Attach. 2 Water Intrusion Proposal Line Items.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- ACQ-IHS-2026-00033
About this file
This is a pricing proposal template for water intrusion and PIMC ICRA 2.0 services under solicitation ACQ-IHS-2026-00033 issued by the Indian Health Service for the Phoenix Area. The spreadsheet outlines 15 contract line items with quantities spanning a base year plus four option years (2025-2028), though all unit prices are currently blank ($0), indicating this is a template awaiting contractor pricing input.
The required services encompass comprehensive water intrusion response and remediation capabilities, including 24/7 emergency response with action plans, development and maintenance of drying logs, ICRA 2.0 assessments and permit acquisition, setup and compliance monitoring of ICRA 2.0 containment systems, site drying operations using specialized equipment, and removal of containment walls. Additional services include site visits and written recommendations from certified industrial hygienists, pre- and post-work air and surface mold and asbestos sampling and testing, daily ICRA wall rentals, skilled construction labor support (carpenters, plumbers, electricians), asbestos flooring and mastic abatement, ceramic tile with lead-containing glazing abatement, and provision of parts, tools, and construction materials. Quantities indicate significant scope, with items ranging from 20 to 3,000 units across various measurement types (EA, Days, HRS, SF, and lump sum dollars), suggesting this is a requirements-based contract for facilities maintenance and emergency remediation services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach. 1 PIMC SOW.pdf | ||
| ACQ-IHS-2026-O-00033.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PIMC ICRA 2.0 and Water Intrusion Contract Line Items | ||||||||||||||||
| Base Year QTY | UNITS | Price / Unit | Price Total | 2025 QTY | Price / Unit | Price Total | 2026 QTY | Price / Unit | Price Total | 2027 QTY | Price / Unit | Price Total | 2028 QTY | Price / Unit | Price Total |
| 1) Initial Response Within Two Hours of Call, 24-7, Submit Action Plan, and estimate of # Days to Complete Work | 30 | EA | $ - 0 | 30 | $ - 0 | 30 | $ - 0 | 30 | $ - 0 | 30 | $ - 0 |
| 2) Develop, Implement, and Maintain Drying Log | 30 | Days | $ - 0 | 30 | $ - 0 | 30 | $ - 0 | 30 | $ - 0 | 30 | $ - 0 |
| 3) Develop and Submit ICRA 2.0 Assessment to Infection Prevention and get Approved permit if Necessary | 60 | EA | $ - 0 | 60 | $ - 0 | 60 | $ - 0 | 60 | $ - 0 | 60 | $ - 0 |
| 4) Set up ICRA 2.0 walls, and Other ICRA 2.0 Requirments (Negative Air, Ante Room, etc) as Required by Approved Permit (2-Man Crew) | 120 | Days | $ - 0 | 120 | $ - 0 | 120 | $ - 0 | 120 | $ - 0 | 120 | $ - 0 |
| 5) Daily ICRA 2.0 Compliance Visits (Negative Pressure Log, Particualte Count Log, adjacent Room Pressure Log, etc) | 300 | Days | $ - 0 | 300 | $ - 0 | 300 | $ - 0 | 300 | $ - 0 | 300 | $ - 0 |
| 6) Dry the Site per Drying Action Plan Utilizing Dehumidifiers, Air Movers, Air Injection, etc (2-Man Crew) | 75 | Days | $ - 0 | 75 | $ - 0 | 75 | $ - 0 | 75 | $ - 0 | 75 | $ - 0 |
| 7) Remove ICRA 2.0 Walls (2-Man Crew) | 80 | Days | $ - 0 | 80 | $ - 0 | 80 | $ - 0 | 80 | $ - 0 | 80 | $ - 0 |
| 8) Site Visit from Certified Industrial Hygeinist with MRS Certification and Estimate # Hours Needed to Provide Written Recommendation | 20 | EA | $ - 0 | 20 | $ - 0 | 20 | $ - 0 | 20 | $ - 0 | 20 | $ - 0 |
| 9) Certified Industrial Hygeinest Written Recommendation | 100 | HRS | $ - 0 | 100 | $ - 0 | 100 | $ - 0 | 100 | $ - 0 | 100 | $ - 0 |
| 10) Pre and Post Work Air and Surface Mold and Asbestos Sampling and Testing | 50 | EA | $ - 0 | 50 | $ - 0 | 50 | $ - 0 | 50 | $ - 0 | 50 | $ - 0 |
| 11) ICRA Wall Daily Rental | 500 | Days | $ - 0 | 500 | $ - 0 | 500 | $ - 0 | 500 | $ - 0 | 500 | $ - 0 |
| 12) Provide Skilled Construction Labor (Carpenter, Plumber, Electrician, etc) to assist with Renvoation work Inside ICRA 2.0 Walls | 1000 | HRS | $ - 0 | 1000 | $ - 0 | 1000 | $ - 0 | 1000 | $ - 0 | 1000 | $ - 0 |
| 13) Abate Asbestos Flooring and Mastic per OSHA Requirements | 3000 | SF | $ - 0 | 3000 | $ - 0 | 3000 | $ - 0 | 3000 | $ - 0 | 3000 | $ - 0 |
| 14) Abate Ceramic Tile with Lead Containing Glazing (Low Levels) per OSHA Requirements | 3000 | SF | $ - 0 | 3000 | $ - 0 | 3000 | $ - 0 | 3000 | $ - 0 | 3000 | $ - 0 |
| 15) Provide Parts, Tools, and Construciton Materials as Needed to Meet Contractor Responsibilities and Tasks | 25,000 | $ | $ - 0 | 25,000 | $ - 0 | 25,000 | $ - 0 | 25,000 | $ - 0 | 25,000 | $ - 0 |
Base TOTAL: $ - 0 OY 1 TOTAL: $ - 0 OY 2 TOTAL: $ - 0 OY 3 TOTAL: $ - 0 OY 4 TOTAL: $ - 0