Attach 4 - PM - LEVELS OF MAINTENANCE.pdf

PDF 166 KB Posted

Attached to
DDAG Vertical Lift Module Preventative/Corrective Maintenance
Solicitation number
SP3300-25-Q-0019
Issued by

About this file

This document outlines the preventive maintenance (PM) levels and schedule requirements for Modula Inc's vertical lift module systems.

The maintenance program consists of four levels: Level 1 requires annual maintenance or service every 15,000 missions by certified technicians performing inspections, calibration, lubrication, and adjustments. Levels 2-4 involve parts replacement at specific intervals: Level 2 occurs every 30,000 missions replacing sprockets, chains, pawls, guides and door parts; Level 3 occurs every 45,000 missions replacing wheel-tubes and external bay slides; and Level 4 occurs every 150,000 missions replacing major components including vertical belts, pulleys, e-chains, cradle movement cables, motors, and gear motors. The document appears to be part of a maintenance service solicitation (SP3300-25-Q-0019) for the Defense Logistics Agency Distribution.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVENTIVE MAINTENANCE LEVELS

Annual LVL 1 PM Maintenance The Scheduled LVL 1 Maintenance recommended by MODULA INC must be performed at least ONE a YEAR and not beyond No. 15,000 Missions.

During the LVL 1 PM the Certified Technicians will perform all routine inspections, calibration, lubrication, and adjustment activities to ensure the proper operation and increase the longevity of the machines.

Level 2,3,4 - PM parts replacement

The Maintenance KIT replacement program is design to ensure to the machine the proper operation during the years and to max its longevity, replacing some consumable parts at certain time.

• PM LVL 2 Every 30,000 missions (Replace Sprocket, Chains, Pawls, Guides, and Door parts if it is present)

• PM LVL 3 Every 45,000 missions (Replace Wheel-tubes, and external bay slides if an EB is present)

• PM LVL 4 Every 150,000 missions (Replace Vertical Belt, Vertical Pulleys, Vertical E-Chain, Cradle Movement

Cables, Motors, Gear motors)

Slide Number 1

File details come from the government source that posted it. Updated .