Attach D- Green Knob Fire Tower 2024 Rehab SOI Final.pdf

PDF 88 KB Posted

Attached to
Green Knob Fire Tower Rehab-Pigsah National Forest
Solicitation number
12445224R0018
Issued by

About this file

This document is a schedule of items for the Green Knob Fire Tower Rehabilitation project in the Appalachian Ranger District of Pisgah National Forest. The project requires the contractor to furnish all labor, materials, equipment, and other incidentals necessary to perform the work listed in the schedule, which includes replacing the tower door and hardware, installing a chainlink security panel, replacing deteriorated exterior wood deck and railing components, painting the exterior of the tower, deck, and railing, and replacing the tower windows.

The relevant federal contract opportunity is Solicitation Number 12445224R0018, which is a request for proposal for the Green Knob Fire Tower Rehab project. A site visit is scheduled for April 26, 2024 at 10:00 am EST, and questions are due by April 30, 2024 at 2:00 pm EST. Contractors are required to submit their construction experience on the attached "Construction Experience Data Sheet" for evaluation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAY ITEM

NO.

DESCRIPTION EST.

QTY.

UNIT OF

MEASURE

PAY

UNIT TOTAL PRICE

1 Mobilization 1 LSQ LS $

Replace Tower Door and Hardware. (This line item includes demolition, repair, prep, trim, installation, sealant/caulk, painting, and cleanup).

1 LSQ LS $

Install Chain‐Link Security Panel (This line item includes supporting wood bracket, chain‐link panel installation and painting).

1 LSQ LS $

Replace deteriorated exterior wood deck and railing components as indicated. (This line item includes demolition, repair, prep, installation, painting, and cleanup).

1 LSQ LS $

Paint Exterior of Tower, Deck and Railing. (This line item includes cleaning, prep, caulking, filling holes, and cleanup).

1 LSQ LS $

PAY ITEM

NO.

DESCRIPTION EST.

QTY.

UNIT OF

MEASURE

PAY

UNIT TOTAL PRICE

Replace Tower Windows. (This line item includes demolition, repair, prep, flashing, trim, installation, sealant/caulk, painting, and cleanup).

15 LSQ LS $

Alternate 1 Bid Schedule

TOTAL PRICE FOR ALL BASE BID ITEMS

Pisgah National Forest

Yancey County

SCHEDULE OF ITEMS

GREEN KNOB FIRE TOWER REHABILITATION

Appalachian Ranger District

Base Bid Schedule

TOTAL PRICE FOR ALL BASE + ALTERNATE BID ITEMS

File details come from the government source that posted it. Updated .