Attach III- Basis of Design Drawings.pdf
PDF 512 KB Posted
- Attached to
- Z1DA--Install SCI Patient Lifts 539-26-504
- Solicitation number
- 36C25026R0070
About this file
Installation Drawing Summary
This is an installation drawing document for ceiling lift systems prepared by Arjo for a facility in Cincinnati, Ohio (VA CINCINNATI). The document contains 10 pages of detailed technical specifications, room-by-room installation layouts, and assembly requirements for ECS (Electrically Controlled System) ceiling lift track installations across five rooms (B107, B108, B112, B115, B117).
The system specifications include a 600-pound safe working load (272 kg) with an initial load test requirement at 1.5 times the SWL. All installations require a minimum concrete slab structure capacity of 4000 PSI, with ceiling mounting details showing embedment requirements and lateral bracing specifications. Key components provided by Arjo include track, brackets, shims, ceiling plates, channel nuts, bolts, washers, and wiring kits (700-11228 ECS to ECS wiring kit). The facility is responsible for removing obstructions, patching and painting walls, uninstalling existing systems, modifying door headers as needed, and verifying structural capacity. Critical notes specify that cutting of rails occurs on site only, deviations from specifications must be captured and returned to Arjo for revision, and the facility must verify building structure adequacy. Room layouts vary in dimensions and track configurations, with lateral brace requirements calculated based on track bracket joint quantities. The document requires customer approval and signature acknowledging review of all conditions and specifications prior to installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25026R0070 0001.docx | DOCX document | |
| 36C25026R0070.docx | DOCX document | |
| Attach IV- RFI.doc | DOC document | |
| Attach V - VAAR 852.219-75 VA NOTICE OF LIMITS ON SUBCONTRACTING_CERT OF COMPLIANCE JAN 2023 DEV 02.docx | DOCX document | |
| Attach II- 539-26-504 Specs Combined.pdf | ||
| Attach I -Davis Bacon Act WD OH20260082 02.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTOR :
REPRESENTATIVE :
DATE (DD-MMM-YYYY) :
REFERENCE # : PAGE :
INSTALLATION DRAWING
1. The ceiling minimum structure capacity must be able to support the load specified on the installation drawing.
2. Electrical power source outlet already available by the facility at a maximum distance of 3 meters from charging station.
3. Any obstructions such as vents, pipes, lights and sprinklers that could possibly be in the path of the ceiling lifts to be removed or relocated by the facility prior to installation.
4. Modifications of door headers by the facility.
5. Arjo reserves the right to slightly modify the track layout if necessary.
6. See the "Agreed Conditions for the Installation of Ceiling Lifts" document included with this quote for important installation details.
7. Arjo will not be held responsible for any damages, inconvenience, resulting from hitting any non visible conduits during our installation process.
8. Signed drawings are required prior to ordering and installation of ceiling lifts. This signature of each drawings confirms agreement of all the conditions listed above.
IMPORTANT NOTES
MY SIGNATURE BELOW VERIFIES THAT I HAVE:
Reviewed all ____ pages, with a total quantity of ____ rooms, for the approbation of layout for each room and the approbation of structure for each room. I verify that the answers below are accurate to the best of my knowledge and I understand that the quote produced is dependent upon the conditions below as well as this full drawing set.
· Is a load dock available? YES NO
· Can facility accept shipment and store until install begins? YES NO
· Will a drop trailer be needed? YES NO
· Is parking available on site? Is there a fee involved? YES NO
· Are there any installation time frame limitations?
What are they? YES NO
· Is a level of infectious control required? YES NO
If YES, then what level ___________________________
CUSTOMER
APPROVAL: DATE:
REVISION(S) DATE(S) (D-M-Y)
VA CINCINNATI
IR-145577
25-FEB-2026
ARJO
JIM BARTRAM
1 / 10
Legend
IV
(*) Symbol may vary depending of equipment type
Track
ServZone
Track with gate
X-Y Trolley (Suspended)
X-Y Trolley (Embedded)
Turntable (Auto/Manual)
Track with gate reverse
Wall post
Wall bracket
Wall post side
Track with service zone
Track with wall fixation
Track with T-junction
Exchanger
Swivel pole
IV track
Curtain track
Sprinkler
Smoke detector
Electrical outlet
Ceiling light
Ceiling vent
Access trap required
Existing access trap
Additional items
Motor/charger location
SPRINKLER SHIM
ECS-CSTAT
X-Y alim. type + options
VA CINCINNATI 3200 VINE ST CINCINNATI, OH 45220
H
H
105"H140
ECS-ECS
10"
5"
13"
12" 90" 18"
120"
NOTE
UNINSTALL EXISTING LIKO LINEAR WALL
POST SYSTEM.
INSTALL NEW ARJO XY ECS
NEW OUTLET
VA RESPONSIBLE
PATCH AND PAINT WALLS
LISTING OF ROOM NUMBER(S):
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SWL WORKING LOAD BELOW LIFT:
INITIAL LOAD TEST TO BE DONE @ SWL x 1.5
VA CINCINNATI
IR-145577
25-FEB-2026
un001629 1/4" = 1'
2 / 10
600LB [272KG]
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
B D
27.6 MPA [4000 PSI] MIN.
A
TILE
B107
A=96"
B=43"
D=6" ECS SYSTEM
NOTE: ATTENTION INSTALLERS
*****Any deviation/changes from the Arjo specified installation details i.e. hardware, bracing, track layout
MUST be captured, marked on the drawings and returned to Arjo for an as built revision.*****
NOTE
UNINSTALL EXISTING LIKO LINEAR WALL
POST SYSTEM.
INSTALL NEW ARJO XY ECS
NEW OUTLET
VA RESPONSIBLE
PATCH AND PAINT WALLS
118"H90
118"H90
H
E C
S E
C S
79"H90
79"H90
25"
6"
228"
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SWL WORKING LOAD BELOW LIFT:
INITIAL LOAD TEST TO BE DONE @ SWL x 1.5
VA CINCINNATI
IR-145577
25-FEB-2026
un001629 1/4" = 1'
3 / 10
600LB [272KG]
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
B D
27.6 MPA [4000 PSI] MIN.
A
TILE
B112
A=96"
B=43"
D=6" ECS SYSTEM
NOTE: ATTENTION INSTALLERS
*****Any deviation/changes from the Arjo specified installation details i.e. hardware, bracing, track layout
CURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAIN
H
H
105"H140
ECS-ECS
5"
13"
10"
12"90"18"
NOTE
INSTALL NEW ARJO XY ECS
INSTALL NEW OUTLET
VA RESPONSIBLE
NONE
120"
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SWL WORKING LOAD BELOW LIFT:
INITIAL LOAD TEST TO BE DONE @ SWL x 1.5
VA CINCINNATI
IR-145577
25-FEB-2026
un001629 1/4" = 1'
4 / 10
600LB [272KG]
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
B D
27.6 MPA [4000 PSI] MIN.
A
TILE
B108
A=96"
B=43"
D=6" ECS SYSTEM
NOTE: ATTENTION INSTALLERS
*****Any deviation/changes from the Arjo specified installation details i.e. hardware, bracing, track layout
UNINSTALL EXISTING LIKO XY WALL POST
SYSTEM.
INSTALL NEW ARJO XY ECS
EXISTING NEW OUTLET
EXTENSION DC CORD
VA RESPONSIBLE
PATCH AND PAINT WALLS
CURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAINCURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
CURTAIN
118"H90
118"H90
H
E C
S E
C S
68"H90
68"H90
6"
216"
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SWL WORKING LOAD BELOW LIFT:
INITIAL LOAD TEST TO BE DONE @ SWL x 1.5
VA CINCINNATI
IR-145577
25-FEB-2026
un001629 1/4" = 1'
5 / 10
600LB [272KG]
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
B D
27.6 MPA [4000 PSI] MIN.
A
TILE
B117
A=96"
B=43"
D=6" ECS SYSTEM
NOTE: ATTENTION INSTALLERS
*****Any deviation/changes from the Arjo specified installation details i.e. hardware, bracing, track layout
UNINSTALL EXISTING LIKO XY WALL POST
SYSTEM.
INSTALL NEW ARJO XY ECS
NEW OUTLET
VA RESPONSIBLE
PATCH AND PAINT WALLS
118"H90
118"H90
H
E C
S E
C S
68"H90
68"H90
6"
24"
216"
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SWL WORKING LOAD BELOW LIFT:
INITIAL LOAD TEST TO BE DONE @ SWL x 1.5
VA CINCINNATI
IR-145577
25-FEB-2026
un001629 1/4" = 1'
6 / 10
600LB [272KG]
LISTING OF ROOM NUMBER(S):
THIS LAYOUT HAS BEEN PREPARED WITH SUPPLIED DATA. NOTE: CUTTING OF RAILS ON SITE ONLY
B D
27.6 MPA [4000 PSI] MIN.
A
TILE
B115
A=96"
B=43"
D=6" ECS SYSTEM
NOTE: ATTENTION INSTALLERS
*****Any deviation/changes from the Arjo specified installation details i.e. hardware, bracing, track layout
LIFT CAPACITY= 600 LBS
LIFT TRACK BY
ARJO
" MAX. DISTANCE
BETWEEN ANGLE
FITTING AND CEILING
14" MAX
10" MIN
EXISTING CONCRETE
SLAB MIN 3 1/8"
EQUAL +2" OF
CENTERLINE
OF STRUT
2 7 9 11
BRACE
"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE
CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE
ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."
" NOMINAL
EMBEDMENT TYP.
121212
(X2) UPPER AND LOWER
CONNECTION FOR LATERAL
STANDARD TRACK INSTALLATION
L
U
S
P
T
M
A
X
U
N
I
S
T
R
U
P
M
X
***NOTE
EVERYTHING HIGHLIGHTED IN
BLUE IS PROVIDED BY ARJO AND
INSTALLED BY ARJO.****
FINISHED TILE CEILING
BY OTHERS
MIN 4000PSI CONCRETE SLAB STRUCTURE BY OTHERS
Item # Part # Description Qty
000.00394 THREADED ROD 3/8-16 X 10' ZINC 13
000.00402 LOCKNUT STOVER 3/8-16 ZINC 14
000.00405 NUT 3/8-16 ZINC 45
LUS-P3008 3
000.04430 FLAT WASHER M10 ZINC 5
200.11140 CEILING PLATE ø100MM 2
200.11170 BRACKET SHIM 12mm 1
000-01441 HILTI KB-TZ2 3/8 X 3 3/4 3
700.11100 TRACK BRACKET KWIKTRAK 1
LUS-P1068 UNISTRUT ANGLE 2
000.04435 TAB WASHER M10 1
1-5/8 x 10' SLOTTED CHANNEL
000.00425 LOCKWASHER 3/8" 4
000.04875 FLAT WASHER M12 4
16 LUS-P1000T
20"
200.11160
200.11150
BRACKET SHIM 3mm
BRACKET SHIM 1.5mm
000.00375 BOLT 3/8" - 16 X 1 1/4 "
LUS-P1063 1
UNISTRUT SQUARE PLATE
CHANNEL NUT W/O SPRING 3/8"-16
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SWL WORKING LOAD BELOW LIFT:
INITIAL LOAD TEST TO BE DONE @ SWL x 1.5
VA CINCINNATI
IR-145577
25-FEB-2026
un001629 N/A
7 / 10
600LB [272KG]
900LB [408KG]
- ALL HARDWARE INCLUDED.
(ACCORDING TO STRUCTURE)
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SWL WORKING LOAD BELOW LIFT:
INITIAL LOAD TEST TO BE DONE @ SWL x 1.5
VA CINCINNATI
IR-145577
25-FEB-2026
un001629 N/A
8 / 10
600LB [272KG]
900LB [408KG]
LATERAL BRACE REQUIREMENTS REV-3
LEGEND
LATERAL
BRACE
TRACK
BRACKET
TRACK
BRACKET JOINT
4 TRACKS SECTION
3 TRACK BRACKETS JOINT
9 LATERAL BRACES
1 TRACK SECTION
0 TRACK BRACKET JOINT
3 LATERAL BRACES
2 TRACKS SECTION
1 TRACK BRACKET JOINT
4 LATERAL BRACES
3 TRACKS SECTION
2 TRACK BRACKETS JOINT
6 LATERAL BRACES
- MINIMUM 3 LATERAL BRACES.
- NUMBER OF LATERAL BRACE = (NUMBER OF TRACK BRACKET JOINT X 2) + 2.
POSSIBLE ANCHOR LATERAL TO THE CEILING OR TO THE WALL
ACCEPTABLE ANGLE
LATERAL BRACE
LUS-P1000T
FLAT WASHER M12
000.04875
CONCRETE
HILTI KBTZ2 3/8 X 3 3/4
000-01441
BELOW CEILING TRACK
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SWL WORKING LOAD BELOW LIFT:
INITIAL LOAD TEST TO BE DONE @ SWL x 1.5
VA CINCINNATI
IR-145577
25-FEB-2026
un001629 N/A
9 / 10
600LB [272KG]
900LB [408KG]
MAX. STRUT BRIDGE "SPAN"
STRUT
LIFT CAPACITY
P1000T
P1000
P5500T
P5500
P5501
P5001
P1001
P5000
600#
1'-8"
2'-0"
3'-3"
4'-0"
5'-4"
4'-10"
8'-6"
10'-4"
STRUT BRIDGE PER TABLE
BELOW (SLOT- FACE DOWN)
"SPAN"
REF. TABLE BELOW
DUCT, PIPE
OR OTHER
OBSTRUCTION
AS OCCURS
STRUT TO BUILDING STRUCTURE
REF. PLANS AND DETAILS
B
R
A
C
E
O
S
R
U
C
T
U
R
E
R
E
F
P
L
A
N
S
N
D
D
E
T
A
I
L
S
BRIDGE DETAIL
Item # Part # Description Qty
000.00394 THREADED ROD 3/8-16 X 10' ZINC 21
000.00405 NUT 3/8-16 ZINC 6
TYP. ROD
HANGER PER
PLANS AND
DETAILS
SQUARE PLATE 3/8"
"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE
CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE
ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."
LUS-P3008 CHANNEL NUT W/O SPRING 3/8 23
VERIFY IN FIELD
LUS-P1063
QUANTITY OF ROOMS:
DRAWN BY :
REFERENCE # : PAGE :
SCALE :
DATE CREATED (DD-MMM-YYYY) :
SWL WORKING LOAD BELOW LIFT:
INITIAL LOAD TEST TO BE DONE @ SWL x 1.5
VA CINCINNATI
IR-145577
25-FEB-2026
un001629 N/A
10 / 10
Z
600LB [272KG]
900LB [408KG]
EMBEDDED X-Y CONFIG.
700-11228 - ECS to ECS wiring kit
FLUSH X-Y CONFIG.
STANDARD X-Y CONFIG.
WALL MOUNTED X-Y CONFIG.
ECS - ECS CHARGING
CONTACT BOX (3X)
ECS ON FIXED RAIL
ECS ON MOVING RAIL
V5 Duo
MS600 ecs
MS2 ecs
MS440
V5 Duo
MS600 ecs
MS2 ecs
MS440
V5 Duo
MS600 ecs
MS2 ecs
MS440
V5 Duo
MS600 ecs
MS2 ecs
MS440
| Sheets and Views |
| IR-145577 Va Cincinnati-Title |
| IR-145577 Va Cincinnati-02 |
| IR-145577 Va Cincinnati-03 |
| IR-145577 Va Cincinnati-04 |
| IR-145577 Va Cincinnati-05 |
| IR-145577 Va Cincinnati-06 |
| IR-145577 Va Cincinnati-X-31210.01-S1 |
| IR-145577 Va Cincinnati-X-31210.01-LateralUS |
| IR-145577 Va Cincinnati-X-31210.01-LateralUS (2) |
| IR-145577 Va Cincinnati-X-BB-BD-ECS.ECS-X-ECS-ECS |
File details come from the government source that posted it. Updated .