Attach J3-GRFOfficeReno_CnxnPlans.pdf
PDF 2 MB Posted
- Solicitation number
- 12445225B0007
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a set of construction drawings for the renovation of the Grandfather Ranger District Office in the Pisgah National Forest. The 18-sheet drawing set details renovation work including wall demolition and new construction, electrical modifications, HVAC adjustments, and security upgrades.
The drawings specify installation of new walls, doors, and ceilings in multiple office areas, with detailed requirements for sound-proof wall construction using 5/8" gypsum board and R-13 insulation. Electrical work includes new lighting fixtures, receptacles, and IT infrastructure with conduit and pull strings. HVAC modifications involve relocating ductwork and installing new return air grills. Security improvements include installation of ballistic glazing meeting U.L. Level 3 standards at the reception counter, along with modifications to the counter configuration. The project involves phased construction, with the new conference room/reception area (rooms #11a, #11b, #11c, #12a, and #12b) to be completed first, followed by renovation of rooms #3, #4a, #4b, #16a and #16b. The drawings are signed and approved by Forest Service officials with approval dates in July/August 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PISGAH NATIONAL FOREST
NANTAHALA NATIONAL FOREST
SYMBOL DESCRIPTION
INTERSTATE HIGHWAY
U.S. HIGHWAY
STATE HIGHWAY
DRAWING INDEX
SHEET TITLE
1 Cover, Signature Sheet, & Index to Sheets
2 Notes
3 New Floor Plan
4 Demolition
5 Wall Location
6 Wall & Ceiling Details 1
7 Wall & Ceiling Details 2
8 Wall & Ceiling Details 3
9 Existing Lighting and Affected Recepticals
10 New Lighting
11 New Lighting Schedule
12 New Receptacals
13 Main Electrical Panel
14 Door Layout
15 Door Schedule
16 Door Details
17 HVAC
18 Reception Counter Alterations and Security Glazing
United States Department of Agriculture Forest Service
Region 8 - Southern Region
NORTH CAROLINA STATE
MCDOWELL COUNTY
PISGAH NATIONAL FOREST
GRANDFATHER RANGER DISTRICT
APPROVED BY:
RECOMMENDED BY:
REVIEWED BY
RECOMMENDED BY:
CALEB DAVIS Digitally signed by CALEB DAVIS Date: 2024.07.31 12:56:26 -04'00'
NICHOLAS LARSON
Digitally signed by NICHOLAS
LARSON
Date: 2024.07.31 15:14:50 -04'00'
JAMES JONES Digitally signed by JAMES JONES Date: 2024.08.05 08:28:51 -04'00'
JAMES MELONAS
Digitally signed by JAMES
MELONAS
Date: 2024.08.05 06:51:08 -07'00'
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
MURPHY
AutoCAD SHX Text
WAYNESVILLE
AutoCAD SHX Text
CHEROKEE
AutoCAD SHX Text
ANDREWS
AutoCAD SHX Text
MT AIRY
AutoCAD SHX Text
HENDERSONVILLE
AutoCAD SHX Text
SYLVA
AutoCAD SHX Text
FRANKLIN
AutoCAD SHX Text
STATESVILLE
AutoCAD SHX Text
HICKORY
AutoCAD SHX Text
MORGANTON
AutoCAD SHX Text
ROBBINSVILLE
AutoCAD SHX Text
BRYSON CITY
AutoCAD SHX Text
HIGHLANDS
AutoCAD SHX Text
CASHIERS
AutoCAD SHX Text
AutoCAD SHX Text
WESTERN NORTH CAROLINA
AutoCAD SHX Text
APPROX. SCALE IN MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BOONE
AutoCAD SHX Text
BLOWING ROCK
AutoCAD SHX Text
GASTONIA
AutoCAD SHX Text
WILKESBORO
AutoCAD SHX Text
MARS HILL
AutoCAD SHX Text
HOT SPRINGS
AutoCAD SHX Text
WINSTON-SALEM
AutoCAD SHX Text
RUTHERFORDTON
AutoCAD SHX Text
MARION
AutoCAD SHX Text
BURNSVILLE
AutoCAD SHX Text
SPRUCE PINE
AutoCAD SHX Text
BREVARD
AutoCAD SHX Text
ASHVILLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CHARLOTTE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
- VICINITY MAP -
AutoCAD SHX Text
MORGANTON
AutoCAD SHX Text
MARION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Grandfather RD Office
AutoCAD SHX Text Exit 90
AutoCAD SHX Text Harmony Grove RD
Exit sign
Ground fault circuit interrupter
4-way switch Dimmer switch
3-way switch 1-way switch
120 volt single receptacle, 20 Amp Rated
Legend
120 volt quadplex receptacle, 20 Amp Rated
Light Label Identification
Electrical panel
Disconnect switch
120 volt duplex receptacle, 20 Amp Rated
Circuit location in service panel
Room number designation
IT data jack, (in conduit) 12" AFF unless noted.
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Notes
2 18
General Notes
Painting and Texturing: Paint color shall match the existing room color and wall texture. Conference room shall match the color and wall texture of the office hallway.
Electrical & panel: Contractor to remove existing and provide new circuit legend for panel following electrical work.
All circuits worked on shall be verified for location.
All interior light circuits shall be verified for location.
Room #16 (a&b) shall have the outlets labeled for circuit location.
Rooms #3 & #4 (a & b) shall have outlets labeled for circuit locations.
Flooring: Remove and salvage flooring in the new conference room (11a). Remove and dispose of flooring in rooms #3 and #12b. In room #11a & #12b & #3 replace with Next Floor 811 010 color Gunmetal carpet squares or approved equal. Utilize salvaged flooring to repair the room #11c (foyer area). Repair so that it is not noticeable.
Signage: Contractor shall post 9" x 12" sign within conference room stating Occupant loading not to exceed 70 occupants.
Install above west door to room #11a.
Dust control: Contractor shall mitigate dust from construction activities to greatest extent practicable. Mitigation shall consist of, at a minimum, installing plastic tarp walls and utilizing vacuums and positive ventilation.
Timing, Coordination, Office Furniture move:
Phased construction is required. Room #11a, #11b, #11c, #12a, and #12b (new conference room/reception) shall be completed first. Forest Service staff in rooms #3 and #4 will then temporarily move to completed conference room. Contractor shall then complete rooms #3 & #4a, #4b, #16a & #16b.
Forest Service will move all "loose" materials not secured to walls or floor (desk, chairs, etc.) into storage. The contractor shall be responsible for moving all items secured to walls and floors to a designated onsite storage area. Contractor is responsible for removing all items in old Interpretive area: #11a, #11b, & #11c. Government will be responsible for returning all items to rooms.
Light replacement and door and door hardware replacement shall be coordinated with Government and can occur throughout the contract.
IT: "IT" consists of infrastructure for future IT Jacks and Low Voltage Cabling. At locations specified, provide single gang box with blank plates, conduit, and pull string as directed in the drawings. Install at 12" AFF unless otherwise specified.
Window Shades: Shades shall be SelectBlinds cordless light filter cellular shades or approved equal.
Contractor to supply color sample for COR approval.
Conference Room Window:
See note on Sheet 5 - Wall Locations.
Sound Absortion material in New Conference room (#11a):
Install 420 SF of Echo Eliminator by Acoustical Surfaces, INC or approved equal. Mount per manufacture's instructions. Install 180 SF on walls, evenly distributed, and 240 SF on ceiling, evenly distributed. Contractor to get approval by COR on installation pattern and locations prior to installation.
Conference room TV: LG 86" UR640S Series UHD with Perlegear full motion TV wall mount or approved equals. Located near ceiling and location approved by COR.
Section number Reference Page number
3-way dimmer switch.
Leviton TSL06-1LW or approved equal
Denotes Existing Light, Receptacle or IT Jack
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
GFCI
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text 13B
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 6-12-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
AutoCAD SHX Text
C DAVIS
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text A
E
8'-8"
13'-7"
'-5
23'-6"
11'
13'-10"
Reception
New Conference Room
'-7
16'-6" 11'
8'-11"
6'
'-4
'-6
12'
'-1
0"
13' 17'-6"
'-4
12'-6"
11'11'
~10'-4"
Storage Foyer
Interpretive Area
8'-2"
(Occupant loading not to exceed 70)
8'-6"5'
1'-6"
16b
4b 5 6 7 8 9Mech
14 13 Touch Down
Stations
12a 12b
16a
11a
11c 11b
Existing Wall to Remain
New Construction
Legend
Cathedral Ceiling Peak
Edge of drop ceiling
5'-5"
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
New Floor Plan
3 18
AutoCAD SHX Text Law
AutoCAD SHX Text Timber Markers
AutoCAD SHX Text Fire Staff
AutoCAD SHX Text Special Uses
AutoCAD SHX Text Silvicuturalist
AutoCAD SHX Text Forester
AutoCAD SHX Text IT Room
AutoCAD SHX Text Records/Copy Room
AutoCAD SHX Text Kitchen
AutoCAD SHX Text District Ranger
AutoCAD SHX Text Biologist
AutoCAD SHX Text Recreation
AutoCAD SHX Text Recreation
AutoCAD SHX Text Supervisor
AutoCAD SHX Text Business
AutoCAD SHX Text Operations
AutoCAD SHX Text Fire Manager
AutoCAD SHX Text Officer
AutoCAD SHX Text Timber Manager
AutoCAD SHX Text Timber Sale Adm
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Storage
AutoCAD SHX Text Mechanical
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Maps & Deeds
AutoCAD SHX Text Bathrooms
AutoCAD SHX Text Chase (1)
AutoCAD SHX Text Bathrooms
AutoCAD SHX Text Touch Down
AutoCAD SHX Text LEO Storage
AutoCAD SHX Text Enforcement
AutoCAD SHX Text Officer
AutoCAD SHX Text Bathrooms
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 6-12-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
C DAVIS
Demolish wall, remove electrical conductors back to first junction box. Move IT data jacks to new locations per Sheet 12.
Demolish wall and door, remove electrical conductors back to first junction box.
Demolition - Rooms #3, #4, #16
Demolish drop ceiling. See Sheet 5 for replacement.
#16 Remove existing carpet and vinyl plank flooring within extents of new Room #12b (Reception). Replace per notes.
Remove existing flooring within expanded Room #3 extents and replace per notes.
Demolition - Rooms #12 & #11
Demolish door and frame.
Salvage counter and base, to be modified and relocated per Sheet 18.
Demolish window and wall.
Demolish half wall and gate.
Remove and salvage flooring within extents of new Room 11a, to be used for repair in
#11c per notes.
12b
11c
11a
11b
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Demolition Plan
4 18
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 6-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
8'-8"
13'-7"
'-4
23'-6" +/- (Match new wall to existing wall location.)
13'-10"
6'
12'
5' Finished Wall surface 3" from window frame edge
Modify salvaged counter per Sheet 18 and relocate as shown.
Repair flooring in Room #11c per notes.
Construct Ceiling per detail this sheet LEO #16a & #16b Ceiling Detail
Adjust supply and cold air return in Room #16a to fit between joists, locations approximate
2x6 structural grade rafters, 24" OC, TYP.
2x6 header with metal J-bead drywall attachment edging
Anchor bolt locations.
Distance between bolts not to exceed 6'. Anchor bolts to be between 4" and 12" from end of plates. Note: Concrete assumed to be 6" thick, bolt depth requirements reduced to 4.5" into concrete from code required 7".
Repair drop ceiling. Match existing size, material, style and color.
New interior wall construction/reconstruction this contract
Height of new wall shall match existing wall heights
See Room #12b & Hallway ceiling detail Sheet 17
Picture window 32"W x 60"H.
Bottom sill 12" AFF.
"Encompass" vinyl window by Pella with 3M Scothshield Ultra Safety Window film and vinyl blinds, or approved equals.
Legend
New Wall & Ceiling Construction Rooms #3, #4b, #16a & #16b
4b
16b
16a
New Wall & Ceiling Construction Rooms #11 & #12
11a 12b
12a
11b11c
5'-5"
9"
At new wall connections to existing drywall, connect top and bottom plate to existing wall framing and anchor end stud to drywall with toggle style anchors at 24" max spacing.
'-7
* Construct wall to bottom of new ceiling and attach top plate to rafters, see Sheet 17.
8'-11"
CLR SPAN
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
New Wall Location Plan
5 18
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 6-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
Sound Proof Wall Detail
8" GYP. BD (Both Sides)
2 x 4 STUDS @ 16" O.C.
BASE MOLDING, match existing
2 x 4 TREATED
VINYL FLOORING, Remove flooring from under base plate and conference room. See NOTES for flooring work.
CONC. FLOOR
Topcon Anchor Bolts 12"Ø x 6" or approved equal, spacing as shown on drawings
R-13 BATT INSUL
NU-WOOL blown insulation or approved equal. Make dense as practicable and to manufacturer directions
Room Wall Detail
CONC. FLOOR
8" GYP. BD (Both Sides)
2 x 4 STUDS @ 16" O.C.
Existing Joist
2x4 header. Top beveled to match joist
Existing GYP board
Existing Gyp. Bd Existing rafter, locations not determined.
8" GYP. BD
New 2 x 6 structural grade Rafter and Headers (See Sheet 5 for Spacing and Span)
Existing Drop Ceiling
Wall Parallel to Truss Detail
Wall Perpendicular to Truss Detail
Ceiling Detail (Room #16a Only)
Interior Wall Detail
8" GYP. BD (Both Sides)
2 x 4 STUDS @ 16" O.C.
BASE MOLDING, match existing
2 x 4 TREATED
Topcon Anchor Bolts 12"Ø x 6" or approved equal, spacing as shown on drawings
Repair Gyp. Bd
Existing Gyp. Bd Not applicable Room #3.
Existing rafter, locations not determined.
Repair Gyp. Bd Not applicable Room #3.
Provide 2x6 blocking where stud wall does not align with rafter. (2) per wall.
Toe nail blocking to rafters and header with (2) 3.5" 16d nails on each side.
Provide 2x6 blocking where stud wall does not align with rafter. (2) per wall.
Toe nail blocking to rafters and header with (2) 3.5" 16d nails on each side.
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Wall & Ceiling Details 1
6 18
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 6-12-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
Room #16b Wall Detail Room #16b Reconstruct Wall Detail
3/4" Plywood sheathing
5/8" GYP. BD
2 x 4 Studs @ 16" O.C.
Base Molding, match existing
2 x 4 Treated
Conc. Floor
8" GYP. BD
Topcon Anchor Bolts 12"Ø x 6" or approved equal, spacing as shown on drawings
3/4" Plywood sheathing
5/8" GYP. BD
Existing 2 x 4 Studs @ 16" O.C.
Base Molding, match existing
Existing Carpet Flooring
Conc. Floor
Existing GYP. BD
Room #16b Combined Ceiling Detail
Carpet Flooring, Remove flooring from under base plate.
4" Plywood sheathing
8" GYP. BD
2 x 6 Rafter & Header, See Detail Sheet 5
2 x 4 Studs @ 16: O.C.
LEO STORAGEHALLWAY
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Wall & Ceiling Details 2
7 18
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 6-12-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
8" GYP. BD
New 2 x 6 structural grade Header and Rafters
Existing Drop Ceiling
8" GYP. BD
2 x 4 Studs @ 16" O.C.
Base Molding, match existing
2 x 4 Treated
Carpet Flooring, Remove flooring from under base plate.
CONC. FLOOR
8" GYP. BD
Topcon Anchor Bolts 12"Ø x 6" or approved equal, spacing as shown on drawings
R-13 Batt Insul.
Note: See Sheet 17 for additional Room #12b ceiling details
Contractor to submit proposal for tie-in to existing wall, COR approval required.
Sound Proof Wall Detail
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Wall & Ceiling Details 3
8 18
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 04-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
C DAVIC
4b
5 6 7 8
1 15 14 13 12
16 17 18
11c
Mech
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Existing Lighting & Effected
Recepticals
9 18
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 06-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
Disconnect & Main Panel
Rotate
2'
3' Typ. Light bank Centered on wall
4b
5 6 7 8
1 15 14 13 12b
16 17
11c
11a
Mech
12a
11b
16a
Rotate
HVAC
Return (Typ.)
Replace
Replace New, Connect to Existing
Replace
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
New Lighting
10 18
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'
AutoCAD SHX Text 3'
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text 5B
AutoCAD SHX Text 5B
AutoCAD SHX Text 9B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5A
AutoCAD SHX Text 5A
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text 5B
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 06-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Light Schedule
11 18
AutoCAD SHX Text Type of Lamp
AutoCAD SHX Text K4000
AutoCAD SHX Text
LED
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text Label
AutoCAD SHX Text Mount
AutoCAD SHX Text
AutoCAD SHX Text
2FSL4 40L EZ1 LP840
AutoCAD SHX Text Light Fixture Schedule
AutoCAD SHX Text
FML4W 48 AL06 SEF 840
AutoCAD SHX Text Catalog #
AutoCAD SHX Text Type
AutoCAD SHX Text Lighting
AutoCAD SHX Text Lithonia
AutoCAD SHX Text Flush
AutoCAD SHX Text Mount
AutoCAD SHX Text Grid
AutoCAD SHX Text Manufacturer
AutoCAD SHX Text # of Lamps
AutoCAD SHX Text Voltage
AutoCAD SHX Text 120 volts
AutoCAD SHX Text 24" x 48"
AutoCAD SHX Text Size
AutoCAD SHX Text
MVOLT
AutoCAD SHX Text
LED
AutoCAD SHX Text 10" x 48"
AutoCAD SHX Text
LXNY W 3 R EL
AutoCAD SHX Text
ELM4L
AutoCAD SHX Text Top
AutoCAD SHX Text Wall
AutoCAD SHX Text Mount
AutoCAD SHX Text Mount
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text Exit sign
AutoCAD SHX Text Emergency head
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LED
AutoCAD SHX Text
EML2LF
AutoCAD SHX Text Wall
AutoCAD SHX Text Mount
AutoCAD SHX Text J
AutoCAD SHX Text Emergency head
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text K4000
AutoCAD SHX Text
LED
AutoCAD SHX Text C
AutoCAD SHX Text Mount
AutoCAD SHX Text
WF6 30K
AutoCAD SHX Text Ceiling
AutoCAD SHX Text 6"
AutoCAD SHX Text
LED
AutoCAD SHX Text K3000
AutoCAD SHX Text
LED
AutoCAD SHX Text
AutoCAD SHX Text Qty
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 06-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
Tie into existing
Tie into existing
Tie into existing
Replace existing receptacle with quad
1. Recepticals match existing height from floor.
2. IT locations shall consist of a single gang box with blank cover and conduit terminating above drop ceiling. Provide pull strings for all new locations.
3. IT conductors (Low Voltage cables) are NOT INCLUDED in the contract.
Only the conduit and boxes are included this contract.
4. Each IT box location shall have it's own conduit. Boxes and conduit shall not be combined.
Conference Room IT Cabling Path:
OPTION #1: Run IT conduit within Room #11a perimeter wall to this location. Terminate conduit above drop ceiling in Restroom.
OPTION #2: Run IT conduit through header of new Room #11a perimeter wall, into cathedral ceiling attic space and over to nearest drop ceiling location. All turns shall be 90° long sweeps.
Room #11a
Drop Ceiling
Terminate conduit above Room #10 drop ceiling. (3) Typ.
48" A.F.F.
Room #11a IT Conduit Detail
Drop Ceiling Rm #10
Electrical Receptacle and IT Construction Notes:
4b
16a
12b
11c
11a
12a
11b
Room #3 & #4b IT Conduit Detail
2x6 blocking behind.
OPTION #2. Continue conduit to drop ceiling.
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
New Receptacles
& IT
12 18
AutoCAD SHX Text 13B
AutoCAD SHX Text 18B
AutoCAD SHX Text 22A
AutoCAD SHX Text
AutoCAD SHX Text 16A
AutoCAD SHX Text 22A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 06-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
This is the best estimate of circuit panel locations. Contractor to verify circuits that are worked on.
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Main Electrical Panel
13 18
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 06-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
4b 5 6 7 8
1 15 14 13 12b
11c
12a
11b
16a
Mech
11a
No work on exterior door.
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Door Layout
14 18
AutoCAD SHX Text D1
AutoCAD SHX Text D1
AutoCAD SHX Text D1
AutoCAD SHX Text D1
AutoCAD SHX Text D1
AutoCAD SHX Text D1
AutoCAD SHX Text D4
AutoCAD SHX Text D1
AutoCAD SHX Text D4
AutoCAD SHX Text D1
AutoCAD SHX Text D1
AutoCAD SHX Text D1
AutoCAD SHX Text D2
AutoCAD SHX Text D1
AutoCAD SHX Text D4
AutoCAD SHX Text D3
AutoCAD SHX Text D3
AutoCAD SHX Text D9
AutoCAD SHX Text D5
AutoCAD SHX Text D7
AutoCAD SHX Text D4
AutoCAD SHX Text D8
AutoCAD SHX Text D11
AutoCAD SHX Text D1
AutoCAD SHX Text D1
AutoCAD SHX Text D6
AutoCAD SHX Text D1
AutoCAD SHX Text D12
AutoCAD SHX Text D4
AutoCAD SHX Text D4
AutoCAD SHX Text D4
AutoCAD SHX Text Sw
AutoCAD SHX Text D12
AutoCAD SHX Text D12
AutoCAD SHX Text D12
AutoCAD SHX Text D12
AutoCAD SHX Text Requires Metal Frame
AutoCAD SHX Text Bathrooms
AutoCAD SHX Text Bathrooms
AutoCAD SHX Text Chase
AutoCAD SHX Text Bathrooms
AutoCAD SHX Text Chase (1)
AutoCAD SHX Text Bathrooms
AutoCAD SHX Text Sw
AutoCAD SHX Text Electric Switch Location
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 06-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
Door Schedule
Room Label Frame Door width Door Thickness Swing Door Type Door latch Handle Lever Color Closure Deadbolt Notes
#1 D4 Existing (Wood) 36" 1-3/8" Left New PB - Pacific Beach 626 Satin Chrome
#2 D1 36" 1-3/8" Right Replace Yale 5401LN (F75)
#3 D1 36" 1-3/8" Left Yale 5401LN (F75)
#4b D1 36" 1-3/8" Right Yale 5401LN (F75)
#5 D1 36" 1-3/8" Right Yale 5401LN (F75)
#6 D1 36" 1-3/8" Left Yale 5401LN (F75)
Mechanical D1 36" 1-3/8" Left Yale 5401LN (F75)
#7 D4 36" 1-3/8" Left
#8 D1 36" 1-3/8" Left Yale 5401LN (F75)
#9 D1 36" 1-3/8" Right Yale 5401LN (F75)
#10 D1 36" 1-3/8" Right Yale 5401LN (F75)
#11a D11 Metal 36" 1-3/4" Right TruDoor w/ 30"x60" Glass Kit
Yale 5401LN (F75) With Shade, Translucent Lit, 3M Scothshield Ultra Safety & Security Window Film
#11a D5 Metal 36" 1-3/8" Left New Yale 5405LN (F86) Yale Series 1100, 1101BFxcov, Finish689, Regular Arm Key on Foyer Side
#11b D8 Wood 30" 1-3/8" Left+Right New - Double Door Yale 5401LN (F75) Yale (2) Flush Bolt for wooden doors 200mm
#11b D4 Metal 36" 1-3/8" Right New Yale NTB613 Yale Series 1100, 1101BFxcov, Finish689, Regular Arm
#11c D1 36" 1-3/8" Left New Yale 5401LN (F75)
#11c D2 Metal 36" 1-3/4" Left TruDoor w/ 6x27 Lite Kit
Yale Yale NTB613, Electric Switch
Yale Series 1100, 1101BFxcov, Finish689, Regular Arm
Keypad on Foyer Side, 3M Scothshield Ultra Safety & Security Window Film. See Note 4.
#12a D1 36" 1-3/8" Right Existing Yale 5401LN (F75)
#12b D7 Metal 36" 1-3/8" Left New Yale 5405LN (F86) Yale Series 1100, 1101BFxcov, Finish689, Regular Arm Key on Reception Side
Hallway D9 Metal 36" 1-3/4" Left TruDoor w/ 6x27 Lite Kit Yale 5405LN (F86) Yale Series 1100, 1101BFxcov, Finish689, Regular Arm Key on Hallway/Conference Side. Provide 3M Scothshield Ultra Safety & Security Window Film.
#13 D1 36" 1-3/8" Left Existing
#14 D1 36" 1-3/8" Left Existing
#15 D1 36" 1-3/8" Left Existing
#16a D3 36" 1-3/8" Right New Yale D111
#16b D3 Metal 36" 1-3/8" Left New Yale D111
#17 D4 36" 1-3/8" Left Existing
#18 D4 36" 1-3/8" Right Existing
#19 D4 36" 1-3/8" Left Existing
Chase (1) D1 36" 1-3/8" Right Existing Yale 5401LN (F75)
Chase (2) D6 36" 1-3/8" Left Existing Yale 5405LN (F86) Key Hallway Side
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
Existing (Wood)
1. New and Replaced doors shall be Jeld-Wen Colonist, 6 panel ProCore - solid core door with a STC rating of 32 or greater, color Stone or approved equal except as noted above.
2. Keying:
· Room #1 master key to all doors.
· Room #16 Keyed to open all doors except rooms #1 & #14
· Room #14 Keyed to open all doors except rooms #1 & #16
· All remaining rooms shall be keyed the same as required.
3. Quantities: 30 Doors, 30 Latches
4. Locate entry switch under Reception desk per Sheet 14.
Door Schedule Notes:
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Replace
Yale 5401LN (F75)
Yale 5405LN (F86)
Yale 5401LN (F75)
Yale 5401LN (F75)
Yale 5401LN (F75)
Yale 5401LN (F75)
D12Restrooms No Work
Yale 5405LN (F86)
Yale 5405LN (F86)
Yale 5405LN (F86)
Yale 5401LN (F75)
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Door Schedule
15 18
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 06-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
Threshold
Flooring
Door5
8" GYP. BD.
8" GYP. BD.
8" GYP. BD.
8" GYP. BD.
Metal Frame.
Door.
Metal Frame.
Door.
(2) 2x10 w/ OSB Filler
(TYP.).
2 x 4
1. Room #16b has a thicker wall. Increase size of metal frame to accommodate or adjust plywood. Provide additional OSB filler to header to achieve necessary depth.
2. Rip 2x10 as needed for Room #16a (D3), Hallway (D10), and Room #12b (D7).
Door Frame Notes:
Header Jamb
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Door Details
16 18
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 06-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
Existing duct (TYP.)
Existing duct
Existing return
New 32"w x 12"h Grill returns, one located within 12" ceiling, one located within 12" floor. QTY 8.
New 32"w x 12"h Grill returns, located within 12" ceiling, QTY 2.
Reroute duct along ceiling
Install grill sized appropriately for supply
2x6 structural grade rafters, 24" OC
8" Drywall ceiling, Smooth finish
New 32"w x 12"h Grill return, located within 12" ceiling, QTY 2.
Adjust Existing duct for new ceiling
2x6 structural grade rafters, 16" OC. Same ceiling height and finish as reception area.
Drop Ceiling
Return air grill, TYP.
Do not cut studs in vent
Reception Ceiling Detail
2x6 header with metal J-bead drywall attachment edging
Typical Grill Detail
Move existing return
Reception Desk below.
Contractor to submit proposal for rafter tie-in to existing wall.
COR approval required.
Existing duct (TYP.)
12b
11c
12a
11b
11a
12" MAX
12" MAX Proposed HVAC Layout
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
HVAC
17 18
AutoCAD SHX Text Bathrooms
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 06-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
1'-4"
3' -4
3'
3' -8
8'-5"
3' -8
Remove section service countertop and framing for opening. Center on counter.
Oak boards with routed edges, stained Golden Oak.
Ballisic Security Glazing meeting U.L. Level
3. LP1250-BR Polycarbonate glazing, 1-1/4" thick, by Total Security Solutions, INC or approved equal.
A
A
B
B
Section BB
Section AA
Existing Wall (Typ.)
Modified Counter Plan ViewExisting Counter Plan View
Modified Counter Elevation View
3-drawer casework below
1'-4"
Perimeter of desk countertop
Use removed section of service countertop to extend desk countertop.
Proposed perimeter of desk countertopService Countertop
Desk Countertop ADA Service Countertop to be removed
Framing below (typ.)
6"Service Countertop
3'
Security Glazing Layout
6" CLR
3' -8
Glazing seam and buttress
3'-8" O.C.
6"
Aluminum glazing channel assembly meeting U.L. Level 3. TSS-BL2.5 by Total Security Systems, INC or approved equal.
Right-angle wall attachment.
Provide glazing returns or jambs per manufacturer's recommendation for attachments to walls as shown.
In-line wall attachment.
9"
Glazing seam and buttress
Wall behind
Security Glazing and Track
8'-5"
Join glazing at corner without post per manufacturer's instructions.
Service Countertop behind
Desk Countertop
Security glazing
PROJECT NAME
DRAWING TITLE
OF
SHEET
United States Department of Agriculture Forest Service
R8
SOUTHERN REGION
GRANDFATHER
RANGER DISTRICT
OFFICE REMODEL
PISGAH
NATIONAL FOREST
GRANDFATHER
RANGER DISTRICT
Reception Counter Alterations and
Security Glazing
18 18
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNER:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text 07-15-2024
AutoCAD SHX Text
. J HALLENBECK
AutoCAD SHX Text
J HALLENBECK
File details come from the government source that posted it. Updated .