 062 | Remove BUR where ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| D | 063 | Disposal (Over 0.1%) to off-base landsite | 150 | SM | ¥ | ¥ | 0 |
| D | 064 | Remove/Reinstall Aluminum Edge Flashing System for ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.7 INSTALLATION TO BUILT-UP ROOF
| D | 065 | Overlay BUR System to Existing BUR | 100 | SM | ¥ | ¥ | 0 |
| D | 066 | Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR | 2,500 | SM | ¥ | ¥ | 0 |
| D | 067 | Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR | 500 | SM | ¥ | ¥ | 0 |
| D | 068 | Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer | 1,000 | SM | ¥ | ¥ | 0 |
| D | 069 | Replace Aluminum Edge Flashing System to Non- ACM BUR | 200 | LM | ¥ | ¥ | 0 |
| D | 070 | Replace Aluminum Edge Flashing System to ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.8 PAINTING WORK
D 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0
| D | 072 | | Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material) | 2,000 | SM | ¥ | ¥ | 0 |
| | | | Surfaces (Common by Local Mateial) | | | | | |
| D | 073 | | Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces | | | | | |
| (Common by Local Material) | 2,000 | SM | ¥ | | ¥ | 0 | | | |
| D | 074 | | Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall . | 100 | SM | ¥ | ¥ | 0 |
| | | | Surfaces, CMU Wall Surfaces, etc. | | | | | |
| D | 075 | | Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces, | | | | | |
| CMU Wall Surfaces, etc. | 100 | SM | ¥ | | ¥ | 0 | | | |
| D | 076 | Apply Repair-Coat on Existing BUR | 200 | SM | ¥ | ¥ | 0 |
| D | 077 | Additional Special Primer for Metal Surfaces | 4,000 | SM | ¥ | ¥ | 0 |
| D | 078 | Penetrative Water Repellent Coating for Concrete Surfaces | 250 | SM | ¥ | ¥ | 0 |
| D | 079 | Paint/Draw Building Letter and Number, including Wall Graphics | 20 | EA | ¥ | ¥ | 0 |
| D | 080 | Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth | 100 | SM | ¥ | ¥ | 0 |
1.9 QUANTITATIVE SURVEY REQUIREMENTS
| D | 081 | ACM/LBP Bulk Sampling | 50 | EA | ¥ | ¥ | 0 |
| D | 082 | Quantity Survey and Report (Class 0~not exceed 200 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| D | 083 | Quantity Survey and Report (Class 200~ not exceed 500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| D | 084 | Quantity Survey and Report (Class 500~ not exceed 1000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| D | 085 | Quantity Survey and Report (Class 1000~ not exceed 1500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| D | 086 | Quantity Survey and Report (Class 1500~ not exceed 2500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| D | 087 | Quantity Survey and Report (Class 2500~ not exceed 4000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| D | 088 | Quantity Survey and Report (Class 4000~ not exceed 6000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| D | 089 | Quantity Survey and Report (Class 6000~ not exceed 10000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen) | ¥ | 0 |
| (This amount is the same as the estimated amount of CLIN 0001 and ELIN D01 of Exhibit D) | | |
* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.
&8CUI//FEDCON (When filled in)
&8CUI//FEDCON (When filled in) &9Page &P of & 3
Exhibit-E
| SCHEDULE OF INDEFINITE QUANTITY WORK "E" |
| Exhibit E, Price for Ordering Period 5 |
| IDIQ EXTEIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS |
| NAF MISAWA, JAPAN |
| ePROJECT No. 1689228 |
| | Estimated | Unit of | | Estimated |
| Item No. | Description | Quantity | Issue | Unit Price | Amount |
| ELIN | | |
| E | 01 | Base Option four | ¥ |
| | Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings Rrepair / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe. | |
| Sub ELIN | | Sub ELINs for ELIN E001 are listed hereunder. | |
1.1 SITE PREPARATION (Common)
| E | 001 | | Scaffolding (0-not exceed 7.5 meters high) | 3,000 | SM | ¥ | ¥ | 0 |
| E | 002 | | Scaffolding (7.5-not exceed 22.5 meters high) | 2,500 | SM | ¥ | ¥ | 0 |
| E | 003 | | Scaffolding (22.5-not exceed 38 meters high) | 500 | SM | ¥ | ¥ | 0 |
| E | 004 | | Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall | 1,000 | EA | ¥ | ¥ | 0 |
| E | 005 | | Additional Bracket Support for Scaffolding (W-500mm) | 200 | LM | ¥ | ¥ | 0 |
| E | 006 | | Additional Bracket Support for Scaffolding (W-900mm) | 1,500 | LM | ¥ | ¥ | 0 |
| E | 007 | | 45-ton Crane w/Worker Bucket per Day | 15 | Day | ¥ | ¥ | 0 |
| E | 008 | | Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket | | | | | |
| per Day | 15 | Day | ¥ | | ¥ | 0 | | | |
| E | 009 | Water Wash/Wire-Brush Cleaning | 500 | SM | ¥ | ¥ | 0 |
| E | 010 | Water Blast Cleaning (areas to be painted) | 7,000 | SM | ¥ | ¥ | 0 |
| E | 011 | Sandblast Cleaning (areas to be painted) | 100 | SM | ¥ | ¥ | 0 |
| E | 012 | Temporary Ground Protection Steel Sheets | 100 | SM | ¥ | ¥ | 0 |
| E | 013 | Excavate and Sodding to Paint Foundation | 100 | SM | ¥ | ¥ | 0 |
| E | 014 | Tree Branch Trimming & Disposal | 3 | TR | ¥ | ¥ | 0 |
1.2 SITE PREPARATION (INTERIOR/EXTERIOR)
| E | 015 | Portable Stepladder for Wall (Ceiling Height=below 3 meters) | 100 | LM | ¥ | ¥ | 0 |
| E | 016 | Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters) | 100 | SM | ¥ | ¥ | 0 |
| E | 017 | Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day | 50 | Day | ¥ | ¥ | 0 |
| E | 018 | Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day | 10 | Day | ¥ | ¥ | 0 |
| E | 019 | Temporary Shield and Ventilation System | 5 | SET | ¥ | ¥ | 0 |
1.3 REPAIR/REMOVAL WORK
E 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0
| E | 021 | Remove Floated Concrete Substrate (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
| E | 022 | Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted) | 150 | SM | ¥ | ¥ | 0 |
E 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0
E 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| E | 025 | Remove Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| E | 026 | Remove ACM Hardboard Siding | 20 | SM | ¥ | ¥ | 0 |
| E | 027 | Remove Wood Chip Cement Board (WCCB) Siding | 20 | SM | ¥ | ¥ | 0 |
| E | 028 | Remove Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| E | 029 | Remove Metal Roofing | 50 | SM | ¥ | ¥ | 0 |
| E | 030 | Remove Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| E | 031 | Remove V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| E | 032 | Remove Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| E | 033 | Remove Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| E | 034 | Remove Downspouts with Stay Brackets (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| E | 035 | Remove Downspouts with Stay Brackets (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| E | 036 | Remove Vent Pipe with Union and Brackets (75mm dia) | 50 | LM | ¥ | ¥ | 0 |
| E | 037 | Remove Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| E | 038 | Lead-containing surface preparation with type 3 | 200 | SM | ¥ | ¥ | 0 |
| E | 039 | Lead-containing surface preparation with solvent cleaning | 200 | SM | ¥ | ¥ | 0 |
1.4 INSTALLATION
E 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0
| E | 041 | Install Hardboard Ceiling System (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| E | 042 | Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted) | 20 | SM | ¥ | ¥ | 0 |
| E | 043 | Provide Metal Siding | 50 | SM | ¥ | ¥ | 0 |
| E | 044 | Provide GSS Metal Roof System | 50 | SM | ¥ | ¥ | 0 |
| E | 045 | Provide V-folding Roofing (t=0.8mm class, H<=175mm) | 50 | SM | ¥ | ¥ | 0 |
| E | 046 | Provide Miscellaneous Metal Surfaces | 100 | SM | ¥ | ¥ | 0 |
| E | 047 | Provide Stainless Metal Surfaces | 20 | SM | ¥ | ¥ | 0 |
| E | 048 | Replace Stainless Hood Meshes | 20 | SM | ¥ | ¥ | 0 |
| E | 049 | Provide Metal Cover Roof System to Existing Roof | 200 | SM | ¥ | ¥ | 0 |
| E | 050 | Provide Gutter with Stay Brackets (Type 100) | 50 | LM | ¥ | ¥ | 0 |
| E | 051 | Provide Gutter with Stay Brackets (Type 200) | 50 | LM | ¥ | ¥ | 0 |
| E | 052 | Provide Downspouts with Stay Bracket (125mm dia) | 50 | LM | ¥ | ¥ | 0 |
| E | 053 | Provide Downspouts with Stay Bracket (175mm dia) | 50 | LM | ¥ | ¥ | 0 |
| E | 054 | Provide Sealing with Back-Up Foam | 3,000 | LM | ¥ | ¥ | 0 |
| E | 055 | Provide Sealing without Back-Up Foam | 300 | LM | ¥ | ¥ | 0 |
| E | 056 | Provide Asphalt Roofing Membrane for Metal Roof (24kg) | 50 | SM | ¥ | ¥ | 0 |
1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)
| E | 057 | Repair Unsound BUR with Cut & Patch (where Non-ACM BUR) | 150 | SM | ¥ | ¥ | 0 |
| E | 058 | Remove BUR where Non-ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| E | 059 | Disposal of Non-ACM BUR | 150 | SM | ¥ | ¥ | 0 |
| E | 060 | Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)
| E | 061 | Repair Unsound BUR with Cut and Patch (where ACM BUR) | 100 | SM | ¥ | ¥ | 0 |
| E | 062 | Remove BUR where ACM BUR | 100 | SM | ¥ | ¥ | 0 |
| E | 063 | Disposal (Over 0.1%) to off-base landsite | 150 | SM | ¥ | ¥ | 0 |
| E | 064 | Remove/Reinstall Aluminum Edge Flashing System for ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.7 INSTALLATION TO BUILT-UP ROOF
| E | 065 | Overlay BUR System to Existing BUR | 100 | SM | ¥ | ¥ | 0 |
| E | 066 | Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR | 2,500 | SM | ¥ | ¥ | 0 |
| E | 067 | Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR | 500 | SM | ¥ | ¥ | 0 |
| E | 068 | Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer | 1,000 | SM | ¥ | ¥ | 0 |
| E | 069 | Replace Aluminum Edge Flashing System to Non- ACM BUR | 200 | LM | ¥ | ¥ | 0 |
| E | 070 | Replace Aluminum Edge Flashing System to ACM BUR | 200 | LM | ¥ | ¥ | 0 |
1.8 PAINTING WORK
E 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0
| E | 072 | | Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material) | 2,000 | SM | ¥ | ¥ | 0 |
| | | | Surfaces (Common by Local Mateial) | | | | | |
| E | 073 | | Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces | | | | | |
| (Common by Local Material) | 2,000 | SM | ¥ | | ¥ | 0 | | | |
| E | 074 | | Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall . | 100 | SM | ¥ | ¥ | 0 |
| | | | Surfaces, CMU Wall Surfaces, etc. | | | | | |
| E | 075 | | Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces, | | | | | |
| CMU Wall Surfaces, etc. | 100 | SM | ¥ | | ¥ | 0 | | | |
| E | 076 | Apply Repair-Coat on Existing BUR | 200 | SM | ¥ | ¥ | 0 |
| E | 077 | Additional Special Primer for Metal Surfaces | 4,000 | SM | ¥ | ¥ | 0 |
| E | 078 | Penetrative Water Repellent Coating for Concrete Surfaces | 250 | SM | ¥ | ¥ | 0 |
| E | 079 | Paint/Draw Building Letter and Number, including Wall Graphics | 20 | EA | ¥ | ¥ | 0 |
| E | 080 | Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth | 100 | SM | ¥ | ¥ | 0 |
1.9 QUANTITATIVE SURVEY REQUIREMENTS
| E | 081 | ACM/LBP Bulk Sampling | 50 | EA | ¥ | ¥ | 0 |
| E | 082 | Quantity Survey and Report (Class 0~not exceed 200 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| E | 083 | Quantity Survey and Report (Class 200~ not exceed 500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| E | 084 | Quantity Survey and Report (Class 500~ not exceed 1000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| E | 085 | Quantity Survey and Report (Class 1000~ not exceed 1500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| E | 086 | Quantity Survey and Report (Class 1500~ not exceed 2500 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| E | 087 | Quantity Survey and Report (Class 2500~ not exceed 4000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| E | 088 | Quantity Survey and Report (Class 4000~ not exceed 6000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| E | 089 | Quantity Survey and Report (Class 6000~ not exceed 10000 square meters) | 1 | Unit | ¥ | ¥ | 0 |
| TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen) | ¥ | 0 |
| (This amount is the same as the estimated amount of CLIN 0001 and ELIN E01 of Exhibit E) | | |
* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.