Attach 6 Pricing.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Corrosion Control Facility Industrial Environmental Control and Filtration System Maintenance Federal contract opportunity
Solicitation number
FA282322QA016
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document contains a pricing spreadsheet and solicitation for corrosion control facility maintenance services. Offerors are required to complete unit pricing and hourly labor rates in the spreadsheet for preventative maintenance and additional services for corrosion control paint booths at Eglin Air Force Base from 2022 to 2027. The solicitation was issued by the Department of the Air Force Materiel Command Test Center to conduct site visits on March 28th, with questions due by April 4th and quotes due by April 13th, 2022.

View the file

Other files for this federal contract opportunity

Other files attached to Corrosion Control Facility Industrial Environmental Control and Filtration System Maintenance, newest first.
File Type Posted
RFQ FA282322QA016 AM6.pdf PDF
Site Visit MFR.pdf PDF
RFIs 28 Mar 22.pdf PDF
RFQ FA282322QA016 AM3.pdf PDF
RFQ FA282322QA016 AM2.pdf PDF
RFIs 14 Mar 22.pdf PDF
RFQ FA282322QA016 AM1.pdf PDF
Attach 7 Reps.pdf PDF
Attach 8 PPQ.pdf PDF
Attach 5 SV Location Map.pdf PDF
Attach 4 Historical Repair Data.pdf PDF
Attach 3 WD.pdf PDF
RFQ FA282322QA016.pdf PDF
Attach 2 QASP 22 Nov 21.pdf PDF
Attach 1 PWS 22 Nov 21.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Fillable CellWill Calculate AutomaticallyLocked Cell
1. Offerors are to complete the unit prices in column E of the worksheet titled " Section B".

2. Offerors are to complete their hourly labor rate for each year in column G of the worksheet titled "Section B". * The hourly labor rate is for the price of 1 Tech (fully burdened).

3. Offerors are to add their tech's location in Cell D2 of the worksheet titled "TEP". This will be used for the repair authorizations on CLINs XX02.

4. In cell E2 of the worksheet titled "TEP" Offerors are to add the number of miles from the location identified in cell D2 to Eglin AFB, FL. The mileage will be verified using Google maps. *If awarded the contract this will be the location the technicians will be deployed from, unless there is a closer technician. The use of a technician from further than the location cited in cell D2 will only be permitted under extenuating circumstances and will be discussed during the repair authorization process.

TOTAL EVALUATED PRICE = Sumation of the monthly service CLINS for each year (to include the 6 month extension based on Option Year 4 prices) + the labor rate for each year (to include the 6 month extension based on Option Year 4 prices) + the mileage multiplied by the current Privately Owned Vehicle (POV) reimbursement mileage rate.

Section B

BASE YEAR (01 May 2022 - 30 April 2023)
CLINDescriptionQtyUnit of IssueUnit PriceExtended PriceHourly Labor Rate

(1 Tech)

0001Preventative Maintenance Program for Corrosion Control Paint Booths in accordance with (IAW) the Performance Work Statement (PWS) dated 22 November 2021.12Months$0.00
0002Additional/Miscellaneous IAW the PWS dated 22 November 2021. This is a Not To Exceed CLIN. All maintenance not associated with the preventative program (ie component replacement due to failure) will be covered under this CLIN. Once a problem is identified the Vendor will notify the Government and provide a quote for repair. The Vendor will not perform repair unless directed by the Contracting Office.1JobNTE$35,000.00
OPTION YEAR 1 (01 May 2023 - 30 April 2024)
CLINDescriptionQtyUnit of IssueUnit PriceExtended PriceHourly Labor Rate

(1 Tech)

1001Preventative Maintenance Program for Corrosion Control Paint Booths in accordance with (IAW) the Performance Work Statement (PWS) dated 22 November 2021.12Months$0.00
1002Additional/Miscellaneous IAW the PWS dated 22 November 2021. This is a Not To Exceed CLIN. All maintenance not associated with the preventative program (ie component replacement due to failure) will be covered under this CLIN. Once a problem is identified the Vendor will notify the Government and provide a quote for repair. The Vendor will not perform repair unless directed by the Contracting Office.1JobNTE$35,000.00
OPTION YEAR 2 (01 May 2024 - 30 April 2025)
CLINDescriptionQtyUnit of IssueUnit PriceExtended PriceHourly Labor Rate

(1 Tech)

2001Preventative Maintenance Program for Corrosion Control Paint Booths in accordance with (IAW) the Performance Work Statement (PWS) dated 22 November 2021.12Months$0.00
2002Additional/Miscellaneous IAW the PWS dated 22 November 2021. This is a Not To Exceed CLIN. All maintenance not associated with the preventative program (ie component replacement due to failure) will be covered under this CLIN. Once a problem is identified the Vendor will notify the Government and provide a quote for repair. The Vendor will not perform repair unless directed by the Contracting Office.1JobNTE$35,000.00
OPTION YEAR 3 (01 May 2025 - 30 April 2026)
CLINDescriptionQtyUnit of IssueUnit PriceExtended PriceHourly Labor Rate

(1 Tech)

3001Preventative Maintenance Program for Corrosion Control Paint Booths in accordance with (IAW) the Performance Work Statement (PWS) dated 22 November 2021.12Months$0.00
3002Additional/Miscellaneous IAW the PWS dated 22 November 2021. This is a Not To Exceed CLIN. All maintenance not associated with the preventative program (ie component replacement due to failure) will be covered under this CLIN. Once a problem is identified the Vendor will notify the Government and provide a quote for repair. The Vendor will not perform repair unless directed by the Contracting Office.1JobNTE$35,000.00
OPTION YEAR 4 (01 May 2026 - 30 April 2027)
CLINDescriptionQtyUnit of IssueUnit PriceExtended PriceHourly Labor Rate

(1 Tech)

4001Preventative Maintenance Program for Corrosion Control Paint Booths in accordance with (IAW) the Performance Work Statement (PWS) dated 22 November 2021.12Months$0.00
4002Additional/Miscellaneous IAW the PWS dated 22 November 2021. This is a Not To Exceed CLIN. All maintenance not associated with the preventative program (ie component replacement due to failure) will be covered under this CLIN. Once a problem is identified the Vendor will notify the Government and provide a quote for repair. The Vendor will not perform repair unless directed by the Contracting Office.1JobNTE$35,000.00

TEP

Base Year CLIN 0001$0.00Location of Tech (City, State)# of Miles to Eglin AFBCurrent POV Mileage Rate
Option Year 1 CLIN 1001$0.00$0.585
Option Year 2 CLIN 2001$0.00SUM$0.00
Option Year 3 CLIN 3001$0.00
Option Year 4 CLIN 4001$0.00
6 Month Extension$0.00
Base Year Labor Rate$0.00
Option Year 1 Labor Rate$0.00
Option Year 2 Labor Rate$0.00
Option Year 3 Labor Rate$0.00
Option Year 4 Labor Rate$0.00
6 Month Extension Labor Rate$0.00TEP:$0.00
SUM$0.00

File details come from the government source that posted it. Updated .