BID DOCUMENTS SUMMARY

These are 100% bid documents for the "Replace USTs and Leak Detection System Phase 2" project at the Fargo VA Health Care System, Department of Veterans Affairs, located at 2101 Elm Street, Fargo, North Dakota 58102. Project number 437-24-101 is designed by Four-Front Design Inc. with consultants including MBN Engineering and Enviros. The designer of record is RAYMOND DAWES, PE-9846, with an issue date of August 28, 2025.

The project scope encompasses demolition and replacement of multiple underground storage tanks (USTs) and aboveground storage tanks (ASTs) containing heating oil and diesel fuel for facility operations and emergency generators. Specifically, the work includes: removal and replacement of three 20,000-gallon heating oil USTs (UST 1, 2, 3); removal and replacement of one 4,000-gallon diesel fuel UST (UST 4); removal and replacement of one 4,000-gallon diesel fuel UST (UST 8); removal and replacement of three ASTs (75-200 gallons each) serving generator fuel needs; installation of new fuel clarifiers (CL1-CL4); replacement of monitoring and leak detection panels and sensors; installation of cathodic protection systems for applicable tanks; and associated fuel oil piping, vent piping, and electrical connections. The project also includes site work such as pavement removal/replacement, grading, erosion control, utility coordination, retaining wall reconstruction, and sidewalk installation. Contractor responsibilities include phased tank replacement to maintain operational continuity, temporary above-ground storage, fuel transfer coordination with facility operations, environmental remediation of contaminated soils at the UST 1, 2, 3 location per regulatory guidance, and integration of new monitoring systems into the existing building automation system via MODBUS protocol. The documents provide detailed mechanical, electrical, and civil construction plans, equipment schedules, and coordination requirements across multiple buildings and underground tank locations.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--437-24-101, Replace UST's & Leak Detection System, newest first.
File Type Posted
Attach B - Questions Request Form - 1 page.pdf PDF
Attach C- WRD ND last updated 1.30.26.pdf PDF
Attach E- Specs Fargo-Replace UST and Leak Detection 16 Jan. 26 fix.pdf PDF
Attach D - VAAR 852.219-75 Limitations on Subcontracting-Cert of Compliance_JAN 2023 [D.pdf PDF
attach G- Cost-Free Design Analysis.pdf PDF
Attach A SOW final.pdf PDF
S06 Amendment 1 attachments.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G-0.0008/28/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Replace USTs and Leak Detection System Phase 2

437-24-101

Project Director

08/28/2025Revisions: Date:

2101 ELM STREET, FARGO, ND 58102

100% BID DOCUMENTS

DESIGNER OF RECORDCONSULTANT

PROTECTION ENGINEERING CONSULTANTS (PEC)

100 CREEK ROAD, SUITE 102

DRIPPING SPRINGS, TX 78620

PH: (512) 380-1988

WESTERN WATER CONSULTANTS (WWC)

1275 MAPLE STREET, SUITE F

HELENA, MT 59601

PH: (406) 443-3962

MBN

503 7TH STREET, SUITE 200

FARGO, ND 58102

PH: (701) 478-6336

ENVIROS

220 RAMSEY STREET

HASTINGS, MN 55033

PH: (651) 319-0170

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M21

PM TK

ESSF IOO NRP ALD EE NR GET INSI EG E

E R

R

RAYMOND

DAWES

PE-9846

DATE

REPLACE UST & LEAK DETECTION PHASE II

PROJECT NO. 437-24-101

FARGO VA HEALTH CARE SYSTEM

DEPARTMENT OF VETERANS AFFAIRS

2101 ELM STREET

FARGO, NORTH DAKOTA 58102

VA U.S DEPARTMENT OF VETERANS AFFAIRS

VETERANS HEALTH ADMINISTRATION

SHEET INDEX

SHEET # SHEET TITLE

G-0.00 COVER PAGE

M-0.00 MECHANICAL COVER SHEET

M-0.10 SITE PLAN

M-0.20 MECHANICAL SCHEDULES & DETAILS

MD-1.03 ABOVEGROUND STORAGE TANKS 4 & 5 DEMOLITION PLAN

M-1.00 UNDERGROUND STORAGE TANKS 1, 2 & 3 NEW PLAN

M-1.01 UNDERGROUND STORAGE TANK 4 NEW PLAN

M-1.02 UNDERGROUND STORAGE TANK 8 & AST 3 NEW PLAN

M-1.03 ABOVEGROUND STORAGE TANKS 4 & 5 NEW PLAN

MD-1.00 UNDERGROUND STORAGE TANKS 1, 2 & 3 DEMOLITION PLAN

MD-1.01 UNDERGROUND STORAGE TANK 4 DEMOLITION PLAN

MD-1.02 UNDERGROUND STORAGE TANK 8 & AST 3 DEMOLITION PLAN

COVER PAGE

C-1.0 EXISTING CONDITIONS / DEMOLITION PLAN

C-5.0 DETAILS

E-0.0 ELECTRICAL LEGENDS AND ABBREVIATIONS

E-1.0 ELECTRICAL FLOOR PLAN

E-1.1 UST 6 AND 8 ELECTRICAL FLOOR PLAN DETAILS

E-1.2 UST 9 AND 10 ELECTRICAL FLOOR PLAN DETAILS

E-1.3 BOILER PLANT ELECTRICAL FLOOR PLAN DETAILS

G-1.00 PCRA PLAN

C-2.0 EROSION CONTROL / UTILITY PLAN

C-3.0 GRADING PLAN

C-4.0 PAVING PLAN

G-0.02 LOCATION MAP AND CONTRACTOR STAGING PLAN

M-0.30 MECHANICAL DETAILS

E-0.1 ELECTRICAL SCHEDULES AND DETAILS

E-1.4 CATHODIC PROTECTION

S-1.00 RETAINING WALL AND SIDEWALK PLANS

G-2.00 UST 1, 2 & 3 CONTAMINATION AREA PLAN & PROFILE

SHARED

CONTRACTOR

STAGING

LEGEND:

CONTRACTOR STAGING AREA

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Phase

ARCHITECT/ENGINEER OF RECORD:

U.S. Department of Veterans Affairs

STAMP:

BID DOCUMENTS

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M21

DES IGN INC

/2

/2

:3

:0

P

M

08/28/2025

LOCATION MAP AND CONTRACTOR

STAGING

G-0.02

Replace USTs and Leak Detection System Phase 2

KZRD

2101 ELM STREET, FARGO, ND 58102

Owner

437-24-101

100% BID DOCUMENTS

1 1/2" = 1'-0"

LOCATION MAP AND CONTRACTOR STAGING PLAN

08/28/2025

ESSF IOO NRP ALD EE NR GET INSI EG E

E R

R

RAYMOND

DAWES

PE-9846

DATE

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Phase

ARCHITECT/ENGINEER OF RECORD:

U.S. Department of Veterans Affairs

STAMP:

BID DOCUMENTS

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M21

DES IGN INC

/2

/2

:3

:0

P

M

08/28/2025

PCRA PLAN

G-1.00

Replace USTs and Leak Detection System Phase 2

KZRD

2101 ELM STREET, FARGO, ND 58102

Owner

437-24-101

100% BID DOCUMENTS

08/28/2025

ESSF IOO NRP ALD EE NR GET INSI EG E

E R

R

RAYMOND

DAWES

SS

SS

S S

S S

S S

W W

W W

W W

W W

U G

P

UGP

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP

U G

P U

G P

U G

P U

G P

U G

P U

G P

U G

P U

G P

U G

P

U G

P U

G P

U G

P U

G P

U G

P U

G P

U G

P U

G P

U G

P

ST ST ST

ST

ST

ST

ST

ST

ST

0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+800+80

B-05

50'-6"

60'-6"EXISTING UST #3

(TO BE REMOVED)

EXISTING UST #2

(TO BE REMOVED)

EXISTING UST #1

(TO BE REMOVED)

ESTIMATED AREA OF CONTAMINATION.

CONTRACTOR SHALL FIELD VERIFY.

B-03

B-06

SAWCUT ASPHALT PRIOR TO REMOVAL

12'

10'-6"

ESTIMATED EXTENTS OF EXCAVATION.

CONTRACTOR TO FIELD VERIFY.

EXISTING 6" PVC WATER LINE

(ELEVATION UNKNOWN, TO REMAIN)

ESTIMATED LOCATION OF

EXISTING 15" STORM

PIPE (TO REMAIN)

ESTIMATED AREA OF CONTAMINATION.

CONTRACTOR SHALL FIELD VERIFY.

BOTTOM OF EXISTING ASPHALT (APPROXIMATE)

EXISTING GRADE

EXISTING UST #2 (TO

BE REMOVED. SIZE

APPROXIMATE.)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

Replace USTs and Leak Detection System Phase 2

437-24-101

Project Director

08/28/2025 STH/KJG JDFRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

100% BID DOCUMENTS

DESIGNER OF RECORDCONSULTANT

PROTECTION ENGINEERING CONSULTANTS (PEC)

100 CREEK ROAD, SUITE 102

DRIPPING SPRINGS, TX 78620

PH: (512) 380-1988

WESTERN WATER CONSULTANTS (WWC)

1275 MAPLE STREET, SUITE F

HELENA, MT 59601

PH: (406) 443-3962

MBN

503 7TH STREET, SUITE 200

FARGO, ND 58102

PH: (701) 478-6336

ENVIROS

220 RAMSEY STREET

HASTINGS, MN 55033

PH: (651) 319-0170

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M21

G-2.00

UST 1, 2 & 3 CONTAMINATION

AREA PLAN & PROFILE

GENERAL NOTES - CONTAMINATED SOIL REMOVAL

1. CONTRACTOR SHALL NOTIFY THE NDDEQ AND EPA REGION 8 AT LEAST 30 DAYS PRIOR TO

COMMENCEMENT OF UST CLOSURE AND CONTAMINATED SOIL REMOVAL ACTIVITIES.

2. CONTRACTOR SHALL COORDINATE ALL UTILITY LOCATES (811 AND PRIVATE LOCATE SERVICES) PRIOR TO

EXCAVATION.

3. CONTRACTOR SHALL IMPLEMENT THEIR SITE-SPECIFIC HEALTH AND SAFETY PLAN (HASP), INCLUDING AIR MONITORING AND REQUIRED PERSONAL PROTECTIVE EQUIPMENT (PPE) DURING EXCAVATION AND

HANDLING OF PETROLEUM-CONTAMINATED MATERIALS.

4. THE CONTRACTOR SHALL DEVELOP AND SUBMIT A CONTAMINATED SOIL MANAGEMENT PLAN TO THE VA

PROJECT MANAGER FOR APPROVAL PRIOR TO START OF REMOVAL WORK.

EXCAVATION AND CONTAMINATED SOIL REMOVAL NOTES

5. EXCAVATE PETROLEUM-IMPACTED SOIL IN THE AREA AROUND BORING B-06 TO A MINIMUM DEPTH OF 2 FEET BELOW GROUND SURFACE (BGS) OR UNTIL CLEAN LIMITS ARE CONFIRMED THROUGH FIELD

SCREENING AND LABORATORY ANALYSIS.

6. SCREEN EXCAVATED SOILS WITH A PHOTOIONIZATION DETECTOR (PID) AND SUBMIT CONFIRMATION SAMPLES TO A CERTIFIED LABORATORY FOR ANALYSIS OF TPH-DRO, BTEX, AND NAPHTHALENE.

7. EXTEND EXCAVATION AS NECESSARY IF PETROLEUM CONTAMINATION IS ENCOUNTERED BEYOND INITIAL

EXCAVATION DEPTHS.

8. IMPLEMENT DUST CONTROL AND VAPOR MITIGATION MEASURES, INCLUDING WATER SPRAYING AND

PLASTIC COVERINGS, AS NEEDED DURING EXCAVATION.

CONTAMINATED SOIL HANDLING AND DISPOSAL NOTES

9. PLACE CONTAMINATED SOILS ON A 6-MIL MINIMUM IMPERMEABLE LINER AND COVER WITH SECURED

TARPAULIN IF IMMEDIATE OFF-SITE TRANSPORT IS NOT POSSIBLE.

10. INSTALL SILT FENCE OR EQUIVALENT EROSION CONTROL AROUND ALL CONTAMINATED SOIL

STOCKPILES.

11. ALL PETROLEUM-CONTAMINATED SOILS EXCEEDING 100 MG/KG TPH SHALL BE TRANSPORTED TO A

NDDEQ-APPROVED LANDFILL OR PERMITTED LANDFARM FOR TREATMENT OR DISPOSAL.

12. CONTRACTOR SHALL PROVIDE MANIFESTS, RECEIPTS, AND CERTIFICATES OF DISPOSAL FOR ALL

CONTAMINATED MATERIALS REMOVED FROM SITE.

TANK AND PIPING REMOVAL COORDINATION NOTES

13. REMOVE USTS AND ASSOCIATED PIPING PER EPA 40 CFR PART 280 REQUIREMENTS.

14. ENSURE TANKS AND PIPING ARE CLEANED OF RESIDUAL PRODUCT PRIOR TO REMOVAL AND OFF-SITE

TRANSPORT.

15. PREVENT PRODUCT RELEASE DURING REMOVAL. CAP AND SECURE ALL OPEN LINES AND CONNECTIONS.

SAMPLING, BACKFILL, AND RESTORATION NOTES

16. CONDUCT CONFIRMATION SAMPLING AT THE FLOOR AND SIDEWALLS OF THE EXCAVATION AFTER REMOVAL OF CONTAMINATED MATERIALS. DO NOT BACKFILL UNTIL APPROVAL IS RECEIVED FROM THE VA

PROJECT MANAGER BASED ON SAMPLING RESULTS.

17. BACKFILL EXCAVATIONS WITH CLEAN, TESTED FILL MATERIAL AND COMPACT PER PROJECT

SPECIFICATIONS.

18. RESTORE DISTURBED AREAS TO ORIGINAL GRADES AND CONDITIONS UNLESS OTHERWISE NOTED ON

DRAWINGS.

REPORTING AND DOCUMENTATION NOTES

19. MAINTAIN DAILY LOGS DOCUMENTING EXCAVATION ACTIVITIES, SCREENING RESULTS, SOIL HANDLING, WEATHER CONDITIONS, AND ANY UNEXPECTED CONDITIONS ENCOUNTERED.

20. SUBMIT A CLOSURE REPORT TO THE VA PROJECT MANAGER INCLUDING FIELD DATA, ANALYTICAL

RESULTS, DISPOSAL MANIFESTS, AND A SUMMARY OF REMEDIATION ACTIVITIES.

NOTE: CONTRACTOR SHALL EXCAVATE PETROLEUM-CONTAMINATED SOILS AS SHOWN AND DESCRIBED IN THE REMEDIAL ACTION PLAN AND SITE ASSESSMENT REPORT (AET PROJECT NO. P-0040293). COORDINATE SOIL SCREENING, SAMPLING, AND DISPOSAL WITH VA REPRESENTATIVE. MAINTAIN REGULATORY

COMPLIANCE WITH NDDEQ AND EPA REGION 8 THROUGHOUT WORK EXECUTION.

3/16" = 1'-0"1 UNDERGROUND STORAGE TANKS 1, 2 & 3 CONTAMINATION AREA PLAN & PROFILE

8/28/2025

D

REMOVE EXISTING UST#4 -

4,000 GALLONS

CONTRACTOR TO PUMP AND STORE

EXISTING FUEL FOR REUSE.

REMOVAL TO BE PHASED TO

PROVIDE CONTINUED OPERATION

DURING REPLACEMENT.

(COORDINATE W/ OWNER)

(FOR DETAILS SEE MECH. PLAN)

BLDG 10

BOILER PLANT

BLDG 50

COLD STORAGE

REMOVE EXISTING UST#1,2,3 - 20,000 GALLONS (EACH TANK)

CONTRACTOR TO PUMP AND STORE EXISTING FUEL FOR REUSE.

REMOVAL TO BE PHASED TO PROVIDE CONTINUED OPERATION

DURING REPLACEMENT. (COORDINATE W/ VA AND CONSULTANT)

CONTRACTOR SHALL PROVIDE ALL SHORING AND BRACING TO

PROTECT ADJACENT FACILITIES AND UTILITIES. CONTRACTOR

SHALL PREPARE AND PROVIDE ALL ENGINEERED DRAWINGS AND

EXCAVATION PLANS FOR APPROVAL BY THE VA AND CONSULTANT.

(SEE MECH. FOR DETAILS)

REMOVE CONCRETE

COLLAR

34.0'

50.5'

10.0'

REMOVE AND REPLACE

BOLLARDS AND GATE AS

NEEDED FOR PLACEMENT OF

TANK AND PAVEMENT REMOVAL

NOTE:

SOIL BORINGS INDICATED PRESENCE OF

CONTAMINATED SOILS ADJACENT TO THE

EXISTING UST#1,2 & 3 TANKS. REFER TO

THE GEOTECHNICAL REPORT PREPARED BY

AMERICAN ENGINEERING AND TESTING FOR

LOCATIONS AND DEPTHS.

CONTRACTOR SHALL ALSO REVIEW THE

ENVIRONMENTAL REPORT DOCUMENTS

PREPARED BY WWC ENGINEERING FOR

INFORMATION REGARDING THE REMEDIAL

ACTION PLAN TO ADDRESS THE

CONTAMINATED SOILS AND SUGGESTED

METHODS FOR REMOVAL/DISPOSAL OF THE

SOILS AND TANKS.

PROVIDE NECESSARY BRACING

FOR EXISTING UTILITIES

X

X X

X

TEMPORARY SECURITY FENCE

(FIELD VERIFY LOCATION)

XX

X X

X

X X X

TEMPORARY SECURITY FENCE

FIELD VERIFY LOCATION

D

D D

HOSPITAL

REMOVE EXISTING

FUEL OIL CAPS

REMOVE / SALVAGE

EXISTING LANDSCAPE ROCK

REMOVE EXISTING UST#8 -

4,000 GALLONS

CONTRACTOR TO PUMP AND STORE

EXISTING FUEL FOR REUSE.

REMOVAL TO BE PHASED TO

PROVIDE CONTINUED OPERATION

DURING REPLACEMENT.

(COORDINATE W/ OWNER)

(FOR DETAILS SEE MECH. PLAN)

CONTRACTOR SHALL PROVIDE ALL SHORING AND

BRACING TO PROTECT ADJACENT FACILITIES AND

UTILITIES. CONTRACTOR SHALL PREPARE AND

PROVIDE ALL ENGINEERED DRAWINGS AND EXCAVATION

FOR APPROVAL BY THE VA AND CONSULTANT.

REMOVE SIDEWALK FOR

TANK INSTALLATION

TEMPORARY SECURITY FENCE

FIELD VERIFY LOCATION

X

X X

X X

X

X

X X

X

X

SYMBOL LEGEND:

EXISTING PROPERTY LINE

EXISTING STORM SEWER LINE

EXISTING SANITARY SEWER LINE

EXISTING WATER LINE

EXISTING STORM MANHOLE

EXISTING SANITARY MANHOLE

EXISTING WATER GATE VALVE

EXISTING HYDRANT/BENCHMARK

EXISTING LIGHT POLE

EXISTING ELECTRICAL MANHOLE

EXISTING BOLLARD

EXISTING DOWNSPOUT

EXISTING DECIDUOUS TREE/SHRUB

PLAN NOTES:

EXISTING GAS LINE

EXISTING ELECTRICAL LINE

EXISTING WATER MANHOLE

EXISTING COMMUNICATIONS VAULT

EXISTING TRANSFORMER

EXISTING ELECTRICAL PEDESTAL

EXISTING CLEANOUT

EXISTING GAS METER

EXISTING SIGN

REMOVE EXISTING ASPHALT PAVEMENT

REMOVE / SALVAGE EXISTING LANDSCAPE ROCK

EXISTING STORM INLET

EXISTING FENCE

EXISTING HANDRAIL

EXISTING RETAINING WALL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Replace USTs and Leak Detection System Phase 2

437-24-101

Project Director

08/28/2025 AKE BRCRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

100% BID DOCUMENTS

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M21

PROTECTION ENGINEERING CONSULTANTS (PEC)

100 CREEK ROAD, SUITE 102

DRIPPING SPRINGS, TX 78620

PH: (512) 380-1988

WESTERN WATER CONSULTANTS (WWC)

1275 MAPLE STREET, SUITE F

HELENA, MT 59601

PH: (406) 443-3962

MBN

503 7TH STREET, SUITE 200

FARGO, ND 58102

PH: (701) 478-6336

ENVIROS

220 RAMSEY STREET

HASTINGS, MN 55033

PH: (651) 319-0170

08-28-25 C1.0

EXISTING CONDITIONS /

DEMOLITION PLAN

S

E

N

W

SCALE: 1 INCH = 20 FEET

20100 40 UST #1, #2, #3, & #4 DEMOLITION

UST #8 DEMOLITION

TEMPORARY SECURITY FENCEX

REMOVE EXISTING CONCRETE PAVEMENT

REMOVE EXISTING BOLLARD

REMOVE EXISTING FUEL OIL CAPS

BENCHMARKS:

BM-1: TOP NUT OF HYDRANT LOCATED EAST OF THE HOSPITAL AND

NORTH OF THE LOADING DOCK, +/-50' EAST OF UST #8.

ELEVATION = 893.98 (NAVD88)

BM-2: TOP NUT OF HYDRANT LOCATED SOUTH OF BUILDING #10 &

WEST OF UST #4, +/-10' SOUTH OF BUILDING #10.

ELEVATION = 901.04 (NAVD88)

1. CONTRACTOR SHALL LOCATE ALL UTILITIES PRIOR TO

CONSTRUCTION. NORTH DAKOTA ONE CALL WILL ONLY

LOCATE THEIR MAINS AND WILL NOT LOCATE PRIVATE

UTILITIES ON THIS SITE. THE VA IS NOT

RESPONSIBLE FOR LOCATING ANY ON SITE UTILITIES.

REFER TO CD102, CU101, AND SITE ELECTRICAL PLANS

FOR EXISTING/PROPOSED UTILITY LOCATIONS.

2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND

ELEVATION OF ALL EXISTING/PROPOSED UTILITY

CROSSINGS, AND WHERE EXISTING UTILITIES CONNECT

INTO NEW UTILITY MAINS.

3. ALL PAVEMENT MARKED FOR DEMOLITION SHALL BE FULL

DEPTH SAW CUT PRIOR TO REMOVAL.

4. CONTRACTOR SHALL KEEP ACCESS OPEN TO ALL

EXISTING DOORS, FIRE EXITS, AND LOADING DOCKS

DURING ALL PHASES OF CONSTRUCTION. IF TEMPORARY

CLOSURES ARE REQUIRED, COORDINATE WITH VHA

ADMINISTRATION A MINIMUM OF 3 WEEKS IN ADVANCE.

5. CONTRACTOR IS REQUIRED TO MAINTAIN ONE DRIVING

LANE OPEN AT ALL TIMES BETWEEN THE WORK SITE AND

THE STAGING AREA. REFER TO SHEET G-0.02

6. CONTRACTOR IS RESPONSIBLE FOR GENERAL TRAFFIC

CONTROL TO KEEP VEHICLES AND PEDESTRIANS MOVING

OUTSIDE OF THE PROJECT SITE. CONTRACTOR SHALL

PROVIDE ADEQUATE SIGNS AND STAFF TO DIRECT FOR

PUBLIC SAFETY AND TRAFFIC CONTROL. TEMPORARY

FENCING AND COORDINATION WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR

SHALL COORDINATE ANY RESTRICTIONS WITH THE VA

ADMINISTRATION. CONTRACTOR WILL BE REQUIRED TO

PROVIDE A DETAILED PHASING PLAN THAT OUTLINES

TEMPORARY FENCING/TRAFFIC CONTROL FOR EACH PHASE

OF CONSTRUCTION. REFER TO G1004 PHASING PLAN.

7. ALL GRASSED AREAS DISTURBED BY CONSTRUCTION

SHALL HAVE TOPSOIL (6" DEPTH), GRADED, SEEDED,

AND HYDRO-MULCHED.

AutoCAD SHX Text

GM

AutoCAD SHX Text

ELECTRICAL TRANSFORMER AREA

AutoCAD SHX Text

WV

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text O

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

FUEL PUMP

AutoCAD SHX Text

ELEC. RISER

AutoCAD SHX Text

DOOR ELEV. 899.14

AutoCAD SHX Text

DOOR ELEV. 899.22

AutoCAD SHX Text

DOOR ELEV. 899.17

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 898.44

AutoCAD SHX Text

INV 892.14

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 989.58

AutoCAD SHX Text

INV 890.48

AutoCAD SHX Text

REMOVE AND REPLACE GATE

AutoCAD SHX Text

GATE

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 898.40

AutoCAD SHX Text

INV 889.45

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 897.06

AutoCAD SHX Text

INV 887.76

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 897.28

AutoCAD SHX Text

INV 888.93

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 897.40

AutoCAD SHX Text

INV E 887.90

AutoCAD SHX Text

INV N-S 886.05

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 896.88

AutoCAD SHX Text

INV 886.98

AutoCAD SHX Text

OVERHEAD DOOR ELEV. 900.48

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

WATER PIV

AutoCAD SHX Text S

AutoCAD SHX Text

ABANDONED SAN MH

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

15" PVC

AutoCAD SHX Text

15" PVC

AutoCAD SHX Text

15" PVC

AutoCAD SHX Text

15" HDPE

AutoCAD SHX Text

15" HDPE

AutoCAD SHX Text

BM-2

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 898.13

AutoCAD SHX Text

INV SW 888.18

AutoCAD SHX Text

INV N 890.23

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

WV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

DOOR ELEV. 893.36

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 899.52

AutoCAD SHX Text

INV 886.87

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 899.68

AutoCAD SHX Text

INV 889.39

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 979.72

AutoCAD SHX Text

INV E 967.32

AutoCAD SHX Text

INV S 970.32

AutoCAD SHX Text

INV W 969.47

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 890.75

AutoCAD SHX Text

INV 881.40

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 980.68

AutoCAD SHX Text

INV N-S-W 971.23

AutoCAD SHX Text

INV NE +/-884.68

AutoCAD SHX Text

SLOT DRAIN

AutoCAD SHX Text

METAL STAIRS

AutoCAD SHX Text

METAL STAIRS

AutoCAD SHX Text

DOOR ELEV. 893.17

AutoCAD SHX Text

LOADING DOCK DOOR ELEV. 893.04

AutoCAD SHX Text

DOOR ELEV. 897.90

AutoCAD SHX Text

DOOR ELEV. 893.34

AutoCAD SHX Text

DOORS ELEV. 897.78

AutoCAD SHX Text

DOOR ELEV. 897.76

AutoCAD SHX Text

6" STORM

AutoCAD SHX Text

3" COND

AutoCAD SHX Text

6" STORM

AutoCAD SHX Text

3" COND

AutoCAD SHX Text

4" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

18" HDPE

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

12" HDPE

AutoCAD SHX Text

12" HDPE

AutoCAD SHX Text

LOADING DOCK

AutoCAD SHX Text

PIER (TYP.)

AutoCAD SHX Text

PIER (TYP.)

AutoCAD SHX Text

BUILDING OVERHANG

AutoCAD SHX Text

BM-1

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 892.39

AutoCAD SHX Text

INV 885.09

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 892.92

AutoCAD SHX Text

INV 884.92

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

CO

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text W

AutoCAD SHX Text

WV

AutoCAD SHX Text

DS

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

EP

AutoCAD SHX Text

GM

D

HOSPITAL

X

X X

X X

X

X

X X

X

X

BR

BR

NEW 4000 GAL TANK

(12'X8')

(SEE MECH. FOR

DETAILS)

TEMPORARY ABOVE

GROUND TANK

(SEE MECH. FOR

DETAILS)

TEMPORARY JERSEY

BARRIERS FOR

ABOVE GROUND

TANK PROTECTION

(FIELD VERIFY)

D

BLDG 10

BOILER PLANT

BLDG 50

COLD STORAGE

X

X X

X

XX

X X

X

X X X

SF

SF

SF

NEW 4000 GAL TANK

(12'X8')

(SEE MECH. FOR

DETAILS)

THREE (3) 20000 GAL TANKS

(24'X12')

(SEE MECH. FOR DETAILS)

TEMPORARY ABOVE

GROUND TANK

(SEE MECHANICAL

FOR DETAILS)

TEMPORARY JERSEY

BARRIERS FOR

ABOVE GROUND

TANK PROTECTION

(FIELD VERIFY

LOCAITON)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Replace USTs and Leak Detection System Phase 2

437-24-101

Project Director

08/28/2025 AKE BRCRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

100% BID DOCUMENTS

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M21

PROTECTION ENGINEERING CONSULTANTS (PEC)

100 CREEK ROAD, SUITE 102

DRIPPING SPRINGS, TX 78620

PH: (512) 380-1988

WESTERN WATER CONSULTANTS (WWC)

1275 MAPLE STREET, SUITE F

HELENA, MT 59601

PH: (406) 443-3962

MBN

503 7TH STREET, SUITE 200

FARGO, ND 58102

PH: (701) 478-6336

ENVIROS

220 RAMSEY STREET

HASTINGS, MN 55033

PH: (651) 319-0170

08-28-25 C2.0

EROSION CONTROL /

UTILITY PLAN

SYMBOL LEGEND:

EXISTING PROPERTY LINE

EXISTING STORM SEWER LINE

EXISTING SANITARY SEWER LINE

EXISTING WATER LINE

EXISTING STORM MANHOLE

EXISTING SANITARY MANHOLE

EXISTING WATER GATE VALVE

EXISTING HYDRANT/BENCHMARK

EXISTING LIGHT POLE

EXISTING ELECTRICAL MANHOLE

EXISTING BOLLARD

EXISTING DOWNSPOUT

EXISTING DECIDUOUS TREE/SHRUB

PLAN NOTES:

EXISTING GAS LINE

EXISTING ELECTRICAL LINE

EXISTING WATER MANHOLE

EXISTING COMMUNICATIONS VAULT

EXISTING TRANSFORMER

EXISTING ELECTRICAL PEDESTAL

EXISTING CLEANOUT

EXISTING GAS METER

EXISTING SIGN

EXISTING STORM INLET

EXISTING FENCE

EXISTING HANDRAIL

EXISTING RETAINING WALL

S

E

N

W

SCALE: 1 INCH = 20 FEET

20100 40 UST #1, #2, #3, & #4 EROSION CONTROL / UTILITY

UST #8 EROSION CONTROL / UTILITY

TEMPORARY SECURITY FENCEX

NEW INLET PROTECTION

SF

NEW BIOROLLBR

BENCHMARKS:

BM-1: TOP NUT OF HYDRANT LOCATED EAST OF THE HOSPITAL AND

NORTH OF THE LOADING DOCK, +/-50' EAST OF UST #8.

ELEVATION = 893.98 (NAVD88)

BM-2: TOP NUT OF HYDRANT LOCATED SOUTH OF BUILDING #10 &

WEST OF UST #4, +/-10' SOUTH OF BUILDING #10.

ELEVATION = 901.04 (NAVD88)

NEW TEMPORARY JERSEY BARRIER

1. CONTRACTOR SHALL LOCATE ALL UTILITIES PRIOR TO

CONSTRUCTION. NORTH DAKOTA ONE CALL WILL ONLY

LOCATE THEIR MAINS AND WILL NOT LOCATE PRIVATE

UTILITIES ON THIS SITE. THE VA IS NOT

RESPONSIBLE FOR LOCATING ANY ON SITE UTILITIES.

REFER TO CD102, CU101, AND SITE ELECTRICAL PLANS

FOR EXISTING/PROPOSED UTILITY LOCATIONS.

2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND

ELEVATION OF ALL EXISTING/PROPOSED UTILITY

CROSSINGS, AND WHERE EXISTING UTILITIES CONNECT

INTO NEW UTILITY MAINS.

3. ALL PAVEMENT MARKED FOR DEMOLITION SHALL BE FULL

DEPTH SAW CUT PRIOR TO REMOVAL.

4. CONTRACTOR SHALL KEEP ACCESS OPEN TO ALL

EXISTING DOORS, FIRE EXITS, AND LOADING DOCKS

DURING ALL PHASES OF CONSTRUCTION. IF TEMPORARY

CLOSURES ARE REQUIRED, COORDINATE WITH VHA

ADMINISTRATION A MINIMUM OF 3 WEEKS IN ADVANCE.

5. CONTRACTOR IS REQUIRED TO MAINTAIN ONE DRIVING

LANE OPEN AT ALL TIMES BETWEEN THE WORK SITE AND

THE STAGING AREA. REFER TO SHEET G-0.02

6. CONTRACTOR IS RESPONSIBLE FOR GENERAL TRAFFIC

CONTROL TO KEEP VEHICLES AND PEDESTRIANS MOVING

OUTSIDE OF THE PROJECT SITE. CONTRACTOR SHALL

PROVIDE ADEQUATE SIGNS AND STAFF TO DIRECT FOR

PUBLIC SAFETY AND TRAFFIC CONTROL. TEMPORARY

FENCING AND COORDINATION WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR

SHALL COORDINATE ANY RESTRICTIONS WITH THE VA

ADMINISTRATION. CONTRACTOR WILL BE REQUIRED TO

PROVIDE A DETAILED PHASING PLAN THAT OUTLINES

TEMPORARY FENCING/TRAFFIC CONTROL FOR EACH PHASE

OF CONSTRUCTION. REFER TO G1004 PHASING PLAN.

7. ALL GRASSED AREAS DISTURBED BY CONSTRUCTION

SHALL HAVE TOPSOIL (6" DEPTH), GRADED, SEEDED,

AND HYDRO-MULCHED.

AutoCAD SHX Text

WV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

DOOR ELEV. 893.36

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 899.52

AutoCAD SHX Text

INV 886.87

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 899.68

AutoCAD SHX Text

INV 889.39

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 979.72

AutoCAD SHX Text

INV E 967.32

AutoCAD SHX Text

INV S 970.32

AutoCAD SHX Text

INV W 969.47

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 890.75

AutoCAD SHX Text

INV 881.40

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 980.68

AutoCAD SHX Text

INV N-S-W 971.23

AutoCAD SHX Text

INV NE +/-884.68

AutoCAD SHX Text

SLOT DRAIN

AutoCAD SHX Text

METAL STAIRS

AutoCAD SHX Text

METAL STAIRS

AutoCAD SHX Text

DOOR ELEV. 893.17

AutoCAD SHX Text

LOADING DOCK DOOR ELEV. 893.04

AutoCAD SHX Text

DOOR ELEV. 897.90

AutoCAD SHX Text

DOOR ELEV. 893.34

AutoCAD SHX Text

DOORS ELEV. 897.78

AutoCAD SHX Text

DOOR ELEV. 897.76

AutoCAD SHX Text

6" STORM

AutoCAD SHX Text

3" COND

AutoCAD SHX Text

6" STORM

AutoCAD SHX Text

3" COND

AutoCAD SHX Text

4" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

18" HDPE

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

12" HDPE

AutoCAD SHX Text

12" HDPE

AutoCAD SHX Text

LOADING DOCK

AutoCAD SHX Text

PIER (TYP.)

AutoCAD SHX Text

PIER (TYP.)

AutoCAD SHX Text

BUILDING OVERHANG

AutoCAD SHX Text

BM-1

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 892.39

AutoCAD SHX Text

INV 885.09

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 892.92

AutoCAD SHX Text

INV 884.92

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

GM

AutoCAD SHX Text

ELECTRICAL TRANSFORMER AREA

AutoCAD SHX Text

WV

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

FUEL PUMP

AutoCAD SHX Text

ELEC. RISER

AutoCAD SHX Text

DOOR ELEV. 899.14

AutoCAD SHX Text

DOOR ELEV. 899.22

AutoCAD SHX Text

DOOR ELEV. 899.17

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 898.44

AutoCAD SHX Text

INV 892.14

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 989.58

AutoCAD SHX Text

INV 890.48

AutoCAD SHX Text

GATE

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 898.40

AutoCAD SHX Text

INV 889.45

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 897.06

AutoCAD SHX Text

INV 887.76

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 897.28

AutoCAD SHX Text

INV 888.93

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 897.40

AutoCAD SHX Text

INV E 887.90

AutoCAD SHX Text

INV N-S 886.05

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 896.88

AutoCAD SHX Text

INV 886.98

AutoCAD SHX Text

OVERHEAD DOOR ELEV. 900.48

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

6" PVC

AutoCAD SHX Text

WATER PIV

AutoCAD SHX Text S

AutoCAD SHX Text

ABANDONED SAN MH

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

8" PVC

AutoCAD SHX Text

15" PVC

AutoCAD SHX Text

15" PVC

AutoCAD SHX Text

15" PVC

AutoCAD SHX Text

15" HDPE

AutoCAD SHX Text

15" HDPE

AutoCAD SHX Text

BM-2

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 898.13

AutoCAD SHX Text

INV SW 888.18

AutoCAD SHX Text

INV N 890.23

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

CO

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text W

AutoCAD SHX Text

WV

AutoCAD SHX Text

DS

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

EP

D

HOSPITAL

X

X X

X X

X

X

X X

X

X

TEMPORARY ABOVE

GROUND TANK

(SEE MECH. FOR

DETAILS)

897.61ME

895.06ME

896.35ME

897.56ME

TEMPORARY JERSEY

BARRIERS FOR

ABOVE GROUND

TANK PROTECTION

(FIELD VERIFY) 895.21ME

896.50RIM

D

BLDG 10

BOILER PLANT

BLDG 50

COLD STORAGE

X

X X

X

XX

X X

X

X X X

897.59ME

897.34ME

898.99ME

898.74ME

898.89ME

899.74ME

900.13ME899.41ME

899.60TP

899.60TP

899.60TP

899.60TP

899.50TP 899.50TP

899.50TP

899.50TP

899.40TP 899.40TP

899.40TP899.40TP

898.25TP

898.20TP

898.25TP

898.20TP

898.30RIM

899.45RIM

899.55RIM

899.65RIM

898.85ME

898.92ME

898.97ME

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Replace USTs and Leak Detection System Phase 2

437-24-101

Project Director

08/28/2025 AKE BRCRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

100% BID DOCUMENTS

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M21

PROTECTION ENGINEERING CONSULTANTS (PEC)

100 CREEK ROAD, SUITE 102

DRIPPING SPRINGS, TX 78620

PH: (512) 380-1988

WESTERN WATER CONSULTANTS (WWC)

1275 MAPLE STREET, SUITE F

HELENA, MT 59601

PH: (406) 443-3962

MBN

503 7TH STREET, SUITE 200

FARGO, ND 58102

PH: (701) 478-6336

ENVIROS

220 RAMSEY STREET

HASTINGS, MN 55033

PH: (651) 319-0170

08-28-25 C3.0

GRADING PLAN

SYMBOL LEGEND:

EXISTING PROPERTY LINE

EXISTING STORM MANHOLE

EXISTING SANITARY MANHOLE

EXISTING WATER GATE VALVE

EXISTING HYDRANT/BENCHMARK

EXISTING LIGHT POLE

EXISTING ELECTRICAL MANHOLE

EXISTING BOLLARD

EXISTING DOWNSPOUT

EXISTING DECIDUOUS TREE/SHRUB

PLAN NOTES:

EXISTING WATER MANHOLE

EXISTING COMMUNICATIONS VAULT

EXISTING TRANSFORMER

EXISTING ELECTRICAL PEDESTAL

EXISTING CLEANOUT

EXISTING GAS METER

EXISTING SIGN

EXISTING STORM INLET

EXISTING FENCE

EXISTING HANDRAIL

EXISTING RETAINING WALL

S

E

N

W

SCALE: 1 INCH = 20 FEET

20100 40 UST #1, #2, #3, & #4 GRADING

UST #8 GRADING

TEMPORARY SECURITY FENCEX

NEW FINISHED GRADE ELEVATION

NEW SIDEWALK ELEVATION

MATCH EXISTING ELEVATION

NEW SLOPE & DIRECTION OF FLOW

1.0%

900.00FG

900.00SW

900.00ME

NEW TOP OF PAVEMENT ELEVATION

NEW GUTTER ELEVATION

NEW TOP OF CURB ELEVATION

900.00TP

900.00G

900.00TC

BENCHMARKS:

BM-1: TOP NUT OF HYDRANT LOCATED EAST OF THE HOSPITAL AND

NORTH OF THE LOADING DOCK, +/-50' EAST OF UST #8.

ELEVATION = 893.98 (NAVD88)

BM-2: TOP NUT OF HYDRANT LOCATED SOUTH OF BUILDING #10 &

WEST OF UST #4, +/-10' SOUTH OF BUILDING #10.

ELEVATION = 901.04 (NAVD88)

NEW CONTOUR LINE895

NEW TEMPORARY JERSEY BARRIER

SIDE ELEVATION

REINFORCED CONCRETE SLAB

MANHOLE COVER (TRAFFIC RATED AT EXTERIOR GRADE FOR UST 8)

ACCESS COVER

SEALED WATER TIGHT

REINFORCED CONCRETE BALLAST PAD

DESIGN FOR BUOYANCY OF EMPTY

TANK WITH CREDIT FOR BACKFILL

BEDDING MATERIAL

SOIL SEPARATOR

CONCRETE SLAB FLUSH

WITH EXTERIOR GRADE

FOR UST 8

TANK

1 TANK #8 ELEVATION

C3.0 NOT-TO-SCALE

SIDE ELEVATION

REINFORCED CONCRETE SLAB

MANHOLE COVER (TRAFFIC RATED AT ASPHALT LEVEL FOR UST 4)

ACCESS COVER

SEALED WATER TIGHT

REINFORCED CONCRETE BALLAST PAD

DESIGN FOR BUOYANCY OF EMPTY

TANK WITH CREDIT FOR BACKFILL

BEDDING MATERIAL

SOIL SEPARATOR

CONCRETE SLAB

FLUSH WITH ASPHALT

GRADE FOR UST 4

RIM GRADE TANK #4: 898.30

TANK

2 TANK #4 ELEVATION

C3.0 NOT-TO-SCALE

3 TANK #1, #2, #3 ELEVATION

C3.0 NOT-TO-SCALE

RIM GRADE TANK #8: 896.50

ACCESS COVER

SEALED WATER TIGHT

REINFORCED CONCRETE BALLAST PAD

DESIGN FOR BUOYANCY OF EMPTY

TANK WITH CREDIT FOR BACKFILL

BEDDING MATERIAL

SOIL SEPARATOR

MANHOLE COVER (TRAFFIC RATED AT

ASPHALT LEVEL FOR UST 1, 2, & 3)

TANK

SIDE ELEVATION

RIM GRADE TANK #1: 899.65

RIM GRADE TANK #2: 899.55

RIM GRADE TANK #3: 899.45

1. SEE MECHANICAL PLANS FOR TANK DETAILS

NOTES

1. SEE MECHANICAL PLANS FOR TANK DETAILS.

NOTES

1. SEE MECHANICAL PLANS FOR TANK DETAILS

NOTES

CONCRETE SLAB FLUSH

WITH ASPHALT GRADE

FOR UST 1, 2, & 3

REINFORCED CONCRETE SLAB

1. CONTRACTOR SHALL LOCATE ALL UTILITIES PRIOR TO

CONSTRUCTION. NORTH DAKOTA ONE CALL WILL ONLY

LOCATE THEIR MAINS AND WILL NOT LOCATE PRIVATE

UTILITIES ON THIS SITE. THE VA IS NOT

RESPONSIBLE FOR LOCATING ANY ON SITE UTILITIES.

REFER TO CD102, CU101, AND SITE ELECTRICAL PLANS

FOR EXISTING/PROPOSED UTILITY LOCATIONS.

2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND

ELEVATION OF ALL EXISTING/PROPOSED UTILITY

CROSSINGS, AND WHERE EXISTING UTILITIES CONNECT

INTO NEW UTILITY MAINS.

3. ALL PAVEMENT MARKED FOR DEMOLITION SHALL BE FULL

DEPTH SAW CUT PRIOR TO REMOVAL.

4. CONTRACTOR SHALL KEEP ACCESS OPEN TO ALL

EXISTING DOORS, FIRE EXITS, AND LOADING DOCKS

DURING ALL PHASES OF CONSTRUCTION. IF TEMPORARY

CLOSURES ARE REQUIRED, COORDINATE WITH VHA

ADMINISTRATION A MINIMUM OF 3 WEEKS IN ADVANCE.

5. CONTRACTOR IS REQUIRED TO MAINTAIN ONE DRIVING

LANE OPEN AT ALL TIMES BETWEEN THE WORK SITE AND

THE STAGING AREA. REFER TO SHEET G-0.02

6. CONTRACTOR IS RESPONSIBLE FOR GENERAL TRAFFIC

CONTROL TO KEEP VEHICLES AND PEDESTRIANS MOVING

OUTSIDE OF THE PROJECT SITE. CONTRACTOR SHALL

PROVIDE ADEQUATE SIGNS AND STAFF TO DIRECT FOR

PUBLIC SAFETY AND TRAFFIC CONTROL. TEMPORARY

FENCING AND COORDINATION WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR

SHALL COORDINATE ANY RESTRICTIONS WITH THE VA

ADMINISTRATION. CONTRACTOR WILL BE REQUIRED TO

PROVIDE A DETAILED PHASING PLAN THAT OUTLINES

TEMPORARY FENCING/TRAFFIC CONTROL FOR EACH PHASE

OF CONSTRUCTION. REFER TO G1004 PHASING PLAN.

7. ALL GRASSED AREAS DISTURBED BY CONSTRUCTION

SHALL HAVE TOPSOIL (6" DEPTH), GRADED, SEEDED,

AND HYDRO-MULCHED.

AutoCAD SHX Text

WV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

DOOR ELEV. 893.36

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 899.52

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 899.68

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 979.72

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 890.75

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 980.68

AutoCAD SHX Text

SLOT DRAIN

AutoCAD SHX Text

METAL STAIRS

AutoCAD SHX Text

METAL STAIRS

AutoCAD SHX Text

DOOR ELEV. 893.17

AutoCAD SHX Text

LOADING DOCK DOOR ELEV. 893.04

AutoCAD SHX Text

DOOR ELEV. 897.90

AutoCAD SHX Text

DOOR ELEV. 893.34

AutoCAD SHX Text

DOORS ELEV. 897.78

AutoCAD SHX Text

DOOR ELEV. 897.76

AutoCAD SHX Text

LOADING DOCK

AutoCAD SHX Text

PIER (TYP.)

AutoCAD SHX Text

PIER (TYP.)

AutoCAD SHX Text

BUILDING OVERHANG

AutoCAD SHX Text

BM-1

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 892.39

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 892.92

AutoCAD SHX Text

INV 884.92

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

GM

AutoCAD SHX Text

ELECTRICAL TRANSFORMER AREA

AutoCAD SHX Text

WV

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

FUEL PUMP

AutoCAD SHX Text

ELEC. RISER

AutoCAD SHX Text

DOOR ELEV. 899.14

AutoCAD SHX Text

DOOR ELEV. 899.22

AutoCAD SHX Text

DOOR ELEV. 899.17

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 898.44

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 989.58

AutoCAD SHX Text

GATE

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 898.40

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 897.06

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 897.28

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 897.40

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 896.88

AutoCAD SHX Text

OVERHEAD DOOR ELEV. 900.48

AutoCAD SHX Text

WATER PIV

AutoCAD SHX Text S

AutoCAD SHX Text

ABANDONED SAN MH

AutoCAD SHX Text

BM-2

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 898.13

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

CO

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text W

AutoCAD SHX Text

WV

AutoCAD SHX Text

DS

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

EP

AutoCAD SHX Text

GM

AutoCAD SHX Text V

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FILL

AutoCAD SHX Text

GAGE

AutoCAD SHX Text

FOR

AutoCAD SHX Text

FOR

AutoCAD SHX Text V

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FILL

AutoCAD SHX Text

GAGE

AutoCAD SHX Text

FOR

AutoCAD SHX Text

FOR

AutoCAD SHX Text V

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FILL

AutoCAD SHX Text

GAGE

AutoCAD SHX Text

FOR

FOR

D

HOSPITAL

TEMPORARY SECURITY FENCE

FIELD VERIFY LOCATION

X

X X

X X

X

X

X X

X

X

TEMPORARY ABOVE

GROUND TANK

(SEE MECH. FOR

DETAILS)

TEMPORARY JERSEY

BARRIERS FOR

ABOVE GROUND

TANK PROTECTION

(FIELD VERIFY)

REPLACE SIDEWALK

CONTRACTOR SHALL PROVIDE ALL SHORING AND

BRACING TO PROTECT ADJACENT FACILITIES AND

UTILITIES. CONTRACTOR SHALL PREPARE AND

PROVIDE ALL ENGINEERED DRAWINGS AND EXCAVATION

FOR APPROVAL BY THE VA AND CONSULTANT.

D

BLDG 10

BOILER PLANT

BLDG 50

COLD STORAGE

X

X X

X

TEMPORARY SECURITY FENCE

(FIELD VERIFY LOCATION)

XX

X X

X

X X X

TEMPORARY SECURITY FENCE

FIELD VERIFY LOCATION

REPLACE BOLLARDS

AND GATE AFTER

INSTALLATION OF TANK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Replace USTs and Leak Detection System Phase 2

437-24-101

Project Director

08/28/2025 AKE BRCRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

100% BID DOCUMENTS

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M21

PROTECTION ENGINEERING CONSULTANTS (PEC)

100 CREEK ROAD, SUITE 102

DRIPPING SPRINGS, TX 78620

PH: (512) 380-1988

WESTERN WATER CONSULTANTS (WWC)

1275 MAPLE STREET, SUITE F

HELENA, MT 59601

PH: (406) 443-3962

MBN

503 7TH STREET, SUITE 200

FARGO, ND 58102

PH: (701) 478-6336

ENVIROS

220 RAMSEY STREET

HASTINGS, MN 55033

PH: (651) 319-0170

08-28-25 C4.0

PAVING PLAN

NEW 6" ASPHALT PAVEMENT

NEW 6" REINFORCED CONCRETE PAVEMENT

SYMBOL LEGEND:

1. CONTRACTOR SHALL LOCATE ALL UTILITIES PRIOR TO

CONSTRUCTION. NORTH DAKOTA ONE CALL WILL ONLY

LOCATE THEIR MAINS AND WILL NOT LOCATE PRIVATE

UTILITIES ON THIS SITE. THE VA IS NOT

RESPONSIBLE FOR LOCATING ANY ON SITE UTILITIES.

REFER TO CD102, CU101, AND SITE ELECTRICAL PLANS

FOR EXISTING/PROPOSED UTILITY LOCATIONS.

2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND

ELEVATION OF ALL EXISTING/PROPOSED UTILITY

CROSSINGS, AND WHERE EXISTING UTILITIES CONNECT

INTO NEW UTILITY MAINS.

3. ALL PAVEMENT MARKED FOR DEMOLITION SHALL BE FULL

DEPTH SAW CUT PRIOR TO REMOVAL.

4. CONTRACTOR SHALL KEEP ACCESS OPEN TO ALL

EXISTING DOORS, FIRE EXITS, AND LOADING DOCKS

DURING ALL PHASES OF CONSTRUCTION. IF TEMPORARY

CLOSURES ARE REQUIRED, COORDINATE WITH VHA

ADMINISTRATION A MINIMUM OF 3 WEEKS IN ADVANCE.

5. CONTRACTOR IS REQUIRED TO MAINTAIN ONE DRIVING

LANE OPEN AT ALL TIMES BETWEEN THE WORK SITE AND

THE STAGING AREA. REFER TO SHEET G-0.02

6. CONTRACTOR IS RESPONSIBLE FOR GENERAL TRAFFIC

CONTROL TO KEEP VEHICLES AND PEDESTRIANS MOVING

OUTSIDE OF THE PROJECT SITE. CONTRACTOR SHALL

PROVIDE ADEQUATE SIGNS AND STAFF TO DIRECT FOR

PUBLIC SAFETY AND TRAFFIC CONTROL. TEMPORARY

FENCING AND COORDINATION WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR

SHALL COORDINATE ANY RESTRICTIONS WITH THE VA

ADMINISTRATION. CONTRACTOR WILL BE REQUIRED TO

PROVIDE A DETAILED PHASING PLAN THAT OUTLINES

TEMPORARY FENCING/TRAFFIC CONTROL FOR EACH PHASE

OF CONSTRUCTION. REFER TO G1004 PHASING PLAN.

7. ALL GRASSED AREAS DISTURBED BY CONSTRUCTION

SHALL HAVE TOPSOIL (6" DEPTH), GRADED, SEEDED,

AND HYDRO-MULCHED.

PLAN NOTES:

S

E

N

W

SCALE: 1 INCH = 20 FEET

20100 40 UST #1, #2, #3, & #4 PAVING

UST #8 PAVING

EXISTING PROPERTY LINE

EXISTING STORM MANHOLE

EXISTING SANITARY MANHOLE

EXISTING WATER GATE VALVE

EXISTING HYDRANT/BENCHMARK

EXISTING LIGHT POLE

EXISTING ELECTRICAL MANHOLE

EXISTING BOLLARD

EXISTING DOWNSPOUT

EXISTING DECIDUOUS TREE/SHRUB

EXISTING WATER MANHOLE

EXISTING COMMUNICATIONS VAULT

EXISTING TRANSFORMER

EXISTING ELECTRICAL PEDESTAL

EXISTING CLEANOUT

EXISTING GAS METER

EXISTING SIGN

EXISTING STORM INLET

EXISTING FENCE

EXISTING HANDRAIL

EXISTING RETAINING WALL

TEMPORARY SECURITY FENCEX

BENCHMARKS:

BM-1: TOP NUT OF HYDRANT LOCATED EAST OF THE HOSPITAL AND

NORTH OF THE LOADING DOCK, +/-50' EAST OF UST #8.

ELEVATION = 893.98 (NAVD88)

BM-2: TOP NUT OF HYDRANT LOCATED SOUTH OF BUILDING #10 &

WEST OF UST #4, +/-10' SOUTH OF BUILDING #10.

ELEVATION = 901.04 (NAVD88)

NEW TEMPORARY JERSEY BARRIER

AutoCAD SHX Text

WV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

DOOR ELEV. 893.36

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 899.52

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 899.68

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 979.72

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 890.75

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 980.68

AutoCAD SHX Text

SLOT DRAIN

AutoCAD SHX Text

METAL STAIRS

AutoCAD SHX Text

METAL STAIRS

AutoCAD SHX Text

DOOR ELEV. 893.17

AutoCAD SHX Text

LOADING DOCK DOOR ELEV. 893.04

AutoCAD SHX Text

DOOR ELEV. 897.90

AutoCAD SHX Text

DOOR ELEV. 893.34

AutoCAD SHX Text

DOORS ELEV. 897.78

AutoCAD SHX Text

DOOR ELEV. 897.76

AutoCAD SHX Text

LOADING DOCK

AutoCAD SHX Text

PIER (TYP.)

AutoCAD SHX Text

PIER (TYP.)

AutoCAD SHX Text

BUILDING OVERHANG

AutoCAD SHX Text

BM-1

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 892.39

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 892.92

AutoCAD SHX Text

INV 884.92

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

GM

AutoCAD SHX Text

ELECTRICAL TRANSFORMER AREA

AutoCAD SHX Text

WV

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

FUEL PUMP

AutoCAD SHX Text

ELEC. RISER

AutoCAD SHX Text

DOOR ELEV. 899.14

AutoCAD SHX Text

DOOR ELEV. 899.22

AutoCAD SHX Text

DOOR ELEV. 899.17

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 898.44

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 989.58

AutoCAD SHX Text

GATE

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 898.40

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 897.06

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 897.28

AutoCAD SHX Text

SAN MH

AutoCAD SHX Text

RIM 897.40

AutoCAD SHX Text

STM INLET

AutoCAD SHX Text

RIM 896.88

AutoCAD SHX Text

OVERHEAD DOOR ELEV. 900.48

AutoCAD SHX Text

WATER PIV

AutoCAD SHX Text S

AutoCAD SHX Text

ABANDONED SAN MH

AutoCAD SHX Text

BM-2

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

STM MH

AutoCAD SHX Text

RIM 898.13

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

CO

AutoCAD SHX Text S

AutoCAD SHX Text D

AutoCAD SHX Text W

AutoCAD SHX Text

WV

AutoCAD SHX Text

DS

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

EP

-1

-1

4"

8"

SAWED JOINT FACE

RECESS SEALANT

1/4"-3/8"

BELOW PAVEMENT

1/4"-3/8" MIN.

SEALANT DEPTH

1/2" ROD BACK-UP

MATERIAL

8 TYPE 'C' DETAIL

C5.0 NOT-TO-SCALE

D

D

#4 x 30" DEF.

BARS @ 24" O.C.

5 TYPE 'C' TIED CONSTRUCTION JOINT DETAIL

C5.0 NOT-TO-SCALE

-1

8"

-1

8"

1/2" ROD BACK-UP MATERIAL

SAWED JOINT FACE

RECESS SEALANT 1/4"-3/8"

BELOW PAVEMENT

INITIAL SAWCUT (REFER TO

DIMENSION TABLE) 6"-10"

THICK PCC = T/4

1/4"-3/8" MIN.

SEALANT DEPTH

7 TYPE 'H' DETAIL

C8.1 NOT-TO-SCALE

D

4 TYPE 'H' CONSTRUCTION JOINT DETAIL

C5.0 NOT-TO-SCALE

2 INLET PROTECTION DETAIL (PAVEMENT)

C5.0 NOT-TO-SCALE

- REMOVE THE INLET GRATE

- INSERT THE DEVICE INTO THE CASTING FRAME

- INSTALL GRATE INTO CASTING FRAME OVER TOP OF DEVICE

MAINTENANCE:

INSTALLATION:

CURB & GUTTER

DEFLECTOR

PLATE

10" FILTER ASSEMBLY WITH

HIGH FLOW FABRIC - MIRAFI

FF101 OR APPROVED EQUAL.

OVERFLOW SHALL BE LOCATED

ON TOP OF FILTER

ASSEMBLY.

ALLOW FOR OVERFLOW

ABOVE DEFLECTOR PLATE

- CHECK REGULARLY & AFTER RAIN EVENTS. IF THE DEVICE

IS FILLED WITH 1/3 OF ITS CAPACITY WITH SEDIMENT,

EMPTY THE DEVICE.

- REMOVE DEBRIS AROUND THE INLET GRATE PRIOR TO

REMOVING DEVICE

OVERFLOW 1 - CENTER OF FILTER ASSEMBLY

OVERFLOW 2 - TOP OF CURB BOX

4" MAX

12" MIN

4" MAX

12" MIN

ROPE TIE

ROPE TIE

FIBER ROLL

1 BIOROLL DETAIL

C5.0 NOT-TO-SCALE

SLOPE VARIES

2" X 2"

WOOD STAKES WOOD

STAKES

FIBER ROLL

9" MINSLOPE

VARIES

2" X 2" WOOD

STAKES OR PINS MAX

4.0' SPACING

4.0 ' M

AX

FIBER ROLLS 4.0

' M

AX

4.0 ' M

AX

4.0

' M

AX

NOTE:

VERTICAL SPACING

MEASURED ALONG THE

FACE OF THE SLOPE

VARIES BETWEEN

10.0 FT & 100.0 FT

INSTALL FIBER ROLL

ALONG A LEVEL CONTOUR

INSTALL A FIBER ROLL NEAR

SLOPE WHERE IT TRANSITIONS

INTO A STEEPER SLOPE

FIBER ROLL 9" MIN

3 CONCRETE ABUTTING BUILDING DETAIL

C5.0 NOT-TO-SCALE

V A R I E S

NEW PAVEMENT

(SEE PLANS)

1/2" NON-EXTRUDING

PRE-MOLDED COMPRESSIBLE

MATERIAL

FACE OF

BUILDING

EXISTING/OR NEW

FOUNDATION WALL

(SEE STRUCTURAL

PLANS FOR DETAILS)

LOW MODULUS SILICONE SEALANT

12" SCARIFY &

RECOMPACT SUBGRADE

TO 95% STANDARD

PROCTOR DENSITY

GEOTEXTILE FABRIC

6" NDDOT CLASS 5 OR

APPROVED EQUAL

NDDOT TYPE R1

SAW CUT

6 CONCRETE PAVEMENT DETAIL

C5.0 NOT-TO-SCALE

#4 BARS @ 18" O.C. E.W.

2" WEARING COURSE

4" BASE COURSE

6" ND CLASS 5

AGGREGATE BASE

12" SCARIFY &

RECOMPACT SUBGRADE

TO 95% STANDARD

PROCTOR DENSITY GEOTEXTILE FABRIC

6" ASPHALT PAVEMENT DETAIL

NOT-TO-SCALE

C5.0

NDDOT TYPE R1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Replace USTs and Leak Detection System Phase 2

437-24-101

Project Director

08/28/2025 AKE BRCRevisions: Date:

2101 ELM STREET, FARGO, ND 58102

100% BID DOCUMENTS

517 7TH STREET

RAPID CITY, SD 57701

PH: (605) 342-9470

POC: JARED LOTT

FFD PROJECT NO:

19.2481.M21

PROTECTION ENGINEERING CONSULTANTS (PEC)

100 CREEK ROAD, SUITE 102

DRIPPING SPRINGS, TX 78620

PH: (512) 380-1988

WESTERN WATER CONSULTANTS (WWC)

1275 MAPLE STREET, SUITE F

HELENA, MT 59601

PH: (406) 443-3962

MBN

503 7TH STREET, SUITE 200

FARGO, ND 58102

PH: (701) 478-6336

ENVIROS

220 RAMSEY STREET

HASTINGS, MN 55033

PH: (651) 319-0170

08-28-25 C5.0

DETAILS

REMOVE EXISTING SIDEWALK

FOR NEW UST PIPING AND

RETAINING WALL

REMOVE EXISTING KEYSTONE RETAINING

WALL AND HANDRAIL. RETAIN EXISTING

HANDRAIL FOR REINSTALLATION. RETAIN

UNDAMAGED KEYSTONES FOR REUSE

WITH RECONSTRUCTION OF LOADING

DOCK RETAINING WALL. REMOVE ANY

EXISTING FOOTING SYSTEM IF PRESENT.

REMOVE EXISTING KEYSTONE

RETAINING WALL SECTION. RETAIN

UNDAMAGED KEYSTONES FOR

RECONSTRUCTION OF LOADING DOCK

KEYSTONE RETAINING WALL. REMOVE

ANY EXISTING FOOTING SYSTEM IF

PRESENT.

REMOVE EXISTING LOADING DOCK

KEYSTONE RETAINING WALL AND

HANDRAIL. RETAIN EXISTING

KEYSTONE BLOCKS IF UNDAMAGED

FOR REUSE IN RECONSTRUCTION OF

RETAINING WALL. RETAIN EXISTING

HANDRAIL FOR REINSTALLATION.

REMOVE ANY EXISTING FOOTING

SYSTEM IF PRESENT.

EXCAVATE AS NEEDED

FOR KEYSTONE WALL

RECONSTRUCTION

S-1.00

S-1.00

N

RE

D

RI

VE

R

OF

TH

E

NO

RT

H

BOTTOM O

F D

IKE SLO

PE

TOP O

F EARTHEN DIKE

TO

P

O F

EA

R

TH

EN

D

IK

E

BO

TT

O M

O F

D

IK

E

SL

O

PE

30W 30E

12 13

CITY

LIFT

STATION

(STORM

SEWER)

POUR NEW CONCRETE SIDEWALK RAMP,

MIN 5" THICK. REINFORCE W/ #4 REBAR

GRID, 12" O.C CENTERED IN SLAB.

MATCH EXISTING ELEVATION & RAMP

GRADE. BROOM FINISH REQUIRED.

NEW 8" CAST IN PLACE CONCRETE WALL.

MATCH EXISTING HEIGHT AND GRADE.

REFER TO DETAIL #7 ON THIS SHEET

NEW 8" CAST IN PLACE CONCRETE

WALL. MATCH EXISTING

DIMENSIONS AND GRADE. REFER

TO DETAIL #6 ON THIS SHEET

RECONSTRUCT LOADING DOCK

RETAINING WALL AS PER

MANUFACTURER'S

RECOMMENDATIONS. MATCH

EXISTING ELEVATION AND GRADE.

REUSE UNDAMAGED KEYSTONE

BLOCKS. NEW KEYSTONE BLOCKS TO

MATCH EXISTING. REFER TO DETAIL

#5 ON THIS SHEET.

BACKFILL ANY EXCAVATION TO

MATCH EXISTING GRADE AND

LANDSCAPING

S-1.00

S-1.00

S-1.00

PIN NEW CONCRETE SLAB TO EXISTING

CONCRETE WALL 24" O.C W/ #4 REBAR WITH

EPOXY EMBEDMENT. 8" DEEP MIN. IN EXISTING

WALL, 8" DEEP MIN. IN NEW SLAB. GRADE NEW

CONCRETE SLAB AWAY FROM BUILDING

8" STOOP WALL DOWN TO FROST DEPTH

PROVIDE 1/2" ISOLATION

JOINT & SEALANT AGAINST

EXISTING BUILDING AND

NEW CIP CONCRETE WALL

RECONSTRUCT EXISTING KEYSTONE LOADING

DOCK RETAINING WALL AS PER MANUFACTURER'S

RECOMMENDATIONS. REUSE EXISTING

UNDAMAGED KEYSTONE BLOCKS, REPLACE

BROKEN KEYSTONE BLOCKS AS NEEDED TO MATCH

EXISTING. MATCH EXISTING HEIGHT AND GRADE.

LOADING DOCK

RE-MOUNT EXISTING GUARDRAIL ON NEW 6"x6", 16"

DEEP CAST IN PLACE CONCRETE PIERS. PIN NEW

CONCRETE PIERS TO NEWLY PLACED KEYSTONE

BLOCK WALL 12" O.C W/ #4 REBAR WITH EPOXY

EMBEDMENT. 4" DEEP MIN. IN KEYSTONE BLOCK, 4"

DEEP MIN. IN NEW WALL.

FINSIHED

GRASS/GRAVEL GRADE

GRASS/GRAVEL

EARTH

12"x12" CLEAN ROCK BEHIND WALL TO ALL

DRAINAGE TO FILTER FABRIC AND PVC DRAIN TILE

FILTER FABRIC AROUND 12"x12"

AREA OF CLEAN ROCK MATERIAL

4"Ø PERFORATED PVC DRAIN TILE W/ 2" WEEPS @ 20'

O.C. PROVIDE RODENT SCREENS AT END OF WEEPS

3' W (MIN) LEVELING PAD OF

CLEAN ROCK OR ENGINEERED

FREE-DRAIN FILL BELOW THE

RETAINING WALL STRUCTURE

8" CONCRETE RETAINING

WALL W/ #4 HORIZONTAL & #5

VERTICAL REBAR GRID AT 12"

O.C THROUGHOUT. MATCH

EXISTING HEIGHT AND GRADE.

LOADING DOCK

SHORTEN END OF EXISTING GUARDRAIL AND

RE-MOUNT TO TOP OF NEW CONCRETE WALL.

SHORTEN BY CUTTING, WELDING, AND THEN

PRIME/PAINT END SECTION OF GUARDRAIL TO

MATCH EXISTING (BROWN COLOR)

OUTLINE OF RECONSTRUCTED

KEYSTONE LOADING DOCK RETAINING

WALL. PIN NEWLY PLACED KEYSTONE

BLOCK WALL TO NEW CONCRETE WALL

12" O.C W/ #4 REBAR WITH EPOXY

EMBEDMENT. 8" DEEP MIN. IN KEYSTONE

BLOCK, 8" DEEP MIN. IN NEW WALL.

BEVEL OUTSIDE CORNER 1"

WIDE AT 45 DEGREES

EXISTING EXTERIOR

CONCRETE WALL OF BE-98

PIN NEW CONCRETE WALL TO

EXISTING CONCRETE WALL 12"

O.C W/ #4 REBAR WITH EPOXY

EMBEDMENT. 8" DEEP MIN. IN

EXISTING WALL, 8" DEEP MIN.

IN NEW WALL

#5 VERTICAL REBAR DOWELS

@ 12"O.C W/ 12" HOOK IN

FOOTING

12" MIN.

3" CLEAR

1'-0" D x 3'-0" W x 4'-6" CONCRETE FOOTING W/ (x5) #5

REBAR EACH WAY @ BOTTOM

EXTERIOR GRADE

REINSTALL EXISTING HANDRAIL

ON TOP OF NEW CONCRETE

WALL

BEVEL OUTSIDE CORNER 1"

WIDE AT 45 DEGREES

EXISTING EXTERIOR

CONCRETE WALL OF BE-98

PIN NEW CONCRETE WALL TO

EXISTING CONCRETE WALL 12"

O.C W/ #4 REBAR WITH EPOXY

EMBEDMENT. 8" DEEP MIN. IN

EXISTING WALL, 8" DEEP MIN.

IN NEW WALL

3" CLEAR

1'-0" D x 3'-0" W x CONT.

CONCRETE FOOTING W/ (x3) #5

REBAR CONT. @ BOTTOM

8" CONCRETE RETAINING

WALL W/ #4 HORIZONTAL & #5

VERTICAL REBAR GRID AT 12"

O.C THROUGHOUT. MATCH

EXISTING HEIGHT AND GRADE.

8" MIN.

#5 VERTICAL REBAR DOWELS

@ 12"O.C W/ 12" HOOK IN

FOOTING

GENERAL WORK NOTES

· WALL RECONSTRUCTION WORK ON THIS SHEET IS TO BE

CONSIDERED AS PRIMARY WORK RELATED TO THIS PROJECT.

· IF THE CONTRACTOR AND THE VA AGREE TO OTHER

METHODS OF REPAIR FOR THE WALL THAT ACCOMMODATES

EXCAVATION AND INSTALLATION OF UST 8, WITH THE SAME

RESULTS AND QUALITY AS WORK SHOWN ON THIS PLAN, THE

VA IS TO INITIATE/CONCUR FOR ALLOWANCE FOR LESSER

EFFORT.

08/28/2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

/1 5/

1:

:0

AM

BID DOCUMENTSOffice of Construction and Facilities Management

U.S.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .