Attach J.2 - SOW and Specifications - 42 Pages.pdf
PDF 351 KB Posted
- Attached to
- Price Yard Building Electrical and Heating Federal contract opportunity
- Solicitation number
- 1240LT25Q0042
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) and Specifications for the Price Yard Fire Storage Electrical and Heating project located at 905 W 1100 S, Price, UT 84501 in the Manti-Lasal National Forest. The project involves electrical service installation, including lighting, receptacles, equipment installation, two overhead door operators, and a natural gas heating system. The contract requires installing electrical and gas service, obtaining permits, and completing work within 45 calendar days with an estimated start date of September 15, 2025.
The SOW details specific technical requirements across multiple sections, including hangers and supports, natural gas piping, gas-fired furnaces, electrical systems, and asphalt repair. Key specifications include using steel pipe, complying with national electrical and gas codes, installing underground warning tape, and ensuring proper grounding and bonding. The project will use copper conductors, metal conduits, and requires precise installation methods with attention to safety, grounding, and environmental considerations. Materials must meet specific standards from organizations like NEMA, NFPA, and ASTM, and all work will be paid as a lump sum through the Schedule of Items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach J.7 - Past Performance Form.pdf | ||
| Attach J.3 - Drawings - 4 Pages.pdf | ||
| SF1442 1240LT25Q0042 - Final.pdf | ||
| Attach J.1 - Schedule of Items.pdf | ||
| Attach J.6 - Question and Answer Sheet.pdf | ||
| Attach J.5 - Contractor Experience Questionaire - Pages.pdf | ||
| Attach J.4 - WD UT20250070 dtd 5-23-25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 01-1
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING
1.1 SCOPE OF CONTRACT
A. This project includes an electrical service and the electrical installation of lighting, receptacles, and equipment to the previously constructed Price Yard Fire Storage Building as described in the drawings. The Contractor will be responsible for coordinating installation of electrical and gas service and obtaining any and all permits and paying fees associated with the permits
Overhead Door Operators – Providing and installing two overhead door operators with electrical circuits and controls.
Heating System – Providing and installing a natural gas system with unit heater, electrical circuit and controls.
Quantities for new utility lines are approximated. Lump sum quantities will be used for bidding. Prebid Site visit Advised.
1.2 PROJECT LOCATION
A. The project is located at 905 W 1100 S, Price, UT 84501 in the Price Ranger District of the Manti-Lasal National Forest, Carbon County, Utah.
B. Latitude: 39.615447 Longitude: -110.795056
1.3 SITE INFORMATION AND LIMITATIONS
A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
1. Construction sites will be closed to the public during construction. The Forest Service will issue a closure order to the public. The Contractor will be responsible for signing and limiting public access.
2. All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brush guard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.
3. Water is available at the site for construction purposes. Utilities are available at the site for construction purposes.
4. Toilet facilities are not available at the Site. The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work.
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-2
1.4 WORK CAMPS, STAGING AND STORAGE AREAS
A. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage work trailers.
B. No overnight camping will be allowed on site.
1.5 INSPECTION OF WORKSITE
A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
1.4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING
A. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD).
Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
1.2 START DATE
A. Estimated 9/15/2025
1.3 CONTRACT TIME
A. 45 Calendar Days
1.4 PRE-BID TOUR
A. No formal site tour is planned; however, bidders are strongly encouraged to visit the site prior to preparing and submitting their bid.
1.5 PRE-BID CONFERENCE
A. None.
1.6 SPECIFICATIONS
A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental, and no additional compensation will be made.
Section 230529 - Hangers And Supports
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-3
Section 231123 - Facility Natural-Gas Piping Section 235416.13 - Gas Fired Furnaces Section 260500 - Common Work Results for Electrical Section 260519 - Low-Voltage Electrical Power Conductors and Cables Section 260526 - Grounding and Bonding for Electrical Systems Section 260533 - Raceways And Boxes for Electrical Systems Section 260553 - Identification For Electrical Systems Section 262726 - Wiring Devices Section 321202 - Cold-Mix Asphalt for Repairs Section 312000 - Earthwork Section 312225 - Excavation Embankment Section 022450 - Grading Sections 312000, 312225 and 022450 are added as an attachment.
END OF SECTION C
HANGERS AND SUPPORTS 230529-1
USDA FOREST SERVICE, R4
PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING
SECTION 230529 - HANGERS AND SUPPORTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following hangers and supports for HVAC system piping and equipment:
1. Steel pipe hangers and supports.
2. Trapeze pipe hangers.
B. Related Sections include the following:
1. Division 05 Section "Metal Fabrications" for structural-steel shapes and plates for trapeze hangers for pipe and equipment supports.
2. Division 23 Section(s) "Metal Ducts" for duct hangers and supports.
1.3 DEFINITIONS
A. MSS: Manufacturers Standardization Society for The Valve and Fittings Industry Inc.
B. Terminology: As defined in MSS SP-90, "Guidelines on Terminology for Pipe Hangers and Supports."
1.4 MEASUREMENT AND PAYMENT
A. No separate measurement or payment will be made for work specified in this section. All work will be included in other items listed in the Schedule of Items.
1.5 PERFORMANCE REQUIREMENTS
A. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.
B. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.
C. Design seismic-restraint hangers and supports for piping and equipment and obtain approval from authorities having jurisdiction.
1.6 SUBMITTALS
HANGERS AND SUPPORTS 230529-2
A. Product Data: For the following:
1. Steel pipe hangers and supports.
2. Mechanical Anchors: ICC-ES Evaluation Reports validating ‘Cracked Concrete’ testing per A.C. 193 must be provided for anchors resisting seismic loads and/or supporting life- safety systems including fire sprinkler systems.
B. Shop Drawings: Signed and sealed by a qualified professional engineer. Show fabrication and installation details and include calculations for the following:
1. Trapeze pipe hangers. Include Product Data for components.
2. Metal framing systems. Include Product Data for components.
C. Welding certificates.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified.
2.2 STEEL PIPE HANGERS AND SUPPORTS
A. Description: MSS SP-58, Types 1 through 58, factory-fabricated components. Refer to Part 3 "Hanger and Support Applications" Article for where to use specific hanger and support types.
B. Manufacturers:
1. AAA Technology & Specialties Co., Inc.
2. Bergen-Power Pipe Supports.
3. B-Line Systems, Inc.; a division of Cooper Industries.
C. Galvanized, Metallic Coatings: Pregalvanized or hot dipped.
D. Nonmetallic Coatings: Plastic coating, jacket, or liner.
E. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion for support of bearing surface of piping.
2.3 METAL FRAMING SYSTEMS
A. Description: MFMA-3, shop- or field-fabricated pipe-support assembly made of steel channels and other components.
B. Manufacturers:
1. B-Line Systems, Inc.; a division of Cooper Industries.
HANGERS AND SUPPORTS 230529-3
2. ERICO/Michigan Hanger Co.; ERISTRUT Div.
3. Hilti, Inc.
C. Coatings: Manufacturer's standard finish, unless bare metal surfaces are indicated.
D. Nonmetallic Coatings: Plastic coating, jacket, or liner.
2.4 MISCELLANEOUS MATERIALS
A. Structural Steel: ASTM A 36/A 36M, steel plates, shapes, and bars; black and galvanized.
PART 3 - EXECUTION
3.1 HANGER AND SUPPORT APPLICATIONS
A. Specific hanger and support requirements are specified in Sections specifying piping systems and equipment.
B. Comply with MSS SP-69 for pipe hanger selections and applications that are not specified in piping system Sections.
C. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.
D. Use padded hangers for piping that is subject to scratching.
E. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated stationary pipes, NPS 1/2 to NPS 30.
F. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers, NPS 3/4 to NPS 20.
2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers, NPS 3/4 to NPS 20, if longer ends are required for riser clamps.
G. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads.
2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.
3. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings.
4. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building attachments.
5. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F piping installations.
HANGERS AND SUPPORTS 230529-4
H. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel or Malleable Concrete Inserts (MSS Type 18 or Simpson Blue Banger Concrete insert with UL & FM approvals): For upper attachment to suspend pipe hangers from concrete ceiling.
2. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction to attach to top flange of structural shape.
3. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams, channels, or angles.
I. Comply with MSS SP-69 for trapeze pipe hanger selections and applications that are not specified in piping system Sections.
J. Comply with MFMA-102 for metal framing system selections and applications that are not specified in piping system Sections.
K. Use mechanical-expansion anchors or screw instead of building attachments where required in concrete construction. For anchors resisting seismic loads and/or supporting life-safety systems including fire sprinkler systems, anchors shall have been tested for ‘Cracked Concrete’ per A.C. 193 and shall have a valid ICC-ES Evaluation Report
3.2 HANGER AND SUPPORT INSTALLATION
A. Steel Pipe Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from building structure.
B. Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers, and other accessories.
C. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
D. Install lateral bracing with pipe hangers and supports to prevent swaying. For applications where seismic bracing is required, ‘Cracked Concrete’ expansion anchors or concrete screws tested per A.C. 193 must be provided for seismic bracing anchorage where post-installed anchors are required.
E. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.
F. Load Distribution: Install hangers and supports so piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
3.3 ADJUSTING
HANGERS AND SUPPORTS 230529-5
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.
B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.
END OF SECTION
February 2018
FACILITY NATURAL-GAS PIPING 231123-1
PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING
SECTION 231123 - FACILITY NATURAL-GAS PIPING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Pipes, tubes, and fittings.
2. Piping specialties.
3. Piping and tubing joining materials.
4. Valves.
5. Pressure regulators.
6. Mechanical sleeve seals.
7. This division is to pay all costs associated with the gas meter that are required by the local gas company/authority or from separate building including trenching.
1.3 DEFINITIONS
A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
1.5 PERFORMANCE REQUIREMENTS
A. Minimum Operating-Pressure Ratings:
1. Piping and Valves: 100 psig minimum unless otherwise indicated.
B. Natural-Gas System Pressures within Buildings: Two pressure ranges. Primary pressure is more than 2 psig but not more than 5 psig, and is reduced to secondary pressure of more than 0.5 psig but not more than 2 psig.
1.6 SUBMITTALS
A. Product Data: For each type of the following:
FACILITY NATURAL-GAS PIPING 231123-2
1. Piping specialties.
2. Valves. Include pressure rating, capacity, settings, and electrical connection data of selected models.
3. Pressure regulators. Indicate pressure ratings and capacities.
4. Dielectric fittings.
5. Mechanical sleeve seals.
B. Coordination Drawings: Plans and details, drawn to scale, on which natural-gas piping is shown and coordinated with other installations, using input from installers of the items involved.
C. Site Survey: Plans, drawn to scale, on which natural-gas piping is shown and coordinated with other services and utilities.
D. Qualification Data: For qualified professional engineer.
E. Field quality-control reports.
F. Operation and Maintenance Data: For pressure regulators to include in emergency, operation, and maintenance manuals.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Handling Flammable Liquids: Remove and dispose of liquids from existing natural-gas piping according to requirements of authorities having jurisdiction.
B. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.
C. Store and handle pipes and tubes having factory-applied protective coatings to avoid damaging coating, and protect from direct sunlight.
1.8 COORDINATION
A. Coordinate sizes and locations of concrete bases with actual equipment provided.
B. Coordinate requirements for access panels and doors for valves installed concealed behind finished surfaces. Comply with requirements in Division 08 Section "Access Doors and Frames."
2.1 PIPES, TUBES, AND FITTINGS
A. Steel Pipe: ASTM A 53/A 53M, black steel, Schedule 40, Type E or S, Grade B.
1. Malleable-Iron Threaded Fittings: ASME B16.3, Class 150, standard pattern.
2. Wrought-Steel Welding Fittings: ASTM A 234/A 234M for butt welding and socket welding.
FACILITY NATURAL-GAS PIPING 231123-3
3. Unions: ASME B16.39, Class 150, malleable iron with brass-to-iron seat, ground joint, and threaded ends.
4. Forged-Steel Flanges and Flanged Fittings: ASME B16.5, minimum Class 150, including bolts, nuts, and gaskets of the following material group, end connections, and facings:
a. Material Group: 1.1.
b. End Connections: Threaded or butt welding to match pipe.
c. Lapped Face: Not permitted underground.
d. Gasket Materials: ASME B16.20, metallic, flat, asbestos free, aluminum o-rings, and spiral-wound metal gaskets.
e. Bolts and Nuts: ASME B18.2.1, carbon steel aboveground and stainless steel underground.
2.2 PIPING SPECIALTIES
A. Appliance Flexible Connectors:
1. Indoor, Fixed-Appliance Flexible Connectors: Comply with ANSI Z21.24.
2. Indoor, Movable-Appliance Flexible Connectors: Comply with ANSI Z21.69.
3. Outdoor, Appliance Flexible Connectors: Comply with ANSI Z21.75.
4. Corrugated stainless-steel tubing with polymer coating.
5. Operating-Pressure Rating: 0.5 psig.
6. End Fittings: Zinc-coated steel.
7. Threaded Ends: Comply with ASME B1.20.1.
8. Maximum Length: 72 inches.
B. Quick-Disconnect Devices: Comply with ANSI Z21.41.
1. Copper-alloy convenience outlet and matching plug connector.
2. Nitrile seals.
3. Hand operated with automatic shutoff when disconnected.
4. For indoor or outdoor applications.
5. Adjustable, retractable restraining cable.
C. Y-Pattern Strainers:
1. Body: ASTM A 126, Class B, cast iron with bolted cover and bottom drain connection.
2. End Connections: Threaded ends for NPS 2 and smaller; flanged ends for NPS 2- 1/2 and larger.
3. Strainer Screen: [40] [60]-mesh startup strainer, and perforated stainless-steel basket with 50 percent free area.
4. CWP Rating: 125 psig.
2.3 JOINING MATERIALS
A. Joint Compound and Tape: Suitable for natural gas.
FACILITY NATURAL-GAS PIPING 231123-4
B. Welding Filler Metals: Comply with AWS D10.12/D10.12M for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
2.4 MANUAL GAS SHUTOFF VALVES
A. General Requirements for Metallic Valves, NPS 2 and Smaller: Comply with
ASME B16.33.
1. CWP Rating: 125 psig.
2. Threaded Ends: Comply with ASME B1.20.1.
3. Dryseal Threads on Flare Ends: Comply with ASME B1.20.3.
4. Tamperproof Feature: Locking feature for valves indicated in "Underground
Manual Gas Shutoff Valve Schedule" and "Aboveground Manual Gas Shutoff Valve Schedule" Articles.
5. Listing: Listed and labeled by an NRTL acceptable to authorities having jurisdiction for valves 1 inch and smaller.
6. Service Mark: Valves 1-1/4 inches to NPS 2 shall have initials "WOG" permanently marked on valve body.
B. General Requirements for Metallic Valves, NPS 2-1/2 and Larger: Comply with
ASME B16.38.
1. CWP Rating: 125 psig.
2. Flanged Ends: Comply with ASME B16.5 for steel flanges.
3. Tamperproof Feature: Locking feature for valves indicated in "Underground
Manual Gas Shutoff Valve Schedule" and "Aboveground Manual Gas Shutoff Valve Schedule" Articles.
4. Service Mark: Initials "WOG" shall be permanently marked on valve body.
2.5 PRESSURE REGULATORS
A. General Requirements:
1. Single stage and suitable for natural gas.
2. Steel jacket and corrosion-resistant components.
3. Elevation compensator.
4. End Connections: Threaded for regulators NPS 2 and smaller; flanged for regulators NPS 2-1/2 and larger.
B. Line Pressure Regulators: Comply with ANSI Z21.80.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Actaris.
b. American Meter Company.
2. Body and Diaphragm Case: Cast iron or die-cast aluminum.
3. Springs: Zinc-plated steel; interchangeable.
4. Diaphragm Plate: Zinc-plated steel.
FACILITY NATURAL-GAS PIPING 231123-5
5. Seat Disc: Nitrile rubber resistant to gas impurities, abrasion, and deformation at the valve port.
6. Orifice: Aluminum; interchangeable.
7. Seal Plug: Ultraviolet-stabilized, mineral-filled nylon.
8. Single-port, self-contained regulator with orifice no larger than required at maximum pressure inlet, and no pressure sensing piping external to the regulator.
9. Pressure regulator shall maintain discharge pressure setting downstream, and not exceed 150 percent of design discharge pressure at shutoff.
10. Overpressure Protection Device: Factory mounted on pressure regulator.
11. Atmospheric Vent: Factory- or field-installed, stainless-steel screen in opening if not connected to vent piping.
12. Maximum Inlet Pressure: 5 psig.
2.6 SLEEVES
A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized steel, plain ends.
B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.
2.7 MECHANICAL SLEEVE SEALS
A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Advance Products & Systems, Inc.
b. Calpico Inc.
c. Sealing Elements: EPDM interlocking links shaped to fit surface of pipe.
Include type and number required for pipe material and size of pipe and sleeve.
2. Pressure Plates: Stainless steel.
3. Connecting Bolts and Nuts: Stainless steel of length required to secure pressure plates to sealing elements. Include one nut and bolt for each sealing element.
2.8 LABELING AND IDENTIFYING
A. Detectable Warning Tape: Acid- and alkali-resistant, PE film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches wide and 4 mils thick, continuously inscribed with a description of utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches deep; colored yellow.
FACILITY NATURAL-GAS PIPING 231123-6
3.1 EXAMINATION
A. Examine roughing-in for natural-gas piping system to verify actual locations of piping connections before equipment installation.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Close equipment shutoff valves before turning off natural gas to premises or piping section.
B. Inspect natural-gas piping according to the International Fuel Gas Code to determine that natural-gas utilization devices are turned off in piping section affected.
C. Comply with the International Fuel Gas Code requirements for prevention of accidental ignition.
3.3 INDOOR PIPING INSTALLATION
A. Comply with the International Fuel Gas Code for installation and purging of natural-gas piping.
B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements are used to size pipe and calculate friction loss, expansion, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.
C. Arrange for pipe spaces, chases, slots, sleeves, and openings in building structure during progress of construction, to allow for mechanical installations.
D. Install piping in concealed locations unless otherwise indicated and except in equipment rooms and service areas.
E. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
F. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.
G. Locate valves for easy access.
H. Install natural-gas piping at uniform grade of 2 percent down toward drip and sediment traps.
I. Install piping free of sags and bends.
J. Install fittings for changes in direction and branch connections.
K. Install escutcheons at penetrations of interior walls, ceilings, and floors.
1. New Piping:
FACILITY NATURAL-GAS PIPING 231123-7
a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type.
b. Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast-brass type with polished chrome-plated finish.
c. Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, stamped-steel type.
d. Piping at Ceiling Penetrations in Finished Spaces: One-piece or split-casting, cast-brass type with polished chrome-plated finish.
e. Piping at Ceiling Penetrations in Finished Spaces: One-piece, stamped-steel type or split-plate, stamped-steel type with concealed hinge and set screw.
f. Piping in Unfinished Service Spaces: One-piece, cast-brass type with polished chrome-plated finish.
g. Piping in Unfinished Service Spaces: One-piece, stamped-steel type with set screw or spring clips.
h. Piping in Equipment Rooms: One-piece, cast-brass type.
i. Piping in Equipment Rooms: One-piece, stamped-steel type with set screw or spring clips.
j. Piping at Floor Penetrations in Equipment Rooms: One-piece, floor-plate type.
L. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements in Division 07 Section "Penetration Firestopping."
M. Verify final equipment locations for roughing-in.
N. Drips and Sediment Traps: Install drips at points where condensate may collect, including service-meter outlets. Locate where accessible to permit cleaning and emptying. Do not install where condensate is subject to freezing.
1. Construct drips and sediment traps using tee fitting with bottom outlet plugged or capped. Use nipple a minimum length of 3 pipe diameters, but not less than 3 inches long and same size as connected pipe. Install with space below bottom of drip to remove plug or cap.
O. Extend relief vent connections for service regulators, line regulators, and overpressure protection devices to outdoors and terminate with weatherproof vent cap.
P. Conceal pipe installations in walls, pipe spaces, utility spaces, above ceilings, below grade or floors, and in floor channels unless indicated to be exposed to view.
Q. Concealed Location Installations: Except as specified below, install concealed natural-gas piping and piping installed under the building in containment conduit constructed of steel pipe with welded joints as described in Part 2. Install a vent pipe from containment conduit to outdoors and terminate with weatherproof vent cap.
1. Above Accessible Ceilings: Natural-gas piping, fittings, valves, and regulators may be installed in accessible spaces without containment conduit.
2. In Floors: Install natural-gas piping with welded or brazed joints and protective coating in cast-in-place concrete floors. Cover piping to be cast in concrete slabs
FACILITY NATURAL-GAS PIPING 231123-8
with minimum of 1-1/2 inches of concrete. Piping may not be in physical contact with other metallic structures such as reinforcing rods or electrically neutral conductors. Do not embed piping in concrete slabs containing quick-set additives or cinder aggregate.
3. In Floor Channels: Install natural-gas piping in floor channels. Channels must have cover and be open to space above cover for ventilation.
4. In Walls or Partitions: Protect tubing installed inside partitions or hollow walls from physical damage using steel striker barriers at rigid supports.
a. Exception: Tubing passing through partitions or walls does not require striker barriers.
5. Prohibited Locations:
a. Do not install natural-gas piping in or through circulating air ducts, clothes or trash chutes, chimneys or gas vents (flues), ventilating ducts, or dumbwaiter or elevator shafts.
b. Do not install natural-gas piping in solid walls or partitions.
R. Use eccentric reducer fittings to make reductions in pipe sizes. Install fittings with level side down.
S. Connect branch piping from top or side of horizontal piping.
T. Install unions in pipes NPS 2 and smaller, adjacent to each valve, at final connection to each piece of equipment. Unions are not required at flanged connections.
U. Do not use natural-gas piping as grounding electrode.
V. Install strainer on inlet of each line-pressure regulator and automatic or electrically operated valve.
W. Install pressure gage upstream and downstream from each line regulator. Pressure gages are specified in Division 23 Section "Meters and Gages for HVAC Piping."
3.4 VALVE INSTALLATION
A. Install manual gas shutoff valve for each gas appliance ahead of corrugated stainless-steel tubing, aluminum, or copper connector.
B. Install underground valves with valve boxes.
C. Install regulators and overpressure protection devices with maintenance access space adequate for servicing and testing.
D. Install earthquake valves aboveground outside buildings according to listing.
E. Install anode for metallic valves in underground PE piping.
3.5 PIPING JOINT CONSTRUCTION
A. Ream ends of pipes and tubes and remove burrs.
FACILITY NATURAL-GAS PIPING 231123-9
B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
C. Welded Joints:
1. Construct joints according to AWS D10.12/D10.12M, using qualified processes and welding operators.
2. Bevel plain ends of steel pipe.
3. Patch factory-applied protective coating as recommended by manufacturer at field welds and where damage to coating occurs during construction.
D. Flanged Joints: Install gasket material, size, type, and thickness appropriate for natural-gas service. Install gasket concentrically positioned.
3.6 HANGER AND SUPPORT INSTALLATION
A. Install seismic restraints on piping. Comply with requirements for seismic-restraint devices specified in Division 23 Section "Vibration and Seismic Controls for HVAC Piping and Equipment."
B. Comply with requirements for pipe hangers and supports specified in Division 23 Section "Hangers and Supports for HVAC Piping and Equipment."
C. Install hangers for horizontal steel piping with the following maximum spacing and minimum rod sizes:
1. NPS 1 and Smaller: Maximum span, 96 inches; minimum rod size, 3/8 inch.
2. NPS 1-1/4: Maximum span, 108 inches; minimum rod size, 3/8 inch.
3. NPS 1-1/2 and NPS 2: Maximum span, 108 inches; minimum rod size, 3/8 inch.
3.7 CONNECTIONS
A. Connect to utility's gas main according to utility's procedures and requirements.
B. Install natural-gas piping electrically continuous, and bonded to gas appliance equipment grounding conductor of the circuit powering the appliance according to NFPA 70.
C. Install piping adjacent to appliances to allow service and maintenance of appliances.
D. Connect piping to appliances using manual gas shutoff valves and unions. Install valve within 72 inches of each gas-fired appliance and equipment. Install union between valve and appliances or equipment.
E. Sediment Traps: Install tee fitting with capped nipple in bottom to form drip, as close as practical to inlet of each appliance.
3.8 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Tests and Inspections:
FACILITY NATURAL-GAS PIPING 231123-10
1. Test, inspect, and purge natural gas according to the International Fuel Gas Code and authorities having jurisdiction.
C. Natural-gas piping will be considered defective if it does not pass tests and inspections.
D. Prepare test and inspection reports.
3.9 DEMONSTRATION
A. Engage a factory-authorized service representative to train Government's maintenance personnel to adjust, operate, and maintain earthquake valves.
3.10 BELOW GRADE PIPING
A. Where not installed by serving utility:
1. Gas lines shall be rated for direct burial and sized for the pressure and distances, properly nstalled.
2. Burial shall be 24-inches minimum or as require in applicable Utah adopted Codes whichever is greater.
a. Meet burial requirements in specification 260533 3.3, and warning tape requirements in specification 260553.
B. Asphalt repair is required per specifications where contractor or serving utility trenching crosses currently asphalted area.
3.11 INDOOR PIPING SCHEDULE
A. Aboveground, branch piping NPS 1 and smaller shall be the following:
1. Steel pipe with wrought-steel fittings and welded joints.
B. Aboveground, distribution piping shall be the following:
1. Steel pipe with wrought-steel fittings and welded joints.
3.12 ABOVEGROUND MANUAL GAS SHUTOFF VALVE SCHEDULE
A. Valves for pipe sizes NPS 2 and smaller at service meter shall be one of the following:
1. One-piece, bronze ball valve with bronze trim.
2. Bronze plug valve.
B. Valves for pipe sizes NPS 2-1/2 and larger at service meter shall be one of the following:
C. Bronze plug valve.
1. Cast-iron, nonlubricated plug valve.
END OF SECTION
February 2018
GAS-FIRED FURNACES 235416.13-1
PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING
SECTION 235416.13 - GAS-FIRED FURNACES
PART 1 - GENERAL
1.1 SUMMARY, Section Includes:
1. Gas-fired, condensing furnaces and accessories complete with controls.
1.2 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this section. Payment will be included in the contract unit price for items shown in the schedule of items.
1.3 SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings:
1. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
2. Include diagrams for power, signal, and control wiring.
C. Operation and maintenance data.
1.4 ASSEMBLY DESCRIPTION
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a qualified testing agency, and marked for intended location and application.
B. General Requirements for Noncondensing Gas-Fired Furnaces: Factory assembled, piped, wired, and tested; complying with ANSI Z21.47/CSA 2.3 and NFPA 54.
2.2 GAS-FIRED FURNACES, CONDENSING
A. The manufacturer and model on the drawings set the minimum standard, type, and size.
2.3 THERMOSTATS
A. Controls shall comply with requirements in ASHRAE/IES 90.1, "Controls."
1. Drawings indicate method operation to base deign on.
GAS-FIRED FURNACES 235416.13-2
3.1 INSTALLATION
A. Install gas-fired furnaces and associated fuel and vent features and systems according to
NFPA 54.
B. Suspended Units: Suspend from structure using threaded rods, spring hangers, and building attachments. Secure rods to unit hanger attachments. Adjust hangers so unit is level and plumb.
C. Controls: Install thermostats and humidistats at mounting height of 48 inches above floor.
3.2 CONNECTIONS
A. Gas piping installation requirements are specified in Section 231123 "Facility Natural- Gas Piping”. Drawings indicate general arrangement of piping, fittings, and specialties.
Connect gas piping with union or flange and appliance connector valve.
B. Install piping adjacent to equipment to allow service and maintenance.
C. Vent and Outside-Air Connection, Condensing, Gas-Fired Furnaces: Connect plastic piping vent material to furnace connections and extend outdoors. Terminate vent outdoors with a cap and in an arrangement that will protect against entry of birds, insects, and dirt.
1. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
2. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
3. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:
a. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements.
b. CPVC Piping: Join according to ASTM D 2846/D 2846M, Appendix.
c. PVC Pressure Piping: Join schedule number ASTM D 1785 PVC pipe and
PVC socket fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D 2855.
4. Slope pipe vent back to furnace or to outside terminal.
3.3 FIELD QUALITY CONTROL
A. Perform the following tests and inspections:
1. Perform electrical test and visual and mechanical inspection.
2. Operational Test: After electrical circuitry has been energized, start units to confirm proper operation, product capability, and compliance with requirements.
3. Verify that fan is rotating in the correct direction and is not vibrating or binding.
4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
GAS-FIRED FURNACES 235416.13-3
B. Verify that vibration isolation and flexible connections properly dampen vibration transmission to structure.
END OF SECTION 235416.13
JUNE 2019
COMMON WORK RESULTS FOR ELECTRICAL 260500-1
PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING
SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Electrical equipment coordination and installation.
2. Common electrical installation requirements.
3. Hangers and supports.
1.2 SUBMITTALS
A. Product Data:
1. For any substitutions for equipment referred to by name in Division 26 specifications or the drawings.
1.3 QUALITY ASSURANCE
A. The installation shall conform to the 2020 Edition of the National Electrical Code (NFPA
70) and to the requirements specified herein.
B. The Contractor shall perform all work necessary and required to accomplish the task as detailed on the drawings and discussed in the installation notes. All work shall be done by a state licensed electrician.
A. The work in this section, including all incidentals in other electrical sections, shall be measured and paid for by the following method as shown in the Schedule of Items:
1. Electrical System - Lump Sum including full compensation for all labor, materials, and incidentals necessary to complete the work as shown on the drawings including all wiring, trenching, bedding, backfill, and all other incidentals necessary for a functional system.
2.1 PRODUCTS REFERRED TO BY NAME
A. The materials referred to by trade name, make, or catalog number on the drawings shall be regarded as establishing a minimum standard of quality; substitutions of equal or greater quality can be made by submitting a data sheet of the proposed substituted item to the Contracting Officer, for approval.
COMMON WORK RESULTS FOR ELECTRICAL 260500-2
3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION
A. Comply with NECA 1.
B. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit for wall-mounting items.
C. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide maximum possible headroom consistent with these requirements.
D. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.
E. Right of Way: Give to piping systems installed at a required slope.
3.2 RACEWAY AND SIMILAR PENETRATIONS (NON-FIRE RATED, NOT
SLEEVED)
A. Aboveground, Exterior-Wall Penetrations: Seal exterior opening around the raceway or cable, using a flexible, waterproofing, joint sealant appropriate for size, depth, and color to closely match the surrounding surface. Finish interior openings, filling opening and matching the exiting surface with appropriate materials and finish quality for the space.
3.3 HANGERS AND SUPPORTS
A. Installation:
1. Comply with NECA 1 and NECA 101 for installation requirements, except as specified in this article.
2. Separate dissimilar metals and metal products from contact with wood or cementitious materials by painting each metal surface in area of contact with a bituminous coating or by other permanent separation.
3. Raceway Support Methods: In addition to methods described in NECA 1, EMT, IMC and RMC may be supported by openings through structure members, as permitted in NFPA 70.
4. Multiple Raceways or Cables: Install on trapeze-type supports fabricated with steel slotted channel.
5. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination shall be weight of supported components plus 200 lb (90 kg).
6. Mounting and Anchorage of Surface-Mounted Equipment and Components:
Anchor and fasten electrical items and their supports to building structural elements by the following methods, unless otherwise indicated or required by Code:
COMMON WORK RESULTS FOR ELECTRICAL 260500-3
a. To Wood: Fasten with lag screws or through bolts.
b. To Existing Concrete: Expansion anchor fasteners.
c. To Steel: Welded, threaded studs complying with AWS D1.1/D1.1M, with lock washers and nuts; Beam clamps (MSS Type 19, 21, 23, 25, or 27) complying with MSS SP-69; Spring-tension clamps.
d. To Light Steel: Sheet metal screws.
e. Items Mounted on Hollow Walls and Nonstructural Building Surfaces:
Mount on slotted-channel racks attached to substrate.
END OF SECTION 260500
December 2024
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519-1
PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING
SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Copper building wire rated 600 V or less.
2. Connectors, splices, and terminations rated 600 V and less.
1.2 MEASUREMENT AND PAYMENT
2.1 COPPER BUILDING WIRE
A. Description: Flexible, insulated and uninsulated, drawn copper current-carrying conductor with an overall insulation layer or jacket, or both, rated 600 V or less.
B. Standards:
1. Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and use.
C. Conductors: Copper, complying with ASTM B 3 for bare annealed copper and with ASTM B 8 for stranded conductors.
D. Conductor Insulation:
1. Type THHN/THWN-2: Comply with UL 83.
2. Type XHHW-2: Comply with UL 44.
E. Cable: Comply with NEMA WC 70/ICEA S-95-658 for:
1. Armored cable, Type AC.
2. Metal-clad cable, Type MC.
3. Tray cable, Type TC-ER.
2.2 CONNECTORS AND SPLICES
A. Description: Factory-fabricated connectors and splices of size, ampacity rating, material, type, and class for application and service indicated.
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 260519-2
3.1 CONDUCTOR MATERIAL APPLICATIONS
A. Circuits: Copper; solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.
1. Aluminum conductors are prohibited unless specifically called for on the drawings.
B. Exposed to Direct Sunlight: Sunlight resistant.
3.2 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS
AND WIRING METHODS
A. Exposed Branch Circuits: Type THHN/THWN-2, single conductors in raceway.
B. Branch Circuits Concealed in Ceilings, Walls, and Partitions: Type THHN/THWN-2, single conductors in raceway; Armored cable, Type AC; or Metal-clad cable, Type MC.
3.3 INSTALLATION OF CONDUCTORS AND CABLES
A. Conceal cables in finished walls, ceilings, and floors unless otherwise indicated.
B. Complete raceway installation between conductor and cable termination points according to Section 260533 "Raceways and Boxes for Electrical Systems" prior to pulling conductors and cables.
C. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.
D. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips that will not damage cables or raceway.
E. Support cables according to Section 260529 "Hangers and Supports for Electrical Systems."
3.4 CONNECTIONS
A. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A-486B.
B. Make splices, terminations, and taps that are compatible with conductor material.
C. Wiring at Outlets: Install conductor at each outlet, with at least 6 inches (150 mm) of slack.
END OF SECTION 260519
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526-1
PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes grounding and bonding systems and equipment.
1.2 MEASUREMENT AND PAYMENT
2.1 SYSTEM DESCRIPTION
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
B. Comply with UL 467 for grounding and bonding materials and equipment.
2.2 CONDUCTORS
A. Insulated Conductors: Copper wire or cable insulated for 600 V unless otherwise required by applicable Code or authorities having jurisdiction.
B. Bare Copper Conductors:
1. Solid Conductors: ASTM B 3.
2. Stranded Conductors: ASTM B 8.
3. Tinned Conductors: ASTM B 33.
2.3 CONNECTORS
A. Listed and labeled by a Nationally Recognized Testing Laboratory (NRTL) acceptable to authorities having jurisdiction for applications in which used and for specific types, sizes, and combinations of conductors and other items connected.
B. Welded Connectors: Exothermic-welding kits of types recommended by kit manufacturer for materials being joined and installation conditions.
C. Bolted Connectors for Conductors and Pipes: Copper or copper alloy.
2.4 GROUNDING ELECTRODES
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526-2
A. Concrete encased electrode is existing.
3.1 APPLICATIONS
A. Conductors: Install solid conductor for No. 8 AWG and smaller, and stranded conductors for No. 6 AWG and larger unless otherwise indicated.
3.2 GROUNDING AT THE SERVICE
A. Equipment grounding conductors and grounding electrode conductors shall be connected to a ground bus. Install a main bonding jumper between the neutral and ground buses.
Internal to a combination meter main, they may be the same bus with bonding to the enclosure.
3.3 EQUIPMENT GROUNDING
A. Install insulated equipment grounding conductors with all feeders and branch circuits.
3.4 INSTALLATION
A. Grounding Conductors: Route along shortest and straightest paths possible unless otherwise indicated or required by Code. Avoid obstructing access or placing conductors where they may be subjected to strain, impact, or damage.
B. Connections: Make connections so possibility of galvanic action or electrolysis is minimized. Select connectors, connection hardware, conductors, and connection methods so metals in direct contact are galvanically compatible.
1. Use electroplated or hot-tin-coated materials to ensure high conductivity and to make contact points closer in order of galvanic series.
2. Make connections with clean, bare metal at points of contact.
3. Coat and seal connections having dissimilar metals with inert material to prevent future penetration of moisture to contact surfaces.
4. Connection to concrete encased electrode shall be permanent non-reversable if unable to directly connect to bus bar.
END OF SECTION 260526
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-1
PRICE YARD FIRE STORAGE: ELECTRICAL AND HEATING
SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Metal conduits and fittings.
2. Nonmetallic conduits and fittings.
3. Metal wireways and auxiliary gutters.
4. Boxes, enclosures, and cabinets.
1.2 DEFINITIONS
A. GRC: Galvanized rigid steel conduit.
B. IMC: Intermediate metal conduit.
1.3 MEASUREMENT AND PAYMENT
2.1 METAL CONDUITS AND FITTINGS
A. Metal Conduit:
1. Listing and Labeling: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
2. GRC: Comply with ANSI C80.1 and UL 6.
3. IMC: Comply with ANSI C80.6 and UL 1242.
4. PVC-Coated Steel Conduit: PVC-coated rigid steel conduit or IMC.
a. Comply with NEMA RN 1.
b. Coating Thickness: 0.040 inch (1 mm), minimum.
5. EMT: Comply with ANSI C80.3 and UL 797.
6. FMC: Comply with UL 1; zinc-coated steel.
7. LFMC: Flexible steel conduit with PVC jacket and complying with UL 360.
B. Metal Fittings:
1. Comply with NEMA FB 1 and UL 514B.
2. Listing and Labeling: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533-2
3. Fittings, General: Listed and labeled for type of conduit, location, and use.
4. Coating for Fittings for PVC-Coated Conduit: Minimum thickness of 0.040 inch (1 mm), with overlapping sleeves protecting threaded joints.
2.2 NONMETALLIC CONDUITS AND FITTINGS
A. Nonmetallic Conduit:
1. Listing and Labeling: Nonmetallic conduit shall be listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
2. RNC: Type EPC-40-PVC, complying with NEMA TC 2 and UL 651 unless otherwise indicated.
3. LFNC: Comply with UL 1660.
B. Nonmetallic Fittings:
1. Fittings, General: Listed and labeled for type of conduit, location, and use.
2. Fittings for RNC: Comply with NEMA TC 3; match to conduit type and material.
a. Fittings for LFNC: Comply with UL 514B.
3. Solvents and Adhesives: As recommended by conduit manufacturer.
2.3 METAL WIREWAYS AND AUXILIARY GUTTERS
A. Description: Sheet metal, complying with UL 870 and NEMA 250, Type 1 unless otherwise indicated, and sized according to NFPA 70.
B. Fittings and Accessories: Include covers, couplings, offsets, elbows, expansion joints, adapters, hold-down straps, end caps, and other fittings to match and mate with wireways as required for complete system.
C. Wireway Covers: Screw-cover type unless otherwise indicated.
D. Finish: Manufacturer's standard enamel finish.
2.4 BOXES, ENCLOSURES, AND CABINETS
A. General Requirements for Boxes, Enclosures, and Cabinets: Boxes, enclosures, and cabinets…