Attach2_ELIN_Schedules_N4008422B7000.xlsx

XLSX spreadsheet 68 KB Posted

Attached to
IDIQ EXTERIOR PAINTING AND REPAIR FOR VARIOUS BUILDINGS AT U. S. NAVAL AIR FACILITY MISAWA, JAPAN
Solicitation number
N4008422B7000
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit-A

SCHEDULE OF INDEFINITE QUANTITY WORK "A"
Exhibit A, Price for Ordering Period 1
IDIQ EXTERIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS
NAF MISAWA, JAPAN
ePROJECT No. 1689228
EstimatedUnit ofEstimated
Item No.DescriptionQuantityIssueUnit PriceAmount
ELIN
A01Base Year¥
Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe.
Sub ELINSub ELINs for ELIN A001 are listed hereunder.

1.1 SITE PREPARATION (Common)

A001Scaffolding (0-not exceed 7.5 meters high)3,000SM¥¥0
A002Scaffolding (7.5-not exceed 22.5 meters high)2,500SM¥¥0
A003Scaffolding (22.5-not exceed 38 meters high)500SM¥¥0
A004Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall1,000EA¥¥0
A005Additional Bracket Support for Scaffolding (W-500mm)200LM¥¥0
A006Additional Bracket Support for Scaffolding (W-900mm)1,500LM¥¥0
A00745-ton Crane w/Worker Bucket per Day15Day¥¥0
A008Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket
per Day15Day¥¥0
A009Water Wash/Wire-Brush Cleaning500SM¥¥0
A010Water Blast Cleaning (areas to be painted)7,000SM¥¥0
A011Sandblast Cleaning (areas to be painted)100SM¥¥0
A012Temporary Ground Protection Steel Sheets100SM¥¥0
A013Excavate and Sodding to Paint Foundation100SM¥¥0
A014Tree Branch Trimming & Disposal3TR¥¥0

1.2 SITE PREPARATION (INTERIOR/EXTERIOR)

A015Portable Stepladder for Wall (Ceiling Height=below 3 meters)100LM¥¥0
A016Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters)100SM¥¥0
A017Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day50Day¥¥0
A018Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day10Day¥¥0
A019Temporary Shield and Ventilation System5SET¥¥0

1.3 REPAIR/REMOVAL WORK

A 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0

A021Remove Floated Concrete Substrate (areas to be painted)150SM¥¥0
A022Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted)150SM¥¥0

A 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0

A 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

A025Remove Hardboard Siding20SM¥¥0
A026Remove ACM Hardboard Siding20SM¥¥0
A027Remove Wood Chip Cement Board (WCCB) Siding20SM¥¥0
A028Remove Metal Siding50SM¥¥0
A029Remove Metal Roofing50SM¥¥0
A030Remove Miscellaneous Metal Surfaces100SM¥¥0
A031Remove V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
A032Remove Gutter with Stay Brackets (Type 100)50LM¥¥0
A033Remove Gutter with Stay Brackets (Type 200)50LM¥¥0
A034Remove Downspouts with Stay Brackets (125mm dia)50LM¥¥0
A035Remove Downspouts with Stay Brackets (175mm dia)50LM¥¥0
A036Remove Vent Pipe with Union and Brackets (75mm dia)50LM¥¥0
A037Remove Sealing with Back-Up Foam3,000LM¥¥0
A038Lead-containing surface preparation with type 3200SM¥¥0
A039Lead-containing surface preparation with solvent cleaning200SM¥¥0

1.4 INSTALLATION

A 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

A041Install Hardboard Ceiling System (areas to be painted)20SM¥¥0
A042Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted)20SM¥¥0
A043Provide Metal Siding50SM¥¥0
A044Provide GSS Metal Roof System50SM¥¥0
A045Provide V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
A046Provide Miscellaneous Metal Surfaces100SM¥¥0
A047Provide Stainless Metal Surfaces20SM¥¥0
A048Replace Stainless Hood Meshes20SM¥¥0
A049Provide Metal Cover Roof System to Existing Roof200SM¥¥0
A050Provide Gutter with Stay Brackets (Type 100)50LM¥¥0
A051Provide Gutter with Stay Brackets (Type 200)50LM¥¥0
A052Provide Downspouts with Stay Bracket (125mm dia)50LM¥¥0
A053Provide Downspouts with Stay Bracket (175mm dia)50LM¥¥0
A054Provide Sealing with Back-Up Foam3,000LM¥¥0
A055Provide Sealing without Back-Up Foam300LM¥¥0
A056Provide Asphalt Roofing Membrane for Metal Roof (24kg)50SM¥¥0

1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)

A057Repair Unsound BUR with Cut & Patch (where Non-ACM BUR)150SM¥¥0
A058Remove BUR where Non-ACM BUR100SM¥¥0
A059Disposal of Non-ACM BUR150SM¥¥0
A060Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR200LM¥¥0

1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)

A061Repair Unsound BUR with Cut and Patch (where ACM BUR)100SM¥¥0
A062Remove BUR where ACM BUR100SM¥¥0
A063Disposal (Over 0.1%) to off-base landsite150SM¥¥0
A064Remove/Reinstall Aluminum Edge Flashing System for ACM BUR200LM¥¥0

1.7 INSTALLATION TO BUILT-UP ROOF

A065Overlay BUR System to Existing BUR100SM¥¥0
A066Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR2,500SM¥¥0
A067Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR500SM¥¥0
A068Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer1,000SM¥¥0
A069Replace Aluminum Edge Flashing System to Non- ACM BUR200LM¥¥0
A070Replace Aluminum Edge Flashing System to ACM BUR200LM¥¥0

1.8 PAINTING WORK

A 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0

A072Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material)2,000SM¥¥0
Surfaces (Common by Local Mateial)
A073Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces
(Common by Local Material)2,000SM¥¥0
A074Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall .100SM¥¥0
Surfaces, CMU Wall Surfaces, etc.
A075Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces,
CMU Wall Surfaces, etc.100SM¥¥0
A076Apply Repair-Coat on Existing BUR200SM¥¥0
A077Additional Special Primer for Metal Surfaces4,000SM¥¥0
A078Penetrative Water Repellent Coating for Concrete Surfaces250SM¥¥0
A079Paint/Draw Building Letter and Number, including Wall Graphics20EA¥¥0
A080Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth100SM¥¥0

1.9 QUANTITATIVE SURVEY REQUIREMENTS

A081ACM/LBP Bulk Sampling50EA¥¥0
A082Quantity Survey and Report (Class 0~not exceed 200 square meters)1Unit¥¥0
A083Quantity Survey and Report (Class 200~ not exceed 500 square meters)1Unit¥¥0
A084Quantity Survey and Report (Class 500~ not exceed 1000 square meters)1Unit¥¥0
A085Quantity Survey and Report (Class 1000~ not exceed 1500 square meters)1Unit¥¥0
A086Quantity Survey and Report (Class 1500~ not exceed 2500 square meters)1Unit¥¥0
A087Quantity Survey and Report (Class 2500~ not exceed 4000 square meters)1Unit¥¥0
A088Quantity Survey and Report (Class 4000~ not exceed 6000 square meters)1Unit¥¥0
A089Quantity Survey and Report (Class 6000~ not exceed 10000 square meters)1Unit¥¥0
TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen)¥0
(This amount is the same as the estimated amount of CLIN 0001 and ELIN A01 of Exhibit A)

* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.

&8CUI//FEDCON (When filled in)

&10Exhibit A &10Page &P of &N

&10Exhibit A RFP No. FA5205-07-R-0002 &10Page &P of &N

&10Exhibit A &10Page &P of &N

&8CUI//FEDCON (When filled in) &9Page &P of &N

Exhibit-B

SCHEDULE OF INDEFINITE QUANTITY WORK "B"
Exhibit B, Price for Ordering Period 2
IDIQ EXTEIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS
NAF MISAWA, JAPAN
ePROJECT No. 1689228
EstimatedUnit ofEstimated
Item No.DescriptionQuantityIssueUnit PriceAmount
ELIN
B01Base Option one¥
Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings Rrepair / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe.
Sub ELINSub ELINs for ELIN B001 are listed hereunder.

1.1 SITE PREPARATION (Common)

B001Scaffolding (0-not exceed 7.5 meters high)3,000SM¥¥0
B002Scaffolding (7.5-not exceed 22.5 meters high)2,500SM¥¥0
B003Scaffolding (22.5-not exceed 38 meters high)500SM¥¥0
B004Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall1,000EA¥¥0
B005Additional Bracket Support for Scaffolding (W-500mm)200LM¥¥0
B006Additional Bracket Support for Scaffolding (W-900mm)1,500LM¥¥0
B00745-ton Crane w/Worker Bucket per Day15Day¥¥0
B008Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket
per Day15Day¥¥0
B009Water Wash/Wire-Brush Cleaning500SM¥¥0
B010Water Blast Cleaning (areas to be painted)7,000SM¥¥0
B011Sandblast Cleaning (areas to be painted)100SM¥¥0
B012Temporary Ground Protection Steel Sheets100SM¥¥0
B013Excavate and Sodding to Paint Foundation100SM¥¥0
B014Tree Branch Trimming & Disposal3TR¥¥0

1.2 SITE PREPARATION (INTERIOR/EXTERIOR)

B015Portable Stepladder for Wall (Ceiling Height=below 3 meters)100LM¥¥0
B016Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters)100SM¥¥0
B017Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day50Day¥¥0
B018Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day10Day¥¥0
B019Temporary Shield and Ventilation System5SET¥¥0

1.3 REPAIR/REMOVAL WORK

B 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0

B021Remove Floated Concrete Substrate (areas to be painted)150SM¥¥0
B022Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted)150SM¥¥0

B 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0

B 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

B025Remove Hardboard Siding20SM¥¥0
B026Remove ACM Hardboard Siding20SM¥¥0
B027Remove Wood Chip Cement Board (WCCB) Siding20SM¥¥0
B028Remove Metal Siding50SM¥¥0
B029Remove Metal Roofing50SM¥¥0
B030Remove Miscellaneous Metal Surfaces100SM¥¥0
B031Remove V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
B032Remove Gutter with Stay Brackets (Type 100)50LM¥¥0
B033Remove Gutter with Stay Brackets (Type 200)50LM¥¥0
B034Remove Downspouts with Stay Brackets (125mm dia)50LM¥¥0
B035Remove Downspouts with Stay Brackets (175mm dia)50LM¥¥0
B036Remove Vent Pipe with Union and Brackets (75mm dia)50LM¥¥0
B037Remove Sealing with Back-Up Foam3,000LM¥¥0
B038Lead-containing surface preparation with type 3200SM¥¥0
B039Lead-containing surface preparation with solvent cleaning200SM¥¥0

1.4 INSTALLATION

B 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

B041Install Hardboard Ceiling System (areas to be painted)20SM¥¥0
B042Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted)20SM¥¥0
B043Provide Metal Siding50SM¥¥0
B044Provide GSS Metal Roof System50SM¥¥0
B045Provide V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
B046Provide Miscellaneous Metal Surfaces100SM¥¥0
B047Provide Stainless Metal Surfaces20SM¥¥0
B048Replace Stainless Hood Meshes20SM¥¥0
B049Provide Metal Cover Roof System to Existing Roof200SM¥¥0
B050Provide Gutter with Stay Brackets (Type 100)50LM¥¥0
B051Provide Gutter with Stay Brackets (Type 200)50LM¥¥0
B052Provide Downspouts with Stay Bracket (125mm dia)50LM¥¥0
B053Provide Downspouts with Stay Bracket (175mm dia)50LM¥¥0
B054Provide Sealing with Back-Up Foam3,000LM¥¥0
B055Provide Sealing without Back-Up Foam300LM¥¥0
B056Provide Asphalt Roofing Membrane for Metal Roof (24kg)50SM¥¥0

1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)

B057Repair Unsound BUR with Cut & Patch (where Non-ACM BUR)150SM¥¥0
B058Remove BUR where Non-ACM BUR100SM¥¥0
B059Disposal of Non-ACM BUR150SM¥¥0
B060Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR200LM¥¥0

1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)

B061Repair Unsound BUR with Cut and Patch (where ACM BUR)100SM¥¥0
B062Remove BUR where ACM BUR100SM¥¥0
B063Disposal (Over 0.1%) to off-base landsite150SM¥¥0
B064Remove/Reinstall Aluminum Edge Flashing System for ACM BUR200LM¥¥0

1.7 INSTALLATION TO BUILT-UP ROOF

B065Overlay BUR System to Existing BUR100SM¥¥0
B066Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR2,500SM¥¥0
B067Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR500SM¥¥0
B068Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer1,000SM¥¥0
B069Replace Aluminum Edge Flashing System to Non- ACM BUR200LM¥¥0
B070Replace Aluminum Edge Flashing System to ACM BUR200LM¥¥0

1.8 PAINTING WORK

B 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0

B072Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material)2,000SM¥¥0
Surfaces (Common by Local Mateial)
B073Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces
(Common by Local Material)2,000SM¥¥0
B074Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall .100SM¥¥0
Surfaces, CMU Wall Surfaces, etc.
B075Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces,
CMU Wall Surfaces, etc.100SM¥¥0
B076Apply Repair-Coat on Existing BUR200SM¥¥0
B077Additional Special Primer for Metal Surfaces4,000SM¥¥0
B078Penetrative Water Repellent Coating for Concrete Surfaces250SM¥¥0
B079Paint/Draw Building Letter and Number, including Wall Graphics20EA¥¥0
B080Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth100SM¥¥0

1.9 QUANTITATIVE SURVEY REQUIREMENTS

B081ACM/LBP Bulk Sampling50EA¥¥0
B082Quantity Survey and Report (Class 0~not exceed 200 square meters)1Unit¥¥0
B083Quantity Survey and Report (Class 200~ not exceed 500 square meters)1Unit¥¥0
B084Quantity Survey and Report (Class 500~ not exceed 1000 square meters)1Unit¥¥0
B085Quantity Survey and Report (Class 1000~ not exceed 1500 square meters)1Unit¥¥0
B086Quantity Survey and Report (Class 1500~ not exceed 2500 square meters)1Unit¥¥0
B087Quantity Survey and Report (Class 2500~ not exceed 4000 square meters)1Unit¥¥0
B088Quantity Survey and Report (Class 4000~ not exceed 6000 square meters)1Unit¥¥0
B089Quantity Survey and Report (Class 6000~ not exceed 10000 square meters)1Unit¥¥0
TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen)¥0
(This amount is the same as the estimated amount of CLIN 0001 and ELIN B01 of Exhibit B)

* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.

&8CUI//FEDCON (When filled in)

&8CUI//FEDCON (When filled in) &9Page &P of & 3

Exhibit-C

SCHEDULE OF INDEFINITE QUANTITY WORK "C"
Exhibit C, Price for Ordering Period 3
IDIQ EXTEIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS
NAF MISAWA, JAPAN
ePROJECT No. 1689228
EstimatedUnit ofEstimated
Item No.DescriptionQuantityIssueUnit PriceAmount
ELIN
C01Base Option two¥
Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings Rrepair / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe.
Sub ELINSub ELINs for ELIN C001 are listed hereunder.

1.1 SITE PREPARATION (Common)

C001Scaffolding (0-not exceed 7.5 meters high)3,000SM¥¥0
C002Scaffolding (7.5-not exceed 22.5 meters high)2,500SM¥¥0
C003Scaffolding (22.5-not exceed 38 meters high)500SM¥¥0
C004Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall1,000EA¥¥0
C005Additional Bracket Support for Scaffolding (W-500mm)200LM¥¥0
C006Additional Bracket Support for Scaffolding (W-900mm)1,500LM¥¥0
C00745-ton Crane w/Worker Bucket per Day15Day¥¥0
C008Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket
per Day15Day¥¥0
C009Water Wash/Wire-Brush Cleaning500SM¥¥0
C010Water Blast Cleaning (areas to be painted)7,000SM¥¥0
C011Sandblast Cleaning (areas to be painted)100SM¥¥0
C012Temporary Ground Protection Steel Sheets100SM¥¥0
C013Excavate and Sodding to Paint Foundation100SM¥¥0
C014Tree Branch Trimming & Disposal3TR¥¥0

1.2 SITE PREPARATION (INTERIOR/EXTERIOR)

C015Portable Stepladder for Wall (Ceiling Height=below 3 meters)100LM¥¥0
C016Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters)100SM¥¥0
C017Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day50Day¥¥0
C018Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day10Day¥¥0
C019Temporary Shield and Ventilation System5SET¥¥0

1.3 REPAIR/REMOVAL WORK

C 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0

C021Remove Floated Concrete Substrate (areas to be painted)150SM¥¥0
C022Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted)150SM¥¥0

C 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0

C 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

C025Remove Hardboard Siding20SM¥¥0
C026Remove ACM Hardboard Siding20SM¥¥0
C027Remove Wood Chip Cement Board (WCCB) Siding20SM¥¥0
C028Remove Metal Siding50SM¥¥0
C029Remove Metal Roofing50SM¥¥0
C030Remove Miscellaneous Metal Surfaces100SM¥¥0
C031Remove V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
C032Remove Gutter with Stay Brackets (Type 100)50LM¥¥0
C033Remove Gutter with Stay Brackets (Type 200)50LM¥¥0
C034Remove Downspouts with Stay Brackets (125mm dia)50LM¥¥0
C035Remove Downspouts with Stay Brackets (175mm dia)50LM¥¥0
C036Remove Vent Pipe with Union and Brackets (75mm dia)50LM¥¥0
C037Remove Sealing with Back-Up Foam3,000LM¥¥0
C038Lead-containing surface preparation with type 3200SM¥¥0
C039Lead-containing surface preparation with solvent cleaning200SM¥¥0

1.4 INSTALLATION

C 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

C041Install Hardboard Ceiling System (areas to be painted)20SM¥¥0
C042Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted)20SM¥¥0
C043Provide Metal Siding50SM¥¥0
C044Provide GSS Metal Roof System50SM¥¥0
C045Provide V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
C046Provide Miscellaneous Metal Surfaces100SM¥¥0
C047Provide Stainless Metal Surfaces20SM¥¥0
C048Replace Stainless Hood Meshes20SM¥¥0
C049Provide Metal Cover Roof System to Existing Roof200SM¥¥0
C050Provide Gutter with Stay Brackets (Type 100)50LM¥¥0
C051Provide Gutter with Stay Brackets (Type 200)50LM¥¥0
C052Provide Downspouts with Stay Bracket (125mm dia)50LM¥¥0
C053Provide Downspouts with Stay Bracket (175mm dia)50LM¥¥0
C054Provide Sealing with Back-Up Foam3,000LM¥¥0
C055Provide Sealing without Back-Up Foam300LM¥¥0
C056Provide Asphalt Roofing Membrane for Metal Roof (24kg)50SM¥¥0

1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)

C057Repair Unsound BUR with Cut & Patch (where Non-ACM BUR)150SM¥¥0
C058Remove BUR where Non-ACM BUR100SM¥¥0
C059Disposal of Non-ACM BUR150SM¥¥0
C060Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR200LM¥¥0

1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)

C061Repair Unsound BUR with Cut and Patch (where ACM BUR)100SM¥¥0
C062Remove BUR where ACM BUR100SM¥¥0
C063Disposal (Over 0.1%) to off-base landsite150SM¥¥0
C064Remove/Reinstall Aluminum Edge Flashing System for ACM BUR200LM¥¥0

1.7 INSTALLATION TO BUILT-UP ROOF

C065Overlay BUR System to Existing BUR100SM¥¥0
C066Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR2,500SM¥¥0
C067Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR500SM¥¥0
C068Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer1,000SM¥¥0
C069Replace Aluminum Edge Flashing System to Non- ACM BUR200LM¥¥0
C070Replace Aluminum Edge Flashing System to ACM BUR200LM¥¥0

1.8 PAINTING WORK

C 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0

C072Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material)2,000SM¥¥0
Surfaces (Common by Local Mateial)
C073Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces
(Common by Local Material)2,000SM¥¥0
C074Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall .100SM¥¥0
Surfaces, CMU Wall Surfaces, etc.
C075Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces,
CMU Wall Surfaces, etc.100SM¥¥0
C076Apply Repair-Coat on Existing BUR200SM¥¥0
C077Additional Special Primer for Metal Surfaces4,000SM¥¥0
C078Penetrative Water Repellent Coating for Concrete Surfaces250SM¥¥0
C079Paint/Draw Building Letter and Number, including Wall Graphics20EA¥¥0
C080Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth100SM¥¥0

1.9 QUANTITATIVE SURVEY REQUIREMENTS

C081ACM/LBP Bulk Sampling50EA¥¥0
C082Quantity Survey and Report (Class 0~not exceed 200 square meters)1Unit¥¥0
C083Quantity Survey and Report (Class 200~ not exceed 500 square meters)1Unit¥¥0
C084Quantity Survey and Report (Class 500~ not exceed 1000 square meters)1Unit¥¥0
C085Quantity Survey and Report (Class 1000~ not exceed 1500 square meters)1Unit¥¥0
C086Quantity Survey and Report (Class 1500~ not exceed 2500 square meters)1Unit¥¥0
C087Quantity Survey and Report (Class 2500~ not exceed 4000 square meters)1Unit¥¥0
C088Quantity Survey and Report (Class 4000~ not exceed 6000 square meters)1Unit¥¥0
C089Quantity Survey and Report (Class 6000~ not exceed 10000 square meters)1Unit¥¥0
TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen)¥0
(This amount is the same as the estimated amount of CLIN 0001 and ELIN C01 of Exhibit C)

* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.

&8CUI//FEDCON (When filled in)

&8CUI//FEDCON (When filled in) &9Page &P of &N

Exhibit-D

SCHEDULE OF INDEFINITE QUANTITY WORK "D"
Exhibit D, Price for Ordering Period 4
IDIQ EXTEIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS
NAF MISAWA, JAPAN
ePROJECT No. 1689228
EstimatedUnit ofEstimated
Item No.DescriptionQuantityIssueUnit PriceAmount
ELIN
D01Base Optiom three¥
Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings Rrepair / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe.
Sub ELINSub ELINs for ELIN D001 are listed hereunder.

1.1 SITE PREPARATION (Common)

D001Scaffolding (0-not exceed 7.5 meters high)3,000SM¥¥0
D002Scaffolding (7.5-not exceed 22.5 meters high)2,500SM¥¥0
D003Scaffolding (22.5-not exceed 38 meters high)500SM¥¥0
D004Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall1,000EA¥¥0
D005Additional Bracket Support for Scaffolding (W-500mm)200LM¥¥0
D006Additional Bracket Support for Scaffolding (W-900mm)1,500LM¥¥0
D00745-ton Crane w/Worker Bucket per Day15Day¥¥0
D008Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket
per Day15Day¥¥0
D009Water Wash/Wire-Brush Cleaning500SM¥¥0
D010Water Blast Cleaning (areas to be painted)7,000SM¥¥0
D011Sandblast Cleaning (areas to be painted)100SM¥¥0
D012Temporary Ground Protection Steel Sheets100SM¥¥0
D013Excavate and Sodding to Paint Foundation100SM¥¥0
D014Tree Branch Trimming & Disposal3TR¥¥0

1.2 SITE PREPARATION (INTERIOR/EXTERIOR)

D015Portable Stepladder for Wall (Ceiling Height=below 3 meters)100LM¥¥0
D016Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters)100SM¥¥0
D017Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day50Day¥¥0
D018Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day10Day¥¥0
D019Temporary Shield and Ventilation System5SET¥¥0

1.3 REPAIR/REMOVAL WORK

D 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0

D021Remove Floated Concrete Substrate (areas to be painted)150SM¥¥0
D022Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted)150SM¥¥0

D 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0

D 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

D025Remove Hardboard Siding20SM¥¥0
D026Remove ACM Hardboard Siding20SM¥¥0
D027Remove Wood Chip Cement Board (WCCB) Siding20SM¥¥0
D028Remove Metal Siding50SM¥¥0
D029Remove Metal Roofing50SM¥¥0
D030Remove Miscellaneous Metal Surfaces100SM¥¥0
D031Remove V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
D032Remove Gutter with Stay Brackets (Type 100)50LM¥¥0
D033Remove Gutter with Stay Brackets (Type 200)50LM¥¥0
D034Remove Downspouts with Stay Brackets (125mm dia)50LM¥¥0
D035Remove Downspouts with Stay Brackets (175mm dia)50LM¥¥0
D036Remove Vent Pipe with Union and Brackets (75mm dia)50LM¥¥0
D037Remove Sealing with Back-Up Foam3,000LM¥¥0
D038Lead-containing surface preparation with type 3200SM¥¥0
D039Lead-containing surface preparation with solvent cleaning200SM¥¥0

1.4 INSTALLATION

D 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

D041Install Hardboard Ceiling System (areas to be painted)20SM¥¥0
D042Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted)20SM¥¥0
D043Provide Metal Siding50SM¥¥0
D044Provide GSS Metal Roof System50SM¥¥0
D045Provide V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
D046Provide Miscellaneous Metal Surfaces100SM¥¥0
D047Provide Stainless Metal Surfaces20SM¥¥0
D048Replace Stainless Hood Meshes20SM¥¥0
D049Provide Metal Cover Roof System to Existing Roof200SM¥¥0
D050Provide Gutter with Stay Brackets (Type 100)50LM¥¥0
D051Provide Gutter with Stay Brackets (Type 200)50LM¥¥0
D052Provide Downspouts with Stay Bracket (125mm dia)50LM¥¥0
D053Provide Downspouts with Stay Bracket (175mm dia)50LM¥¥0
D054Provide Sealing with Back-Up Foam3,000LM¥¥0
D055Provide Sealing without Back-Up Foam300LM¥¥0
D056Provide Asphalt Roofing Membrane for Metal Roof (24kg)50SM¥¥0

1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)

D057Repair Unsound BUR with Cut & Patch (where Non-ACM BUR)150SM¥¥0
D058Remove BUR where Non-ACM BUR100SM¥¥0
D059Disposal of Non-ACM BUR150SM¥¥0
D060Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR200LM¥¥0

1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)

D061Repair Unsound BUR with Cut and Patch (where ACM BUR)100SM¥¥0
D062Remove BUR where ACM BUR100SM¥¥0
D063Disposal (Over 0.1%) to off-base landsite150SM¥¥0
D064Remove/Reinstall Aluminum Edge Flashing System for ACM BUR200LM¥¥0

1.7 INSTALLATION TO BUILT-UP ROOF

D065Overlay BUR System to Existing BUR100SM¥¥0
D066Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR2,500SM¥¥0
D067Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR500SM¥¥0
D068Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer1,000SM¥¥0
D069Replace Aluminum Edge Flashing System to Non- ACM BUR200LM¥¥0
D070Replace Aluminum Edge Flashing System to ACM BUR200LM¥¥0

1.8 PAINTING WORK

D 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0

D072Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material)2,000SM¥¥0
Surfaces (Common by Local Mateial)
D073Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces
(Common by Local Material)2,000SM¥¥0
D074Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall .100SM¥¥0
Surfaces, CMU Wall Surfaces, etc.
D075Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces,
CMU Wall Surfaces, etc.100SM¥¥0
D076Apply Repair-Coat on Existing BUR200SM¥¥0
D077Additional Special Primer for Metal Surfaces4,000SM¥¥0
D078Penetrative Water Repellent Coating for Concrete Surfaces250SM¥¥0
D079Paint/Draw Building Letter and Number, including Wall Graphics20EA¥¥0
D080Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth100SM¥¥0

1.9 QUANTITATIVE SURVEY REQUIREMENTS

D081ACM/LBP Bulk Sampling50EA¥¥0
D082Quantity Survey and Report (Class 0~not exceed 200 square meters)1Unit¥¥0
D083Quantity Survey and Report (Class 200~ not exceed 500 square meters)1Unit¥¥0
D084Quantity Survey and Report (Class 500~ not exceed 1000 square meters)1Unit¥¥0
D085Quantity Survey and Report (Class 1000~ not exceed 1500 square meters)1Unit¥¥0
D086Quantity Survey and Report (Class 1500~ not exceed 2500 square meters)1Unit¥¥0
D087Quantity Survey and Report (Class 2500~ not exceed 4000 square meters)1Unit¥¥0
D088Quantity Survey and Report (Class 4000~ not exceed 6000 square meters)1Unit¥¥0
D089Quantity Survey and Report (Class 6000~ not exceed 10000 square meters)1Unit¥¥0
TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen)¥0
(This amount is the same as the estimated amount of CLIN 0001 and ELIN D01 of Exhibit D)

* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.

&8CUI//FEDCON (When filled in)

&8CUI//FEDCON (When filled in) &9Page &P of & 3

Exhibit-E

SCHEDULE OF INDEFINITE QUANTITY WORK "E"
Exhibit E, Price for Ordering Period 5
IDIQ EXTEIOR PAINTING & REPAIR FOR VARIOUS BUILDINGS
NAF MISAWA, JAPAN
ePROJECT No. 1689228
EstimatedUnit ofEstimated
Item No.DescriptionQuantityIssueUnit PriceAmount
ELIN
E01Base Option four¥
Provide all work as specified on the plans & specifications for IDIQ Exterior Painting & Repair for Various Buildings Rrepair / Contract, PWD Misawa. The premium percentage of 20% (Muunitions area and Building 978) or 13% (FLCY Hachinohe) applies to Sub ELIN(s) or total amount of individual task order when such work is required in the restricted area of Munitions (1400 area ), Building 978 and FLCY Hachinohe.
Sub ELINSub ELINs for ELIN E001 are listed hereunder.

1.1 SITE PREPARATION (Common)

E001Scaffolding (0-not exceed 7.5 meters high)3,000SM¥¥0
E002Scaffolding (7.5-not exceed 22.5 meters high)2,500SM¥¥0
E003Scaffolding (22.5-not exceed 38 meters high)500SM¥¥0
E004Anchor Drilling for Scaffolding to ACM/LBP Concrete Wall1,000EA¥¥0
E005Additional Bracket Support for Scaffolding (W-500mm)200LM¥¥0
E006Additional Bracket Support for Scaffolding (W-900mm)1,500LM¥¥0
E00745-ton Crane w/Worker Bucket per Day15Day¥¥0
E008Provide one Crawler-type 18 meters Cherry Picker w/Worker Bucket
per Day15Day¥¥0
E009Water Wash/Wire-Brush Cleaning500SM¥¥0
E010Water Blast Cleaning (areas to be painted)7,000SM¥¥0
E011Sandblast Cleaning (areas to be painted)100SM¥¥0
E012Temporary Ground Protection Steel Sheets100SM¥¥0
E013Excavate and Sodding to Paint Foundation100SM¥¥0
E014Tree Branch Trimming & Disposal3TR¥¥0

1.2 SITE PREPARATION (INTERIOR/EXTERIOR)

E015Portable Stepladder for Wall (Ceiling Height=below 3 meters)100LM¥¥0
E016Interior Scaffolding for Interior Wall/Ceiling (Ceiling Height=over 3 meters)100SM¥¥0
E017Interior Movable Scaffolding (Rolling Tower) for Interior Wall/Ceiling (H=5 meters approx) per Day50Day¥¥0
E018Interior/Exterior Elevated Lift Vehicle over 5 meters high per Day10Day¥¥0
E019Temporary Shield and Ventilation System5SET¥¥0

1.3 REPAIR/REMOVAL WORK

E 020 Normal Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. (areas to be painted) 350 SM ¥ ¥ 0

E021Remove Floated Concrete Substrate (areas to be painted)150SM¥¥0
E022Provide Resin Mortar (3~15mm thick) to Repair Concrete Surfaces (areas to be painted)150SM¥¥0

E 023 Epoxy Injection Crack Repair of Concrete Walls, Stucco Wall Surfaces, CMU Wall Surfaces, etc. 1,000 LM ¥ ¥ 0

E 024 Remove Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

E025Remove Hardboard Siding20SM¥¥0
E026Remove ACM Hardboard Siding20SM¥¥0
E027Remove Wood Chip Cement Board (WCCB) Siding20SM¥¥0
E028Remove Metal Siding50SM¥¥0
E029Remove Metal Roofing50SM¥¥0
E030Remove Miscellaneous Metal Surfaces100SM¥¥0
E031Remove V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
E032Remove Gutter with Stay Brackets (Type 100)50LM¥¥0
E033Remove Gutter with Stay Brackets (Type 200)50LM¥¥0
E034Remove Downspouts with Stay Brackets (125mm dia)50LM¥¥0
E035Remove Downspouts with Stay Brackets (175mm dia)50LM¥¥0
E036Remove Vent Pipe with Union and Brackets (75mm dia)50LM¥¥0
E037Remove Sealing with Back-Up Foam3,000LM¥¥0
E038Lead-containing surface preparation with type 3200SM¥¥0
E039Lead-containing surface preparation with solvent cleaning200SM¥¥0

1.4 INSTALLATION

E 040 Install Wood Surfaces, Wood Members, such as Window Jambs/Sills, etc. (Model 50x120mm) 50 LM ¥ ¥ 0

E041Install Hardboard Ceiling System (areas to be painted)20SM¥¥0
E042Install Hardboard/Wood Chip Cement Board (WCCB) Siding (areas to be painted)20SM¥¥0
E043Provide Metal Siding50SM¥¥0
E044Provide GSS Metal Roof System50SM¥¥0
E045Provide V-folding Roofing (t=0.8mm class, H<=175mm)50SM¥¥0
E046Provide Miscellaneous Metal Surfaces100SM¥¥0
E047Provide Stainless Metal Surfaces20SM¥¥0
E048Replace Stainless Hood Meshes20SM¥¥0
E049Provide Metal Cover Roof System to Existing Roof200SM¥¥0
E050Provide Gutter with Stay Brackets (Type 100)50LM¥¥0
E051Provide Gutter with Stay Brackets (Type 200)50LM¥¥0
E052Provide Downspouts with Stay Bracket (125mm dia)50LM¥¥0
E053Provide Downspouts with Stay Bracket (175mm dia)50LM¥¥0
E054Provide Sealing with Back-Up Foam3,000LM¥¥0
E055Provide Sealing without Back-Up Foam300LM¥¥0
E056Provide Asphalt Roofing Membrane for Metal Roof (24kg)50SM¥¥0

1.5 REPAIR/REMOVAL OF Non-ACM BUILT-UP ROOF (BUR)

E057Repair Unsound BUR with Cut & Patch (where Non-ACM BUR)150SM¥¥0
E058Remove BUR where Non-ACM BUR100SM¥¥0
E059Disposal of Non-ACM BUR150SM¥¥0
E060Remove/Reinstall Aluminum Edge Falshing System for Non-ACM BUR200LM¥¥0

1.6 REPAIR / REMOVAL OF ACM BUILT-UP ROOF (BUR)

E061Repair Unsound BUR with Cut and Patch (where ACM BUR)100SM¥¥0
E062Remove BUR where ACM BUR100SM¥¥0
E063Disposal (Over 0.1%) to off-base landsite150SM¥¥0
E064Remove/Reinstall Aluminum Edge Flashing System for ACM BUR200LM¥¥0

1.7 INSTALLATION TO BUILT-UP ROOF

E065Overlay BUR System to Existing BUR100SM¥¥0
E066Apply Roofing Sheets of Synthetic Polymer with Top Coat to Existing BUR2,500SM¥¥0
E067Apply Polyner-modified Cement Liquid Applied Membrane Waterproofing Coating Film Waterproofing Materials on Existng Concrete Surface and BUR500SM¥¥0
E068Apply Top Coat to Existing Roofing Sheets of Synthetic Polymer1,000SM¥¥0
E069Replace Aluminum Edge Flashing System to Non- ACM BUR200LM¥¥0
E070Replace Aluminum Edge Flashing System to ACM BUR200LM¥¥0

1.8 PAINTING WORK

E 071 Apply Exterior Paint (SOP, NAD, EP, VE) on Existing Exposed Metal/Wood/Conc Surfaces (Common by Local Material) 500 SM ¥ ¥ 0

E072Apply High-Quality Paint (Radical Control Type) on Existing Metal/Wood/Conc Surface (Common by Local Material)2,000SM¥¥0
Surfaces (Common by Local Mateial)
E073Apply High-Quality Paint (Silicon) on Existing Metal/Wood/Conc Surfaces
(Common by Local Material)2,000SM¥¥0
E074Spray Sand-Texture Coat on Concrete Walls, Stucco Wall Surfaces, CMU Wall .100SM¥¥0
Surfaces, CMU Wall Surfaces, etc.
E075Spray Latex Patterned Coat on Concrete Walls, Stucco Wall Surfaces,
CMU Wall Surfaces, etc.100SM¥¥0
E076Apply Repair-Coat on Existing BUR200SM¥¥0
E077Additional Special Primer for Metal Surfaces4,000SM¥¥0
E078Penetrative Water Repellent Coating for Concrete Surfaces250SM¥¥0
E079Paint/Draw Building Letter and Number, including Wall Graphics20EA¥¥0
E080Remove Sand-Textured Coating on Concrete Surfaces to make surface smooth100SM¥¥0

1.9 QUANTITATIVE SURVEY REQUIREMENTS

E081ACM/LBP Bulk Sampling50EA¥¥0
E082Quantity Survey and Report (Class 0~not exceed 200 square meters)1Unit¥¥0
E083Quantity Survey and Report (Class 200~ not exceed 500 square meters)1Unit¥¥0
E084Quantity Survey and Report (Class 500~ not exceed 1000 square meters)1Unit¥¥0
E085Quantity Survey and Report (Class 1000~ not exceed 1500 square meters)1Unit¥¥0
E086Quantity Survey and Report (Class 1500~ not exceed 2500 square meters)1Unit¥¥0
E087Quantity Survey and Report (Class 2500~ not exceed 4000 square meters)1Unit¥¥0
E088Quantity Survey and Report (Class 4000~ not exceed 6000 square meters)1Unit¥¥0
E089Quantity Survey and Report (Class 6000~ not exceed 10000 square meters)1Unit¥¥0
TOTAL ESTIMATED AMOUNT OF Sub ELINs (Yen)¥0
(This amount is the same as the estimated amount of CLIN 0001 and ELIN E01 of Exhibit E)

* NOTE: The quantity of each Sub ELIN is estimate purpose only, and U.S. Government is not bound by those quantities listed above.

&8CUI//FEDCON (When filled in)

&8CUI//FEDCON (When filled in) &9Page &P of & 3

File details come from the government source that posted it. Updated .