Attach. 5 Submittal Register.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Hangar Door, Multi
- Solicitation number
- FA663326Q0004
About this file
This is a Submittal Register, a tracking document that outlines the contractor's required submissions and the government's approval processes for the Sustain Hangar Doors, Multi project at Minneapolis Air Reserve Station. The register establishes a structured framework for managing submittals throughout the project lifecycle, from preconstruction through closeout phases.
The document specifies submittals organized by Construction Specification (CSI) division codes, including Division 01 (General Requirements), Division 02 (Existing Conditions), and Division 09 (Finishes). Key preconstruction submittals required include a Submittal Register, Construction Waste Management Plan, Competent Person Training Certification, Lead Waste Management Plan, and Lead Compliance Plan, with written evidence of Transportation, Storage, and Disposal (TSD) approval. Product data submittals encompass Product Data Sheets, color samples, manufacturer's application instructions for mixing, and Safety Data Sheets. Closeout submittals include a Final Construction Waste Diversion Report and Hazardous Waste Manifests with supporting documentation or weight tickets. Each submittal entry references corresponding specification paragraphs and identifies the governing authority responsible for approval, establishing clear accountability and coordination channels between the contractor and approving authorities throughout the project's execution and completion phases.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA663326Q0004.pdf | ||
| 4-Wage Determination.pdf | ||
| 1-Statement Of Work.pdf | ||
| 2-Specifications.pdf | ||
| 3-Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| Sustain Hangar Doors, Multi | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 33 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Submittal Register | 1.7 | G | ||||||||||||||||
| 01 74 19 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Waste Management | 1.5 | G | ||||||||||||||||
| Plan | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Final Construction Waste | 1.7 | G | ||||||||||||||||
| Diversion Report | ||||||||||||||||||
| 02 83 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Competent Person | 1.5.1.1 | G | ||||||||||||||||
| Training Certification | 1.5.1.2 | G | ||||||||||||||||
| Lead Waste Management Plan | 1.5.2.6 | G | ||||||||||||||||
| Lead Compliance Plan | 1.5.2.2 | G | ||||||||||||||||
| Written Evidence of TSD | 3.4.2.1 | G | ||||||||||||||||
| Approval | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Hazardous Waste Manifest | 3.4.2.1 | G | ||||||||||||||||
| Turn-In Documents or Weight | 3.4.2.1 | G | ||||||||||||||||
| Tickets | ||||||||||||||||||
| 09 90 00 | SD-03 Product Data | |||||||||||||||||
| Product Data Sheets | 2.1 | |||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Color | 2.2 | G | ||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Application Instructions | 3.2.1 | |||||||||||||||||
| Mixing | 2.1 | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| Sustain Hangar Doors, Multi | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 09 90 00 | Manufacturer's Safety Data | 1.7.1 | ||||||||||||||||
| Sheets |
File details come from the government source that posted it. Updated .