Attach. 3.1 B710 FOCUS Floor Plans.pdf
PDF 680 KB Posted
- Attached to
- B710 Architect Design Repair Emergency Services
- Solicitation number
- FA663326QA004
About this file
This document is a facility floor plan for Building 710, an Aerial Port Training Facility located at Minneapolis-St. Paul Air Reserve Station in Minnesota. The document consists of two sheets showing the layout of Floor 1 and Floor 2, each with detailed room designations and square footage measurements.
Floor 1 contains 12,303 User NSF (Net Square Feet) across multiple functional areas including three Aerial Delivery spaces (100-1, 100-2, and 113-1 totaling 5,942 SF), Equipment Staging (107-1, 1,918 SF), a Main Entry (106-1, 171 SF), mechanical and restroom facilities, stairwells, and administrative spaces such as a Command Center, First Sergeant office, and various support areas. The total NSF for Floor 1 is 12,303 SF with an overall facility NSF of 17,379 SF. Floor 2 contains 5,076 User NSF with specialized operational spaces including an Alternate EOC (551 SF), Aircrew Training Ops Center (ATOC, 388 SF), training room (401 SF), flight operations areas, equipment and supply storage, and additional Aerial Delivery space (223-1, 164 SF). The facility has a High Bay height of 20 feet and an approximate wall thickness of 2.032 feet. Total Facility Gross Square Footage is 22,686 GSF with Real Property GSF of 20,493.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
114-1 Aerial Delivery
3201 SF
112-1
JC
53 SF
103-1
CSS
211 SF
108-1 Hall
275 SF
100-3 Stairs
21 SF
113-1 Aerial Delivery
2302 SF
110-1 Mech
131 SF
105-1 Supt
131 SF
122-1 Aerial Delivery
96 SF
107-1 Equip Staging
1918 SF
119-1
RR
191 SF
106-1 Main Entry
171 SF
103-2 Hall
121 SF
109-1
1st Sgt
137 SF
100-2 Aerial Delivery
1933 SF
104-1
ATSEV
112 SF
117-2 Sec Mgr
70 SF
101-1 Stairs
83 SF
121-1 Aerial Delivery
110 SF
114-2 Stairs
159 SF
102-1
CC
132 SF
100-1 Aerial Delivery
1707 SF
118-1
RR
198 SF
113-3 Hall
154 SF
100-4 Stairs
23 SF
111-1 Stairs
133 SF
117-1
UDM
70 SF
113-2 Stairs
23 SF
115-1 Mech
24 SF
116-1 Break Rm
173 SF
High Bay = 20 ft
Ü
Minneapolis-St. Paul ARS, MN
0 7 14 Feet
Floor: Sheet: of1 1 2
Date: 7/22/2020
212-1 Mech
142 SF
205-2 Load Planning
353 SF
224-1 Aerial Delivery
71 SF
204-1 Alt EOC
551 SF
213-1 Stairs
133 SF
221-1 Equip & Supplies
125 SF
215-1
PAX
172 SF
205A-2 Load Planning
44 SF
200-1
ATOC
388 SF
226-1 Mobility Stge
233 SF
203-1
APOS
122 SF
206-1 Flt CC
163 SF
211-1 Hall
69 SF
230-1 Stairs
21 SF
228-1 Stairs
37 SF
217-1 Sect Ch
221 SF
205A-1 Special Handling
44 SF
219-1 Fleet
89 SF
209-1 Trng Rm
401 SF
207-1 Ops O
168 SF
216-1 Cargo
154 SF
227-1 Hall
153 SF
218-1 Special Programs
297 SF
220-1 Stairs
120 SF
223-1 Aerial Delivery
164 SF
229-1 Stairs
13 SF
205-1 Special Handling
270 SF
202-1 Hall
745 SF
222-1 Equip & Supplies
259 SF
208-1 Hall
62 SF
210-1 Ramp
152 SF
201-1 Supt
126 SF
225-1 Mobility Stge
371 SF
214-1
MHE
138 SF
Ü
Minneapolis-St. Paul ARS, MN
0 6.5 13 Feet
Floor: Sheet: of2 2 2
Date: 7/22/2020
File details come from the government source that posted it. Updated .