Attach 5_KTR Work Surveillance - ICS_18 Sep 19.pdf

PDF 96 KB Posted

Attached to
Robins Hazardous Waste Removal and Disposal Federal contract opportunity
Solicitation number
SP450023R0004
Issued by
Defense Logistics Agency

About this file

This solicitation seeks proposals for hazardous waste removal and disposal services. Offerors are requested to provide removal, transportation, and disposal of RCRA hazardous wastes, non-RCRA wastes, state-regulated wastes, universal wastes, compressed gases, and PCBs located within a 50-mile radius of various pickup points in Georgia. The base period of performance is 30 months from February 2023 to August 2025, with an optional 30-month extension. Proposals are due by December 12, 2022 and the solicitation is set aside 100% for small businesses. The Defense Logistics Agency is the contracting agency. Services required include vacuum truck hazardous material removal, power washing, liquid transfer pumping, and appropriate PPE and tools. The contractor work surveillance checklists included are templates to monitor contractor performance at work sites.

View the file

Other files for this federal contract opportunity

Other files attached to Robins Hazardous Waste Removal and Disposal, newest first.
File Type Posted
Combo Notice 8Dec2022.pdf PDF
SF30 Amendment 0001_8Dec22.pdf PDF
Attach 8_Instructions to Offerors.pdf PDF
Attach 3_R1_Robins_PUP_Aug22.xlsx XLSX spreadsheet
Combo Notice 28Oct2022.pdf PDF
Attach 2_PWS_27Oct22.pdf PDF
Attach 7_Contract Terms and Conditions.pdf PDF
Attach 10 - Evaluation.pdf PDF
Attach 1_Price Sched_3AUG22R3.xlsx XLSX spreadsheet
Attach 4_CAC Application Process.pdf PDF
Attach 6_KTR Work Surveillance - ROB_18 Sep 19.pdf PDF
Attach 9_Past Performance Questionnaire.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Work Surveillance Checklist

Industrial Cleaning Services (ICS) – CLINs 1002SV-1004SV & 1007SV-1009SV

Date(s) of Work Surveillance: _________________ Start Time: ___________ Stop Time: ___________

Name of Designated Government Representative: ___________________________________________

Title of Designated Government Representative: ____________________________________________

Phone Number of Designated Government Representative: (______) ________-___________

Yes No N/A Description of Contractor Work Surveillance

Did the work crew arrive on site at the scheduled time and date?

Did the crew arrive on site with all of the requisite equipment, including

- One standard vacuum truck (3,500-gal capacity) w/ 300 feet of hoses,

- One self-contained heated power washing unit,

- One liquid transfer pump w/ 300 feet of hoses, and

- All appropriate PPE and tools?

Did the vacuum truck driver provide a weight ticket showing the empty (tare) weight of the vacuum truck?

Was the vacuum truck inspected by a designated Government representative prior to use?

Did the vacuum truck arrive with a clean tank and hose fittings that were constructed of material that that was chemically compatible with the waste to be removed?

Did the vacuum truck arrive free of visible waste residue unless the truck was being used for multiple removals from the same project involving the same waste stream

(in which case it arrived as meeting definition of RCRA empty per 40 CFR 261.7)?

Did all of the equipment operate properly without causing delay in work?

Was the work performed to the satisfaction of the designated Government representative?

Comments:

Signature of Designated Government Representative Date

File details come from the government source that posted it. Updated .