Attach 5 - Price List.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Emergency Cleaning BPA
- Solicitation number
- FA860124Q0070
About this file
This document is a price list for Routine Clean-Ups and Large-Scale Remediation/Restoration services under a federal contract opportunity, Solicitation FA860124Q0070 for Emergency Cleaning BPA.
The price list provides unit pricing for various square footage ranges of routine emergency clean-ups for carpet, VTC, concrete, ceramic tile, laminate, and wood surfaces, with separate pricing for clear/gray water and black water incidents. It also includes hourly labor rates for project management, technical, and administrative support, as well as per-call/per-day pricing for equipment and chemicals. The solicitation is a 100% small business set-aside with a closing date of May 15, 2024, and is expected to result in a Blanket Purchase Agreement (BPA) for commercial emergency cleaning and restoration services. The Performance Work Statement is provided as an attachment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs and Responses .xlsx | XLSX spreadsheet | |
| RFIs and Responses .xlsx | XLSX spreadsheet | |
| Attach 2- Instruction To Offerors- Emerg Cleaning.pdf | ||
| Attach 3- 52.212-2 Addendum to Evaluation Factors.pdf | ||
| Attach 1- PWS Emergency Cleanup.pdf | ||
| Synopsitation - FA860124Q0070.pdf | ||
| Attach 4- Wage Determination No. 2015-4731 Rev 22, Dated 12-26-2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Routine Clean-Ups
| FA860124Q0070 | ||||
| Attachment 5 | ||||
| Routine Every Day Clean-ups | ||||
| Regular Hours Pricing | Afterhours and Holidays | |||
| CARPET, VTC, CONCRETE, CERAMIC TILE, LAMINATE, WOOD | Clear/Gray Water | Black Water | Clear/Gray Water | Black Water |
| Minimum Charge |
| Routine emergency clean-ups 1-25 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 26-50 sq ft (consisting of all equipment required to perform duties,all personnel & all chemicals) |
| Routine emergency clean-ups 51-75 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 76-100 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 101-125 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 126-150 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 151-175 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 176-200 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 201-225 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 226-250 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 251-275 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 276-300 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 301-325 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 326-350 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 351-375 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 376-400 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 401-425 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 426-450 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 451-475 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 476-500 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 501-600 sq ft (consisting of all equipment required to perform duties,all personnel & all chemicals) |
| Routine emergency clean-ups 601-700 sq ft (consisting of all equipment required to perform duties,all personnel & all chemicals) |
| Routine emergency clean-ups 701-800 sq ft (consisting of all equipment required to perform duties,all personnel & all chemicals) |
| Routine emergency clean-ups 801-900 sq ft (consisting of all equipment required to perform duties,all personnel & all chemicals) |
| Routine emergency clean-ups 901-1000 sq ft (consisting of all equipment required to perform duties,all personnel & all chemicals) |
| Routine emergency clean-ups 1001-1100 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 1101-1200 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 1201-1300 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 1301-1400 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 1401-1500 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 1501-1600 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 1601-1700 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 1701-1800 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 1801-1900 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 1901-2000 sq ft (consisting of all equipment required to perform duties, personnel & chemicals) |
| Routine emergency clean-ups 2001-2100 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 2101-2200 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 2201-2300 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 2301-2400 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
| Routine emergency clean-ups 2401-2500 sq ft (consisting of all equipment required to perform duties, all personnel & all chemicals) |
All above pricing includes all labor, materials and equigment required to complete the work.
| Pricing | |
| Mold Inhibitor fogging Per Sqaure Foot Surface* | $0.25 |
*For Routine Clean Ups: if, in the contractor's professional opinion, Mold Inhibitor is required, the contractor shall contact the CE Caller or the Contracting Officer to obtain clearance to proceed.
** Afetr Hours and Weekends is recognized as any work performed after 5 PM Monday through Friday and any work performed on a Saturday or Sunday.
*** Recognized Holidays are the following: New Years Day, Martin Luther King Day, Presidents Day, Memorial Day, Idependence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.
Large Scale Clean-Up
| Labor Category | UOI | Regular Time | After Hours and Weekends | Holiday |
| Project Manager | Per Hour | |||
| Foreman | Per Hour | |||
| Field Technician | Per Hour | |||
| Administrative Clerk (Office) | Per Hour | |||
| Skilled Laborer (Experienced Restoration) | Per Hour | |||
| General Laborer | Per Hour |
| Equipment | Pricing Per Hour |
| Mobile Extractor | Per Call Per Day |
| Mobile Carpet Cleaner | Per Call Per Day |
| Truck Mounted Extractor | Per Call Per Day |
| Floor Scrubber (manual) | Per Call Per Day |
| Floor Scrubber (self contained) | Per Call Per Day |
| Air mover | Per Call Per Day |
| Fan (axial) | Per Call Per Day |
| Dehumidifier | Per Call Per Day |
| Airless Sprayer | Per Call Per Day |
| Sprayer (Pump) | Per Call Per Day |
| Portable Pump | Per Call Per Day |
| Generator (Portable) | Per Call Per Day |
| Work Van | Per Call Per Day |
| Box Truck/Trailer | Per Call Per Day |
| Pick Up Truck | Per Call Per Day |
| Mobile Command Post | Per Call Per Day |
| 19' Scissor Lift Mobilization Unit | Per Call Per Day |
| Chemicals | UOI |
| Carpet Shampoo | Gallon |
| Defoamer | Gallon |
| Sporicidin | Gallon |
| Benefect Disinfectant | Gallon |
| Enzyme Solution | Gallon |
| Clear Shell (Mold inhibitor) | Gallon |
| Air Mask (Lemon) | Gallon |
| Air Mask (Cedar) | Gallon |
| Floor Protection (Roll) | Roll |
| Pricing | |
| Mold Inhibitor per Sqaure Foot Surface | |
| Carpet Cleaning per Square Foot Surface | |
| HVAC System and Ductwork Interior Cleaning and Sanitation |
Historical Data
| ROUTINE CLEAN-UPS | |||||
| FY | Carpet | Tile | Conc., Other | No. Calls Costing Less Than $2,500 | No. Calls Per Year |
| 18 | 47 | 21 | 67 | 68 -- So Far | |
| 17 | 45 | 35 | 73 | 80 | |
| 16 | 64 | 36 | 98 | 100 | |
| 15 | 52 | 39 | 89 | 91 | |
| LARGE SCALE REMEDIATION/RESTORATION | |||||
| FY | Job # | Description of work | |||
| 17 | 1 | Extracation of approximately 11 ft. of standing grey water in basement of facility | |||
| 2 | Extract flood water from restrooms, and stairwell floors and sanitize in lower lower level of facility | ||||
| 3 | Extraction of standing grey water, Removal and disposal of dry wall damage in basement and bathrooms of two adjourning bldgs. | ||||
| 18 | 1 | Remediation of standing black water in the basement of a building |
File details come from the government source that posted it. Updated .