Attach II Price Proposal Breakdown Form.xlsx

XLSX spreadsheet 445 KB Posted

Attached to
USS BLUE RIDGE (LCC19) 5C1 CNO DSRA TYCOM BUNDLE 2 (Yokosuka, Japan)
Solicitation number
N6264925RA022
Issued by

About this file

The file is an Excel spreadsheet titled "Attach II Price Proposal Breakdown Form" associated with a naval vessel maintenance solicitation for USS BLUE RIDGE (LCC19) at Yokosuka, Japan. The solicitation (N6264925RA022) is issued by the Department of the Navy Naval Supply Systems Command and is specifically intended for authorized sources operating in Japan, as indicated by DFARS 225.1103(3) restrictions.

While the provided excerpt does not reveal the specific contents of the Excel spreadsheet, the filename suggests it is a pricing proposal template that contractors would use to detail their cost breakdown for the naval vessel's 5C1 CNO Depot Shipyard Repair Availability (DSRA) TYCOM Bundle 2 maintenance work. The solicitation appears to be seeking comprehensive maintenance and repair services for the USS BLUE RIDGE, with specific geographical constraints limiting bidders to those authorized to conduct business in Japan.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264925RAXXXCLIN 0001(61 TGIs)0¥0¥0¥0¥0
SHIP NAME:USS BLUE RIDGE (LCC-19)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)61Total Evaluated Price¥0
Growth CLIN %14.18%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
13819P11001A01Accomplish Inspection, Repair, and Preservation for Underwater Hull and Freeboard000¥0¥0¥0¥0
23819P12363A01Clean, Inspect, Repair, and Preserve Void (9-133-0-V)000¥0¥0¥0¥0
33819P12366A01Clean, Inspect, Repair, and Preserve Void (5-52-1-V)000¥0¥0¥0¥0
43819P12367A01Clean, Inspect, Repair, and Preserve Void (5-52-2-V)000¥0¥0¥0¥0
53819P12368A01Clean, Inspect, Repair, and Preserve Void (5-79-1-V)000¥0¥0¥0¥0
63819P12369A01Clean, Inspect, Repair, and Preserve Void (5-79-4-V)000¥0¥0¥0¥0
73819P12370A01Clean, Inspect, Repair, and Preserve Void (5-94-2-V)000¥0¥0¥0¥0
83819P12371A01Clean, Inspect, Repair, and Preserve Void (5-94-1-V)000¥0¥0¥0¥0
93819P12372A01Clean, Inspect, Repair, and Preserve Void (5-98-1-V)000¥0¥0¥0¥0
103819P12373A01Clean, Inspect, Repair, and Preserve Void (5-98-4-V)000¥0¥0¥0¥0
113819P12374A01Clean, Inspect, Repair, and Preserve Void (5-147-0-V)000¥0¥0¥0¥0
123819P12375A01Clean, Inspect, Repair, and Preserve Void (4-31-2-V)000¥0¥0¥0¥0
133819P12376A01Clean, Inspect, Repair, and Preserve Void (4-40-1-V)000¥0¥0¥0¥0
143819P12377A01Clean, Inspect, Repair, and Preserve Void (4-40-2-V)000¥0¥0¥0¥0
153819P12378A01Clean, Inspect, Repair, and Preserve Void (4-76-7-V)000¥0¥0¥0¥0
163819P12379A01Clean, Inspect, Repair, and Preserve Void (4-76-8-V)000¥0¥0¥0¥0
173819P12380A01Clean, Inspect, Repair, and Preserve Void (4-83-3-V)000¥0¥0¥0¥0
183819P12381A01Clean, Inspect, Repair, and Preserve Void (4-86-4-V)000¥0¥0¥0¥0
193819P12382A01Clean, Inspect, Repair, and Preserve Void (4-109-10-V)000¥0¥0¥0¥0
203819P12383A01Clean, Inspect, Repair, and Preserve Void (2-31-1-V)000¥0¥0¥0¥0
213819P12384A01Clean, Inspect, Repair, and Preserve Void (2-31-2-V)000¥0¥0¥0¥0
223819P12385A01Clean, Inspect, Repair, and Preserve Void (4-83-2-V)000¥0¥0¥0¥0
233819P12386A01Remove Desiccant and Mounting Hanger in 4-35-2-V000¥0¥0¥0¥0
243819P13203A01Repair Line Hand Port and Structural Member in 2-F-0-Q000¥0¥0¥0¥0
253819P13205A01Repair Structural Member in 2-109-3-Q000¥0¥0¥0¥0
263819P13205T01Tightness & Operational Test for Potable Water System000¥0¥0¥0¥0
273819P13205T02Tightness & Operational Test for Sewage System000¥0¥0¥0¥0
283819P13213A01Repair Structural Member in 2-52-7-Q000¥0¥0¥0¥0
293819P13213T01Tightness & Operational Test for Potable Water System000¥0¥0¥0¥0
303819P13303A01Repair and Preserve Fan Room 3-131-3-Q000¥0¥0¥0¥0
313819P13307A01Repair Incompleted Weld and Stuffing Tube in 3-D-0-A000¥0¥0¥0¥0
323819P13311A01Repair Structural Member and Stuffing Tube in 3-143-0-Q, and Platform in Aft Close In Weapon System (CIWS) Sponson, Starboard (Stbd)000¥0¥0¥0¥0
333819P13347A01Repair Longitudinal No. 19S in 3-14-1-Q000¥0¥0¥0¥0
343819P13405A01Repair Structural Member in 4-94-2-Q000¥0¥0¥0¥0
353819P13406A01Preserve and Repair Structural Member in 4-52-5-Q000¥0¥0¥0¥0
363819P13407A01Repair and Preserve Structural Member, and Line Handling Port and Interior Surface000¥0¥0¥0¥0
373819P13504A01Repair Transverse Bulkhead Plate Frame 64 in 5-58-2-L000¥0¥0¥0¥0
383819P13504T01Tightness & Operational Test for Sewage System000¥0¥0¥0¥0
393819P14101A02Repair Intercostal Stiffener in 6-12-0-K000¥0¥0¥0¥0
403819P14102A01Accomplish Repair of Vertical Stiffener and Preservation of First Platform Plating in 6-18-0-A000¥0¥0¥0¥0
413819P14105A01Repair Shell Plating in 6-40-0-A and 7-48-0-A000¥0¥0¥0¥0
423819P14109A01Accomplish Repair of Deck Plate and Preservation of Deck and Web Plate of Stringer and Longitudinal IN 6-52-4-L000¥0¥0¥0¥0
433819P14201A01Repair Structural Member in 7-40-0-E000¥0¥0¥0¥0
443819P14201T01Rotation Check for A/C Plant #2000¥0¥0¥0¥0
453819P14201T02Rotation Check for A/C Plant #1000¥0¥0¥0¥0
463819P14201T03Operational Test for A/C Plant #2000¥0¥0¥0¥0
473819P14201T04Operational Test for A/C Plant #1000¥0¥0¥0¥0
483819P14202A01Repair Structural Member in 7-64-2-E000¥0¥0¥0¥0
493819P14202T01Tightness & Operational Test for Potable Water System000¥0¥0¥0¥0
503819P14202T02Rotation Check for A/C Plant #3000¥0¥0¥0¥0
513819P14202T03Motor Rotation Check for A/C Plant #4000¥0¥0¥0¥0
523819P14202T04Operational Test for A/C Plant #3000¥0¥0¥0¥0
533819P14202T05Operational Test for A/C Plant #4000¥0¥0¥0¥0
543819P14209A01Accomplish Repair Vertical Stiffener and Preservation Second Platform Plating in 7-12-0-K000¥0¥0¥0¥0
553819P14216A01Replace Seawater Overboard Discharge Piping000¥0¥0¥0¥0
563819P14216T01Tightness & Operational Test for AUX Seawater System000¥0¥0¥0¥0
573819P16716A01Replace Watertight Door 3-51-5000¥0¥0¥0¥0
583819P25602A01Accomplish Main Condenser Sea Water Rubber Expansion Joint Replacement000¥0¥0¥0¥0
593819P25602T01Tightness & Operational Test for Circulating/Cooling Sea Water System000¥0¥0¥0¥0
603819P58202A01Replace All Chock Cover Assembly in Line Handling Spaces000¥0¥0¥0¥0
613819P63302A01Accomplish Visual Inspection of Component of Impressed Current Cathodic Protection System000¥0¥0¥0¥0
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

1_3819P11001A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 1_3819P11001A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:1_3819P11001A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Accomplish Inspection, Repair, and Preservation for Underwater Hull and Freeboard00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.8
5.9
5.10
5.11
5.12
5.13
5.14
5.15
5.16
5.17
5.180.0
5.190.0
5.200.0
5.210.0
5.220.0
5.230.0
TOTAL IN-HOUSE M/Hs0.00.00.00.00.00.00.00.00.00.00.0
KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.900
5.1000
5.1100
5.1200
5.1300
5.1400
5.1500
5.1600
5.1700
5.1800
5.19000
5.20000
5.21000
5.22000
5.23000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

2_3819P12363A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 2_3819P12363A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:2_3819P12363A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (9-133-0-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
5.9000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

3_3819P12366A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 3_3819P12366A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:3_3819P12366A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (5-52-1-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

4_3819P12367A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 4_3819P12367A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:4_3819P12367A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (5-52-2-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

5_3819P12368A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 5_3819P12368A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:5_3819P12368A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (5-79-1-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

6_3819P12369A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 6_3819P12369A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:6_3819P12369A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (5-79-4-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

7_3819P12370A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 7_3819P12370A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:7_3819P12370A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (5-94-2-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

8_3819P12371A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 8_3819P12371A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:8_3819P12371A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (5-94-1-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

9_3819P12372A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 9_3819P12372A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:9_3819P12372A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (5-98-1-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

10_3819P12373A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 10_3819P12373A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:10_3819P12373A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (5-98-4-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

11_3819P12374A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 11_3819P12374A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:11_3819P12374A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (5-147-0-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

12_3819P12375A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 12_3819P12375A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:12_3819P12375A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (4-31-2-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

13_3819P12376A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 13_3819P12376A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:13_3819P12376A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (4-40-1-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

14_3819P12377A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 14_3819P12377A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:14_3819P12377A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (4-40-2-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

15_3819P12378A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 15_3819P12378A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:15_3819P12378A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (4-76-7-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

16_3819P12379A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 16_3819P12379A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:16_3819P12379A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (4-76-8-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

17_3819P12380A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 17_3819P12380A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:17_3819P12380A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (4-83-3-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

18_3819P12381A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 18_3819P12381A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:18_3819P12381A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (4-86-4-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

19_3819P12382A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 19_3819P12382A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:19_3819P12382A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (4-109-10-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

20_3819P12383A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 20_3819P12383A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:20_3819P12383A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (2-31-1-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

21_3819P12384A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 21_3819P12384A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:21_3819P12384A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (2-31-2-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

22_3819P12385A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 22_3819P12385A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:22_3819P12385A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Clean, Inspect, Repair, and Preserve Void (4-83-2-V)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

5.1000
5.2000
5.3000
5.4000
5.5000
5.6000
5.7000
5.8000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

23_3819P12386A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 23_3819P12386A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:23_3819P12386A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Remove Desiccant and Mounting Hanger in 4-35-2-V00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
2.10.0
2.20.0
2.30.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

2.1000
2.2000
2.3000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

24_3819P13203A01

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 5C1 Docking-Selected Restricted Availability (DSRA) TYCOM 2TGI 24_3819P13203A01 SUMMARY
SOLICITATION #:N6264925RAXXX
SRF-JRMC TGI #:24_3819P13203A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Repair Line Hand Port and Structural Member in 2-F-0-Q00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
5.10.0
5.20.0
5.30.0
5.40.0
5.50.0
5.60.0
5.70.0
5.80.0
5.90.0
5.100.0
5.110.0

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .