Attach J.4 Trail Construction Plans, Drawings (20 pages).pdf

PDF 9 MB Posted

Attached to
Trail Riders Bridge Replacement
Solicitation number
1240LT22Q0052
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

964 - PREFABRICATED TRAIL BRIDGE PRE

TRAIL RIDERS NO. 1

GMUG NATIONAL FORESTS

GUNNISON RANGER DISTRICT

18 20

■ ■1919

964 - PREFABRICATED TRAIL BRIDGE PRE

TRAIL RIDERS NO. 1

GMUG NATIONAL FORESTS

GUNNISON RANGER DISTRICT

19 20

965 - TRAIL BRIDGE SUBSTRUCTURES

B

B

GAB

TRAIL RIDERS NO. 1

GMUG NATIONAL FORESTS

GUNNISON RANGER DISTRICT

20 20

6. SILL DIMENSIONS SHALL BE 2 1/2' x 2 1/2' x 7' MINIMUM. GABION FOUNDATION SHALL BE 3 EACH, 3' x 3' x 9' GABIONS SET TRANSVERSE

TO THE CONCRETE GRADE BEAM ON THE UP STATION END OF THE

BRIDGE. THE DOWN STATION END OF THE BRIDGE SHALL BE SET ON

A LEVELING COURSE OF CDOT CLASS 6 AGGREGATE, WITH A 6" DEEP

COMPACTED DEPTH.

File details come from the government source that posted it. Updated .