Attach1-ProjectSite Detail Sketch-PartialDraw-Photos-W912C321Q005A20210805.pdf

PDF 8 MB Posted

Attached to
Install Fiber Optic Cable Systems for B399 and B566, Fort Buchanan
Solicitation number
W912C321Q005A
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wind Turbine

Cabinet

HH-4D

Building 399

Building 566

MH-25

New underground fiber optic line layout from existing cabinet next to wind turbine to existing IT Hand Hole HH-4D

New 2FT x 2FT X3 FT pull box

Building 34

(DPW)

Power Substation

Water Park Complex

HH-4C

HH-4B

HH-4A

MH-4

MH-3

WORK SITES OVERVIEW

Wind Turbine

New underground fiber optic line layout from existing cabinet next to wind turbine to existing IT Hand Hole HH-4D

Building 399

Building 34

(DPW)

Power Substation

Water Park Complex

Cabinet

HH-4D

New 2FT x 2FT x 3FT pull box

POTABLE WATER

PVC DR-18 PIPE

HH-4C

HH-4B

HH-4AMH-4

MH-3

WORK SITE WT CABINET TO BLDG. 399

Existing Potable Water Lines Layout

Existing Wastewater Lines Layout Existing Overhead Electric Lines LayoutExisting Stormwater Lines Layout

Existing Street Lighting Distribution

PHOTOS WORK SITE DEMARKING INTENDED TRENCH LINE GENERAL ROUTE - FROM WT CABINET TO BLDG. 399 (1 of 2)

PHOTOS WORK SITE DEMARKING INTENDED TRENCH LINE GENERAL ROUTE - FROM WT CABINET TO BLDG. 399 (2 of 2) carla.rosariorivera Sticky Note Who is going to move the concrete barriers Gov or Contractor? I did not see comments related to action.

carla.rosariorivera Sticky Note See comment above

File details come from the government source that posted it. Updated .