Attach 4 Price Matrix.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 36C24825R0034
About this file
This is a pricing matrix template for the Refresh Hemodialysis Project (#516-23-117) at C.W. Young VA Hospital in St. Petersburg, FL. The spreadsheet is structured to capture detailed cost breakdowns across 23 construction divisions including general requirements, concrete, masonry, electrical, HVAC, and other building systems. The template requires offerors to separately list labor and material costs for each division, with calculations for overhead, profit, and bond percentages. The form is blank with no costs filled in, serving as a standardized format for contractors to submit their detailed price proposals to the Department of Veterans Affairs for this bid-build construction project.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Base Offer Cost Breakdown
| Project Number: | 516-23-117 | Date: | ||
| Project Title | Bid-Build Refresh Hemodialysis | |||
| Project Location | C.W Young VA Hospital, St Petersburg, FL | |||
| Offeror Name | ||||
| Offeror Street | ||||
| Offeror City | State | Zip |
| Item | Description | Labor Cost | Material Cost | Total Cost |
| Division 1 | General Requirements | $- | $- | $- |
| Division 2 | Existing Conditions | - | - | - |
| Division 3 | Concrete | - | - | - |
| Division 4 | Masonry | - | - | - |
| Division 5 | Metals | - | - | - |
| Division 6 | Wood and Plastic | - | - | - |
| Division 7 | Thermal & Moisture Protect | - | - | - |
| Division 8 | Doors and Windows | - | - | - |
| Division 9 | Finishes | - | - | - |
| Division 10 | Specialties | - | - | - |
| Division 11 | Equipment | - | - | - |
| Division 12 | Furnishings | - | - | - |
| Division 13 | Special Construction | - | - | - |
| Division 14 | Conveying Equipment | - | - | - |
| Division 21 | Fire Suppression | - | - | - |
| Division 22 | Plumbing | - | - | - |
| Division 23 | HVAC | - | - | - |
| Division 26 | Electrical | - | - | - |
| Division 27 | Communications | - | - | - |
| Division 28 | Electronic Safety & Security | - | - | - |
| Division 31 | Earthwork | - | - | - |
| Division 32 | Exterior Improvements | - | - | - |
| Division 33 | Utilities | - | - | - |
| Division 34 | Transportation Subtotal | - | - | - |
| Division Subtotals : | $- | $- | $- |
| Overhead % | 0.00% | - |
| Profit % | 0.00% | - |
| Bond % | 0.00% | - |
| Overhead/Profit Subtotals : | $- |
Total Price $- $- $-
File details come from the government source that posted it. Updated .