Attach 4 EXTRACT of Aviano Masterspecs 2020.pdf
PDF 2 MB Posted
- Solicitation number
- FA568221R0010
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AVIANO MASTER SPECIFICATIONS - 2020
INDEX
01100 GENERAL CONDITIONS
01101 PROJECT SIGN
02220 SITE DEMOLITION
02231 CLEARING AND GRUBBING
02315 EXCAVATION AND FILL
02510 WATER DISTRIBUTION
02530 SANITARY SEWAGE
02551 NATURAL GAS DISTRIBUTION
02579 PRECAST CONCRETE PAVING BLOCKS FOR SIDEWALKS
02630 STORM DRAINAGE
02722 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT
02724 AGGREGATE BASE COURSE AND SAND SUBBASE COURSE
02741 BITUMINOUS CONCRETE PAVEMENT
02749 HOT-MIX ASPHALT (HMA) FOR AIRFIELDS
02751 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS
02761 PAVEMENT AND AIRFIELD MARKING
02762 JOINTS, REINFORCEMENT, AND MOORING EYES IN CONCRETE PAVEMENTS
02821 CHAIN LINK FENCES AND GATES
02921 TURF
02930 EXTERIOR PLANTS
02935 LANDSCAPE MAINTENANCE
03300 CAST-IN-PLACE CONCRETE
03401 HOLLOW SLAB SYSTEM
03450 ARCHITECTURAL PRECAST CONCRETE
04200 MASONRY
04405 NATURAL STONE WORK
05120 STRUCTURAL STEEL
05310 STEEL DECKS
05500 METAL FABRICATIONS
06100 ROUGH CARPENTRY
07112 BITUMINOUS DAMPPROOFING
07214 BOARD INSULATION
07220 07230
ROOF INSULATION
ROOF WATERPROOFING MEMBRANES
07231 WALL INSULATION
07240 EXTERIOR INSULATION AND FINISH SYSTEM
07321 CLAY ROOFING TILES
07600 FLASHING AND SHEET METAL
07840 FIRE STOPPING
07920 JOINT SEALANTS
08110 STEEL DOORS AND STEEL FRAMES
08120 ALUMINUM DOORS AND FRAMES
08210 WOOD DOORS
08331 ROLLING SERVICE GRILLS
08520 ALUMINUM WINDOWS
08800 GLAZING
09100 METAL SUPPORT ASSEMBLIES
09212 EXTERIOR STUCCO
09220 INTERIOR PLASTER
1545278690U Rectangle
1545278690U Rectangle
Section 01100 1
SECTION 01100
GENERAL CONDITIONS
PART 1 – APPLICABLE NORMS
1.1 The Italian norms for construction works and the instructions of materials suppliers shall be strictly observed for the execution of the works. In addition, contractor shall observe the following norms:
a. UNI-EN-ISO Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system and electrical system.
b. C.N.R.; ASTM; AASHTO norms – Aggregates, bitumen, bituminous mixtures and road works in general.
c. Legislative Decree No. 81 dated 9 April 2008.
d. CEI norms in force at tender date.
e. UNEL norms in force at tender date.
f. ENPI norms in force at tender date.
g. NEC norms in force at tender date.
h. AFI 91-202 Safety Program Management.
i. AFMAN 91-203 Air Force Occupational Safety, Fire, and Health Standards.
j. U.F.C. norms in force at tender date
k. U.F.G.S. norms in force at tender date
l. DPR (Italian Presidential Decree) 177/11, norms on working in confined spaces.
m. FVG Regional Law 24/2015 on Permanent Fall Protection Devices
n. Environmental Regulations. Please refer to Attachment #5 at the end of this document for the list of fundamental environmental regulations contractor shall observe in order to comply with the US and Italian norms.
o. Other norms applicable to the specific project.
Manuals and regulations will be available for review at the Engineering Office, Bldg. 407 of Aviano Air Base, during normal working hours, from Monday to Friday, from 0800 to 1700
Section 01100 2 hrs. Further clarifications regarding the type of materials and the work specified in the Schedule to Work items or indicated in the drawings, will be provided during the site survey scheduled prior to the submittal of proposal.
1.2 HAZMAT HOUSEKEEPING
Prior to bringing any hazardous material into the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
Safety Data Sheets: The Contractor shall furnish English language versions of the Safety Data Sheets (SDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEIE for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the SDS form to the Contractor.
Hazardous Waste Management Plan: The Contractor shall provide a hazardous waste management plan.
Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEIE office.
Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers. Related data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEIE through the Director of Works.
1.3 SAFETY AND HEALTH
Contractor's activities shall be in compliance with the following: OSHA 29 CFR 1926 Construction Regulations, US Corps of Engineers Manual EM385-1-1 Nov. 2014, AFMAN 91-203 Air Force Occupational Safety, Fire, and Health Standards, and Italian Legislative Decree 81/08 including subsequent amendments: in case of any differences, the more stringent applies.
An appointed professional shall develop a site-specific safety plan (PSC - Piano di Sicurezza e Coordinamento), in accordance with Italian Legislative Decree 81/08). PSC is considered equivalent to the Accident Prevention Plan required by Manual USACE EM385-1-1.
Contractor shall consider the interference hazard in advance through a preliminary assessment plan: the DUVRI - Documento Unico per la Valutazione Rischi da Interferenze shall be coordinated with 31 FW/CCPP Base employees safety representative (Phone 0434 30 5709), in accordance with Legislative Decree 81/08.
Contractor shall develop a site-specific plan for operational safety (POS - Piano Operativo di Sicurezza) in accordance with Legislative Decree 81/08, prior to starting planned work activities. Employees training certificates shall be included in the POS documents.
Contractor’s design submittals may also include, as necessary, an Elaborato Tecnico della Copertura (Roof Fall Protection Operational Manual - ROM) in accordance with Friuli Venezia Giulia Regional Law 24, 16 Oct 2015, on mandatory directions for permanent fall protection measure on roofing systems. Mentioned submittal package is subjects to 31 CES/CEOER’s approval in coordination with 31FW/SEG.
Section 01100 3
Contractor’s activities connected with maintenance of Base facilities and infrastructures shall be in compliance with OSHA 29 CFR 1910 General Industry regulations. For maintenance, surveys, repairs and plants installation requiring access to roof structures, activities shall be executed in accordance with OSHA 1910.28(b)(9)(i)(D) on fall arrest systems for fixed ladders, and Friuli Venezia Giulia Regional Law 24/2015 for mandatory directions on permanent fall protection measures on roofing systems.
Contractor’s activities connected with construction, installation, maintenance and repairs of systems, equipment, tools and machinery (including parts, accessories and appurtenances) covered by European Machinery Directive 2006/42/EC shall be performed so as to maintain current compliance with mentioned directive. Machinery control logs shall be duly signed after each repair or maintenance operation by a certified Contractor’s representative.
Recertification processes, revamping or retrofitting of systems, equipment, tools and machinery (including parts, accessories and appurtenances) shall be performed in accordance with European Machinery Directive 2006/42/EC. Related compliance certificates shall be duly signed by a Contractor’s representative.
Contractor's representatives shall receive a safety briefing during the pre-performance conference from Base 31 FW/SEG Occupational Safety Office. Electronic copy of POS will be provided to 31 FS/SEG (Phone 0434 30 4817).
Contractor’s activities within confined spaces are covered by OSHA 29 CFR 19.26.1200 and OSHA 29 CFR 1910.146, respectively for Construction and General Industry.
Mentioned regulations shall be coordinated with Italian Presidential Decree DPR 177, dated 14 SEP 2011. Mandatory prescriptions on confined space shall be taken into consideration at the design stage for new contracts as well as for maintenance and repair contracts.
1.4 WASTE MANAGEMENT
The contractor will be responsible for the disposal of debris from the work site. The material will be disposed of in an authorized dumping area outside the base upon completion of the work; this includes the payment of dump fees. Transportation, storage, use, and disposal of materials utilized by the contractor to perform the work shall be at the contractor's expense and the contractor shall not utilize government facilities for these purposes.
The contractor shall provide to Base Representatives one (1) copy of the “Formulario Identificazione dei Rifiuti" (so-called FIR), in compliance with Italian Legislative Decree 22/1997 and Italian Legislative Decree 152/2006.
Disposal of materials in violation of the applicable laws (i.e. Legislative Decree 152/2006 as subsequently amended and supplemented) will result in a material breach of the contract.
It shall be the responsibility of the Contractor to handle and dispose of hazardous material in the appropriate manner, as prescribed by the Italian law, governing the handling of such materials, and to provide all required documentation and related coordination to obtain the necessary authorizations. Removal, handling and disposal of hazardous materials shall be in compliance with all local and national applicable regulations. It is not allowed to wash tools in the available sinks or discharge contaminated water resulting from work into the drainage system or on the ground.
1.5 CERTIFICATION OF COMPLIANCE WITH ITALIAN LAWS
Section 01100 4
Submit the certificates of compliance in both English and Italian, grouped for facility, system and subsystem. In addition to the hard copies signed officially, include the information related to all the certifications into an editable electronic spreadsheet (CERT. DATABASE).
Refer to Attachment#1 for the template to be used.
1.5.1 Static Load Testing
The Contractor shall comply with the pertinent articles of Italian Decree 17 Jan 2018 and subsequent modifications and supplements. The Contractor shall be fully responsible for construction, supervision, static load tests, final testing, and for all costs associated with this procedure. Italian Decree 17 Jan 2018 requires the static load tests to be performed under the supervision of an engineer or architect registered on the National Professional Rolls of Italy for at least ten years (10). Prior to performing the tests, submit to the Contracting Officer the names and certified credentials of proposed testing personnel, engineer(s) or architect(s) they propose to perform the static load testing.
1.5.2 Mechanical and Electrical Work Certifications
As a condition of final acceptance of the work, the Contractor shall submit to the Contracting
Officer a certificate of compliance for all contract work certifying that all electrical and mechanical work complies with Italian Ministerial Decree 37/2007, and that the provided work is adequate and safe for the designated use.
1.5.3 Other Certifications
In addition to the certifications listed above, the Contractor shall provide all other certifications and testing required by Italian Law. Such certifications may include but are not limited to the following:
a. Certificate of approval of the grounding and lightning protection systems, in accordance to CEI Norms and Italian Presidential Decree No. 462/01.
b. Certificate of compliance for heating systems above 100,000 kcal/hr. in accordance with Italian Law No. 373 dated 30 April 1976 and N.10 dated 9 Jan 1991.
c. Certificate of compliance for fire prevention systems in accordance with
Presidential Decrees dated 01 Aug 2011.
d. Certificate for elevator systems test in accordance with Italian Law No. 1415 dated
24 October 1942.
e. Certification for Explosion Proof (ATEX) systems in accordance with European
Directive 2014/34/UE.
f. HVAC System booklet IAW Italian Ministerial Decree 10 Feb 2014.
g. Roofs Lifeline, Fall protection, access ladder certification documents as per art. 6 of FVG Regional Law 24/2015, shop drawings and maintenance booklet IAW Par.
9.1.6 of UNI EN 11158
h. All installed mechanical and electrical equipment shall have the required Italian Mark of Quality and shall conform to Italian Presidential Decree No. 459, dated 24 July 1996, with "CE" marking; relevant certificates shall be furnished to the Contracting Officer for each item of equipment installed;
Section 01100 5
i. Once NTP is issued, Contractor is required to contact CEAOR and schedule a meeting to fill FormDD1354 with appropriate project data for real property capitalization. Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out;
j. For works requiring periodical verification in accordance with Host Nation Norms, Contractor will submit all required certifications in a Technical Booklet format (“Fascicolo Tecnico”).
PART 2 – MATERIALS
2.1 All materials shown on drawings and listed in the Schedule of Work Items or anyhow necessary for the accomplishment of project will be furnished and installed by the Contractor except those shown on drawings which will be furnished and installed by the U.S.
Government and installed by the Contractor.
2.2 DEMOLITION AND REPAIR/SUSTAINMENT WORK ON EXISTING
STRUCTURES
During possible partial demolition or repair / sustainment operation of bearing structures the
Contractor shall provide for the shoring of existing structures, for the safety of personnel and building, being responsible for any accident and/or damage. Shoring will be performed in a way to assure the integral conservation of structures not to be demolished or modified.
Shoring shall be inspected by Contracting Officer’s Technical Representative prior to proceeding with any demolition work of structural elements.
2.3 REMOVED MATERIALS
The materials to be removed, (specified on drawings and/or on the Schedule of Work Items) shall be handled as follows:
2.3.1 Unsalvageable materials
Shall be transported to public dump in accordance with Italian communal norms in force. The
Contracting Officer’s Technical Representative shall determine which materials are unusable. Under no circumstances will the Contractor attempt to sell or otherwise use such material unless and until he first obtains, the necessary permits, licenses etc. from the Italian Government Officials and will hold the U.S. Government free and harmless from his failure to do so.
2.3.2 Salvageable materials
Shall be loaded, unloaded and stacked at a warehouse of Aviano Air Base. The Contracting Officer’s
Technical Representative shall determine which material is salvageable and the storage location.
Maximum distance will be 15 km.
2.3.3 Materials to be reused in the project
Shall be removed with care and stored by the Contractor on site, after inspection of operating state of such fixtures which will be done jointly with the Contracting Officer’s Technical Representative. The Contractor shall be fully responsible for preservation of such fixtures
Section 01100 6 and before their installation, in the location he shall provide for cleaning and rehabilitation work.
2.4 SELECTION OF EQUIPMENT, MATERIALS AND COLORS
The Contracting Officer’s Technical Representative will select equipment, materials and colors from among the charts and factory samples which will be submitted by the Contractor and approved by the Government in accordance with the indications of the project documents. It will be the Contracting Officer’s Technical Representative’s option to request all samples and catalogues of materials to be incorporated in the project to ensure the satisfactory and proper completion of the work. All samples shall be returned to Contractor.
2.5 SUBMITTALS
This paragraph applies only to those items not subject to the “brand name or equal” provision of the contract and listed in AF Form 3052. Within 15 days from the date of notice to proceed, or in accordance with the prescriptions given by the Contracting Officer, the Contractor shall submit to Contracting Officer’s Technical Representative’s approval the data requested by the project documents and listed in the paragraph entitled “Material Approval” in order to ascertain that the material corresponds to the technical characteristics of the project. The submittals consisting of AF Form 3000, and catalog contracts (numbers of copies are specified in the submittal register), beside the samples, will be in English or Italian with the English translation attached. The list preparation shall be coordinated with the work schedule keeping in mind that the Government needs at least 15 days for the approval. Every disapproved item shall be resubmitted following the same procedure. A copy of the AF Form 3000 and related attachments will be returned to the Contractor. No work will be started prior to obtaining the approval for the proposed material and equipment.
The approval of submittals does not relieve the Contractor of responsibility for proper application and installation of the items, of other evident or hidden defects. Shop drawings, for electric equipment shall include construction drawings, diagrams and schematics for power circuits and control circuits, and component reference list.
2.6 USE OF BRAND NAMES IN SPECIFICATIONS
Unless otherwise specifically provided on this contract, reference to any equipment, material article or patented process by trade name, make or category number shall be regarded as establishing a standard of quality and shall not be construed as limiting competition, and the Contractor may, at his option use any equipment, material, article, or process which, in the judgment of the Contracting Officer’s Technical Representative, is equal to that named. The Contractor shall furnish to the Contracting Officer’s Technical Representative all required data and samples as may be called for these technical provisions or which the Contracting Officer’s Technical Representative determines necessary for approval prior to use of the items during work performance.
2.7 “EQUIVALENT” ITEMS PROPOSED BY CONTRACTOR
If the Contractor intends to propose “brand names” different than the ones specified by U.S.
Government, he/she will clearly indicate the “equivalent” proposed item, the manufacturer, Section 01100 7 type, catalog No., etc. in the List of Equivalent Proposed Items attached to AF Form 3052 which shall be returned to the Government together with the proposal. Each equivalent item listed shall be supported by the relevant technical documentation (catalog cuts, certificates, technical descriptions, calculations, etc.) in order to prove the equivalency of the technical characteristics of the product listed in the project document. Such documentation shall also be attached to the proposal.
2.8 INFORMATION DATA
Minimum 30 days prior to the work completion date, submit a draft of the Closeout
Transmittal (attachment # 1) for Government approval. At the pre-final, provide the approved Closeout Transmittal package containing all the final closeout documentation, including revised project documents, warranty management, testing, adjusting and balancing, O&M Manuals, as-built drawings, certificates of compliance and all required reports. Final documentation shall be sent with AF Form 3000, to the 31 Contracting Office for approval.
2.8.1 Number and Type of Copies
Final documentation at Project Closeout should be delivered to 31 CES in the electronic and paper format depending on the type of document in accordance to Table 1 . In particular, all the official documents that need to be wet signed in accordance to the Italian Law should be delivered in hard copy with the original signature and stamp.
TYPE OF DOCUMENT HARD COPY
(Wet Signed)
ELEC. COPY
(CD/DVD)
Calculations Yes ( 3) Yes (2)
AS-BUILT Drawing Yes ( 3) Yes (2) Test Report Yes ( 3) Yes (2)
Declaration of Conformity Yes ( 3) Yes (2) Certificates Yes ( 3) Yes (2)
Operation and Maintenance Manual N/A Yes (2) Other …. ……
Table 1
2.8.2 Transmittal Document
The Closeout Package in the CD/DVD format shall always contain a Closeout Transmittal Document (CTD) detailing all the files which are part of the package.
Refer to attachment #1 of these specifications for the template to be used as CTD. The fields to be filled out by the Contractor are the columns listed below:
CLOSEOUT TRANSMITTAL fields to be filled by the Contractor
Column Data description B Facility Number C Type of document ( XLS, DOC,PDF,DWG…etc.)
D G=General, A=Architectural, M=mechanical, E=Electric… E Short description of the document
Section 01100 8
G Document applicable Revision H1 Number of hard copies delivered H2 Number of Electronic copies delivered I Additional Notes
Table 2
2.8.3 Naming Convention
The electronic files included in the optical disc (DVD or CD) should be named in accordance with the column “F” (Document Name) of the CTD (Closeout Transmittal). Refer to attachment #2 as an example.
2.8.4 Operation, Maintenace and Warranty Checklist
The Closeout Package should always include the Operation, Maintenance and
Warranty Checklist (O&M-W Checklist), detailing all the assets, parts and pieces of equipment installed with the specific project. Refer to attachment #3 as an example.
The Column “N” of the O&M-W Checklist shall make reference to the unique ID number of Closeout Transmittal (Column “A”).
The O&M-W Checklist shall be provided in the Closeout Package in both the electronic and pdf format.
2.8.5 Electronic Copies Labelling
The CD/DVD should have a Label showing as a minimum the Revision and Date, the Project references, number of files, transmittal front sheet and Closeout Transmittal list.
Refer to attachment # 4 as an example.
2.8.6 Pdf Files
Each manual has to be assembled into a composite electronically - indexed file. Group documents for facility, system and subsystem into individual composite bookmarked files, then create a composite manual, so that resulting bookmarks reflect the system, subsystem, and equipment names in a readily navigable file tree. Configure electronic manual to display bookmark panel upon opening file.
PART 3 – SITE CONDITIONS
3.1 WORKING HOURS
Normal working hours authorized on base, are from 0800 to 1700 hrs., Monday through
Friday. Any working hours different from the authorized hours must be previously approved by the Contracting Officer.
Section 01100 9
3.2 UTILITY CUT-OFF
When interruption of every existing utilities (gas, power, water, etc) is deemed necessary for the installation of the lines or equipment, the Contractor shall submit a written request to the Contracting Officer or his/her authorized representative for approval three (3) weeks prior to his/her scheduled starting of work. Such interruption shall not be started before receipt of the approved request, nor shall interruptions request be submitted at the end of the week (from Friday through Sunday). The request shall state the duration of interruptions and the description of work to be done.
3.3 STORAGE SHED
It will be Contractor’s option to provide one or more storage sheds to store materials and work tools. The available area, for the assembly of such shed, shall be indicated by the designated representative of the Contracting Officer’s Technical Representative. At work completion the shed shall be disassembled and the area shall be restored to its original condition.
3.4 AIRFIELD SAFETY TRAINING
The Contractor shall contact Airfield Management to receive flight line driver and airfield safety training prior to start of any work beginning on the flight line. In case a crane is required, written request will have to be submitted to the C.O. for approval at least three (3) weeks in advance prior to the planned installation.
3.5 TRANSPORTATION OF PERSONNEL AND MATERIALS
It will be the Contractor’s responsibility to transport the personnel to and from the job site and to load, transport, unload and place all supplies, materials and equipment involved in this contract.
3.6 UTILITIES
Electric power, existing grounding system and water available in the area, will be made available to the Contractor by the U.S. Government. Connections and disconnections will be at Contractor’s expense and utilities are to be restored to their original condition at no extra cost to the Government. All damages caused, if any, to the existing utilities will be repaired immediately at Contractor’s expenses, also in case that such repairs are made by Government’s personnel and as directed by the Contracting Officer’s Technical Representative. Before starting the works, the Contracting Officer will indicate the point from where water and electric power will be taken. The Contractor will be entitled to provide for himself/herself, if desired, a power generator set, at his/her own expense. The electrical characteristics of available power will be indicated in project documents.
3.7 TOILET FACILITY
Base Toilets, if available close to the site of project works, may be used by Contractor’s personnel provided there are no instructions to the contrary in the project documents.
Section 01100 10
3.8 EXCAVATIONS
The Contractor shall initiate no excavation work prior to receiving an approved AF Form
103. This form will be prepared by U.S. Government personnel.
PART 4 - LABOR
All installation and construction operations, calibrations and tests during service, etc., shall be performed in a workmanlike manner by skilled tradesmen being qualified to perform the most difficult operations pertaining to their respective craft. The use of common labor for operations normally assigned to skilled tradesmen will not be accepted.
PART 5 – DEFINITIONS
As used throughout this master specification set the terminologies used such as: project, drawings, project documents and documents mean the additional specifications. Schedule of Work Items, Drawings and other documents which compose the specific individual project to be performed and for which a proposal is solicited separately.
PART 6 - ORDER OF PRECEDENCE
In case of conflict between this master specification set and the individual project documents, the difference shall be resolved by giving precedence to the individual project documents.
Section 01100 11
ATTACHMENT #1
Section 01100 12
ATTACHMENT #2
Section 01100 13
ATTACHMENT #3
Section 01100 14
ATTACHMENT #4
Section 01100 15
ATTACHMENT #5
List of relevant Environmental Regulations.
Name Title Issue Date
Current Date
AFI32-7001 ENVIRONMENTAL MANAGEMENT 16-Apr-15 23-Aug-19
AFI32-7020
THE ENVIRONMENTAL RESTORATION
PROGRAM 7-Nov-14 18-Apr-16
AFI32-7040
AIR QUALITY COMPLIANCE AND RESOURCE
MANAGEMENT 4-Nov-14 31-Oct-19
AFI32-7042 WASTE MANAGEMENT 7-Nov-14 21-Oct-19
AFI32-7044
STORAGE TANK ENVIRONMENTAL
COMPLIANCE 18-Aug-15 22-Apr-16
AFI32-7064
INTEGRATED NATURAL RESOURCES
MANAGEMENT 18-Nov-14 22-Nov-16
AFI32-7065 CULTURAL RESOURCES MANAGEMENT 19-Nov-14 6-Oct-16
AFI32-7066
ENVIRONMENTAL BASELINE SURVEYS IN REAL
PROPERTY TRANSACTIONS 26-Jan-15 26-Jan-15
AFI32-7086 HAZARDOUS MATERIALS MANAGEMENT 4-Feb-15 4-Feb-15
AFI32-7091
ENVIRONMENTAL MANAGEMENT OUTSIDE THE
UNITED STATES 18-Mar-16 18-Mar-16
AFPD32-70
ENVIRONMENTAL CONSIDERATIONS IN AIR
FORCE PROGRAMS AND ACTIVITIES 30-Jul-18 30-Jul-18
DoDI 4715.05
Environmental Compliance at Installations Outside the United States 1-Nov-13 1-Nov-13
DoDI 4715.05-G Overseas Environmental Baseline Guidance Document 1-May-07 31-Aug-18
DoDI 4715.08
Remediation of Environmental Contamination Outside the United States 1-Nov-13 31-Aug-18
4000 Ser N00/283
Environmental Final Governing Standards, Italy, 2012 revision 2 7-Sep-12 17-Jun-15
5090 Ser N00/031
Lead Environmental Component Guidance for Remediation Processes within Italy 22-Jan-19 22-Jan-19
-- End of Section --https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7001/afi32-7001.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7020/afi32-7020.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7040/afi32-7040.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7042/afi32-7042.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7044/afi32-7044.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7064/afi32-7064.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7065/afi32-7065.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7066/afi32-7066.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7086/afi32-7086.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-7091/afi32-7091.pdf https://static.e-publishing.af.mil/production/1/saf_ie/publication/afpd32-70/afpd32-70.pdf https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/471505p.pdf?ver=2017-10-05-073242-057 https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodm/471505g.pdf https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/471508p.pdf?ver=2018-09-24-074754-847 https://cs2.eis.af.mil/sites/10040/Shared%20Documents/AFLOA%20List%20Attachments/Final%20Italy%20FGS%20September%207,%202012%20-%20Revision%202%20(June%202015)_1.pdf https://cs2.eis.af.mil/sites/10626/Aviano/Shared%20Documents/Restoration%20Cleanup/20190122%20-%20LEC%20Remediation%20Guidance%20Italy%20-%20January%202019%20(FINAL2).pdf
Section 01101 1
SECTION 01101
PROJECT SIGN
PART 1 - PROJECT SIGN
1.1 Scope
Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.
PART 2 - GENERAL
The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site.
The sign shall be 120 cm wide x 80 cm high and shall be constructed of a material suitable to withstand exposure to inclement weather for the duration of the contract, and must not show evidence of warping, cracking, or other defects. The sign shall have a blue background with white lettering, and shall contain the following information in English:
a. Project No.
b. Project description
c. Constructed under Supervision of Base Civil Engineering
d. Contracted by 31st Contracting Squadron
e. Contractor
f. Design Engineer
g. Inspector
h. Contract Management: 31 CONS Construction Flight
i. ERP Coord
Lettering of the sign will be as shown on the following sketch, and may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.
The contractor shall also provide project and safety signs in accordance with Law 81/08 and subsequent amendments (Ministerial Decree 22 Jan 2019).
Section 01101 2
-- End of Section –
Section 02751 1
SECTION 02751
CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS
PART 1 - GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 211.1 (1991) Selecting Proportions for Normal, Heavyweight, and Mass Concrete.
ACI 214 (1989) Evaluation of Strength Test Results of Concrete.
ACI 305R (1999) Hot Weather Concreting.
ACI 306R (1988) Cold Weather Concreting.
ACI 309R (1996) Consolidation of Concrete.
ACI 325.6R (1988) Texturing Concrete Pavements.
ACI 325.9R (1991) Guide for Construction of Concrete Pavements and Concrete Bases.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 31/C 31M (2000) Making and Curing Concrete Test Specimens in the Field.
ASTM C 33 (1999ael) Concrete Aggregates.
ASTM C 42 (1994) Obtaining and Testing Drilled Cores and Sawed Beams of Concrete.
ASTM C 78 (1994) Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading).
ASTM C 94/C 94M (2000) Ready-Mixed Concrete.
ASTM C 117 (1995) Materials Finer than 75-Micrometer (No. 200) Sieve in Mineral Aggregates by Washing.
ASTM C 123 (1998) Lightweight Pieces in Aggregate.
ASTM C 127 (2001) Specific Gravity and Absorption of Coarse Aggregate.
ASTM C 131 (1996) Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine.
ASTM C 142 (1997) Clay Lumps and Friable Particles in Aggregates.
ASTM C 143/C 143M (2000) Slump of Hydraulic Cement Concrete.
ASTM C 150 (2000) Portland Cement.
Section 02751 2
ASTM C 171 (1997a) Sheet Materials for Curing Concrete.
ASTM C 172 (1999) Sampling Freshly Mixed Concrete.
ASTM C 173 (1994) Air Content of Freshly Mixed Concrete by the Volumetric Method.
ASTM C 227 (1990) Potential alkali reactivity of cement-aggregate combination (mortar-bar method).
ASTM C 231 (1997el) Air Content of Freshly Mixed Concrete by the Pressure Method.
ASTM C 260 (2000) Air-Entraining Admixtures for Concrete.
ASTM C 309 (1998a) Liquid Membrane-Forming Compounds for Curing Concrete.
ASTM C 494/C 494M (1999a) Chemical Admixtures for Concrete.
ASTM C 535 (1996el) Resistance to Degradation of Large-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine.
ASTM C 618 (2000) Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Concrete.
ASTM C 989 (1999) Ground Granulated Blast-Furnace Slag for Use in Concrete and Mortars.
ASTM D 75 (1997) Sampling Aggregates.
ASTM D 4791 (1999) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate
ITALIAN/EUROPEAN HARMONIZATION STANDARDS (UNI EN ISO)
UNI EN 12350-2 (2009) Testing fresh concrete – Slump Test
UNI EN 12350-7 (2009) Testing fresh concrete - Part 7: Air content - Pressure methods
EN 206:2013+A1 (2016) Concrete - Specification, performance, production and conformity
ITALIAN LAWS
D.M. 17 Jan 2018 Technical Rules for Construction
Law Decree n.81 09 April 2008 Unified Text, Safety Regulations; realization of Article 1 of the Law 03 Aug 2007, n. 123, in the area of safeguarding the health and safety on the work place
UNIFIED FACILITIES CRITERIA
U.F.C. 3-260-02 (2001) Pavement Design for Airfield
Section 02751 3
UNIFIED FACILITIES GUIDE SPECIFICATIONS
U.F.G.S. 32-13-14.13 (2017) Concrete Paving for Airfield and Other Heavy Duty Pavements
OTHER
Aviano Design Guide (2017 Revision)
1.2 SUBMITTALS
Product Data:
− Curing materials − Admixtures
Design Data:
− Mix design
At least 30 days prior to the mixing and placing of concrete, submit mix design for approval. Furnish a complete list of materials including type, brand, source and amount of cement, fly ash, pozzolan, admixtures, aggregates, and applicable reference specifications. Obtain acknowledgement of approvals prior to concrete placement. Submit a new mix design for each material source change.
Test Reports:
− Aggregate tests − Concrete slump tests − Air content tests − Pavement thickness tests − Flexural strength tests − Submit testing results as required in paragraph entitled "Field − Quality Control in Part 3 of this section."
Certificates:
− Ready-mixed concrete plant identification − Batch ticket information − Cementitious Material − Aggregates − Admixtures − Curing materials
Closeout Submittals:
− Control charts − Submit copies weekly.
1.3 DELIVERY, STORAGE, AND HANDLING
Section 02751 4
1.3.1 Cement and Fly Ash
Store immediately upon receipt. Store bagged material in a dry weathertight ventilated structure.
Stack bags close together to reduce circulation of air but do not stack against outside walls. Transfer bulk material to weatherproof bins. Test cement stored longer than 6 months by standard mortar tests or loss on ignition tests to determine whether suitable for use. Do not use such cement without approval of the Contracting Officer’s Technical Representative.
1.3.2 Aggregates
Sufficient aggregate shall be stored at the site at all times to permit continuous, uninterrupted operation of the mixing plant while concrete is being placed. Store aggregates in a manner to minimize segregation and prevent contamination. Store different sizes in separate piles. Stockpile coarse aggregates in thin, horizontal layers with no cone stockpiling permitted. Should coarse aggregates become segregated, remix stockpile to conform to the specified grading requirements.
1.3.3 Admixtures
Store admixture in undamaged containers which will prevent evaporation.
Retest air-entraining admixture stored longer than 6 months or which has been subject to freezing.
Do not use admixtures stored longer than 15 months.
1.4 EQUIPMENT
Maintain all equipment in satisfactory working condition throughout the length of the contract.
1.4.1 Slipform and Fixed Form Pavers
Use equipment designed to spread, consolidate, screed, and float finish the freshly placed concrete in one pass requiring a minimum of hand finishing.
1.4.2 Curing Compound Spray Equipment
Self-propelled, with spraying nozzles and pressure that can be controlled and operated with a fine nozzle to completely and uniformly cover pavement surface with required amount of curing compound. Mechanically agitate curing compound throughout application. Small or irregular areas may be sprayed by hand methods.
1.5 QUALITY ASSURANCE
1.5.1 Required Data
Submit name and location of the ready-mixed concrete plant. Submit batch ticket information as specified in ASTM C 94.
PART 2 - PRODUCTS
2.1 MATERIALS
2.1.1.1 Cement
− ASTM C 150 Type I, II or III. ASTM C 595M, Type IS or IP.
Section 02751 5
2.1.1.2 Fly Ash
− ASTM C 618 Class F.
2.1.2 Water
− ASTM C 94.
2.1.3 Aggregates
2.1.3.1 Alkali Reactivity Test
Fine and coarse aggregates to be used in all concrete shall be evaluated and tested by the Contractor for alkali-aggregate reactivity in accordance with ASTM C 1260. The coarse and fine aggregates shall be evaluated separately, in accordance with ASTM C 1260, and in combination, which match the Contractor's proposed mix design proportioning, utilizing the modified version of ASTM C 1260.
Test results of the combination shall have a measured expansion of less than 0.08 percent at 16 days.
Should the test data indicate an expansion of greater than 0.08%, the aggregate(s) shall be rejected and the Contractor shall submit new aggregate sources for retesting.
2.1.3.2 Fine Aggregates
− ASTM C 33.
2.1.3.3 Coarse Aggregates
− ASTM C 33, maximum size No. 57 or 25 mm except as otherwise modified herein.
a. Abrasion loss shall not exceed 40 percent for aggregates tested in accordance with ASTM C 131 or ASTM C 535.
b. Aggregates shall be gravel, crushed gravel, or crushed stone.
c. Specific gravity not less than 2.55, saturated-surface-dry (SSD).
Provide aggregate tests in conformance with ASTM C 127.
d. Furnish coarse aggregate in at least two separate sizes with separation at the 19 mm sieve when combined material graded from 4.75 mm to 37.5 mm nominal maximum size is specified. When the nominal maximum size of aggregate is 25 mm or less, such separation is not necessary.
e. Deleterious Substances: Requirements of Table 3 as given in ASTMC 33 apply, except deleterious substances in coarse aggregate shall not exceed the following percentages by weight:
(1) Clay Lumps and Friable Particles: 1.0 percent when tested in accordance with ASTM C 142.
(2) Lightweight Pieces: 1.0 percent when tested in accordance with ASTM C 123, ASTM C 989.
When blast furnace slag is used, unit weight shall control.
(3) Materials Finer than 75 micrometers No. 200 Sieve: 1.0 percent when tested in accordance with ASTM C 117.
Section 02751 6
(4) Flat and Elongated Particles: 5 to 1 ratio with a total of 15 percent when tested in accordance with ASTM D 4791.
2.1.3.4 Heat Resistant Concrete Aggregates
Both coarse and fine aggregates shall meet the above specifications but shall be a diabased, intrusive igneous rock or expanded shole lightweight aggregate.
2.1.4 Admixtures
Where not shown or specified, admixtures may be used subject to written approval of the Contracting Officer’s Technical Representative.
2.1.4.1 Air-Entraining Admixtures
− ASTM C 260.
2.1.4.2 Retarding Admixtures
− ASTM C 494/C 494M, Type B or D.
2.1.4.3 Water-Reducing Admixtures
− ASTM C 494/C 494M, Type A, D, E, F or G.
2.1.4.4 Accelerating Admixtures
− ASTM C 494/C 494M, Type C.
2.1.4.5 Fly Ash and pozzolans
ASTM C 618 Class N, F, or C except that the maximum allowable loss on ignition shall be 6 percent for Class N and F.
2.1.5 Curing Materials
2.1.5.1 Waterproof paper
ASTM C171, fiber reinforced, light colored, non-staining two ply kraft papers.
2.1.5.2 Polyethylene Sheeting
ASTM C171, white color with a minimum sheet thickness of 0.25 mm.
2.1.5.3 White-Burlap-Polyethylene Sheet
ASTM C 171, 0.10 mm thick white opaque polyethylene bonded to 0.31 kg per meter (1.0 m) wide burlap.
2.1.5.4 Liquid Membrane-Forming Compound
ASTM C 309, white-pigmented Type 2, Class B, or clear or translucent Type 1-D, Class B with white fugitive dye.
2.1.6 Joints, Reinforcement and Mooring Eyes
Provide as specified in Section 02762N, "Joints, Reinforcement, and Mooring Eyes in Concrete Pavements."
Section 02751 7
2.2 CONCRETE MIX DESIGN
2.2.1 Contractor-Furnished Concrete Mix Design
Contractor-furnished mix design concrete shall be designed in accordance with ACI 211.1 except as modified herein, and the mix design shall be as specified herein under paragraph entitled "Submittals". The concrete shall have a minimum flexural strength of 4481 kPa at 28 days. The air content shall be 5.5 plus or minus 1.5 percent. Maximum size aggregate for slip forming shall be 38
mm. The minimum cement factor and slump shall be as follows:
Method of Finishing to be Used
Minimum Cement Factor, kg Per Cubic Meter
Aggregate Size
25 mm
Range in Slump (mm)
Machine finish with-out vibration
368 50 to 75 mm
Machine finish, with vibration (except slip form)
340 25 to 50 mm
Hand tools 396 75 to 100 mm
Slip form 340 0 to 25 mm
The cement factors given in the foregoing table are minimum; if they are not sufficient to produce concrete of the flexural strength required, they shall be increased as necessary, without additional compensation under the contract. The cement factor shall be calculated using cementitious material, including pozzolan, fly ash and or slag. The slump will be determined by ASTM C 143/C 143M and shall be within the ranges given herein; the exact slump shall be as approved by the Contracting Officer’s Technical Representative. Obtain acknowledgement of receipt prior to beginning any concrete work. Approved admixtures shall be used in proportions recommended by the manufacturer to obtain the optimum effect, with seasonal atmospheric and job conditions considered. If modifications to the mix are required, a new mix shall be submitted for approval. It will not be necessary to submit additional data regarding aggregate unless the source has changed.
2.3 FIXED FORMS
Use metal forms free from irregularities, bulges, warps, dents, and sags. Top face of form shall not vary by more than 3 mm in 3 meters and lateral variation shall be less than 6 mm in 3 meters.
Use forms sufficiently strong to resist pressure of concrete and loads resulting from finishing operations without springing, settling, or losing their shape. Clean forms before reuse. Before placing concrete, coat contact surfaces of forms with a non-staining release agent.
Section 02751 8
PART 3 - EXECUTION
3.1 PREPARATION
Before placing concrete, bring base surface to finish grade and elevations as shown. Moisten underlying material in advance of placing concrete to ensure a firm, moist condition at time concrete is placed. Do not permit equipment other than concrete delivery or paving equipment on prepared underlying material. In cold weather protect underlying material from frost. Do not use chemicals to eliminate frost. Maintain drainage ditches, gutters and side drains to drain the base during construction.
3.1.1 Base for Fixed Form Construction
Finish to the design profile. Test prepared surfaces with a template. Do not vary surface of base material more than 12 mm from indicated elevations.
3.1.2 Base for Slipform Construction Finish to the design profile. Do not vary surface of base material more than 12 mm from indicated elevations. Minimum width of sub-base shall be 600 mm greater on each side than the width of the paving to accommodate the slipform equipment tracks.
Grade and elevation control of the slip form paver shall be by string line.
3.2 FIXED FORMS
Set forms for full bearing on foundation for entire length and width and in alignment with edge of finished pavement. Support forms during entire operation of placing, compaction, and finishing so that forms will not deviate vertically more than 3 mm from required grade and elevations indicated. Maximum vertical deviation of top of any side form, including joints, shall not exceed 3 mm from a 3 meters straightedge, nor shall inside face vary more than 6 mm from a 3 meters straightedge. Provide stake sockets and interlocking devices that will prevent movement of the form.
3.3 JOINTS, REINFORCEMENT AND MOORING EYES
Place joints, welded wire fabric and mooring eyes in accordance with Section 02762, "Joints, Reinforcement, and Mooring Eyes in Concrete Pavements."
3.4 MEASURING AND MIXING
3.4.1 Site Mixing
ACI 325.9R.
3.4.2 Ready-Mixed Concrete
ASTM C 94/C 94M, except as modified herein. Begin mixing within 30 minutes after cement has been added to aggregates. Additional water may be added to bring slump within required limits as specified in Section 11.7 of ASTM C 94/C 94M, provided that specified water-cement ratio is not exceeded.
3.5 CONVEYING AND PLACING CONCRETE
3.5.1 Placing
ACI 325.9R, except as modified herein. Place concrete continuously at a uniform rate, with a minimum amount of segregation, without damage to the grade and without unscheduled stops except for equipment failure or other emergencies. If an emergency stop does occur within 3 meters of a previously placed expansion joint, remove concrete back to joint, repair any damage to grade, install
Section 02751 9 a construction joint and continue placing concrete only after cause of emergency stop has been corrected.
3.5.1.1 Cold Weather
ACI 306R. High-early-strength-concrete shall be maintained above freezing for a period greater than one-quarter of the period specified for Portland cement concrete or a minimum of 48 hours.
3.5.1.2 Hot Weather
ACI 305R.
3.5.2 Consolidation
ACI 309R, Chapter 11.
3.5.3 Protection Against Rain
ACI 325.9R, Chapter 10.4.
3.6 FINISHING
Start finishing operations immediately after consolidation. Use finishing machine, except that hand finishing may be used in emergencies and for concrete slabs that are of shapes or locations that are not accessible with a finishing machine. Finishing operations shall not displace coarse aggregate from surface and shall produce a surface of uniform texture true to grade and design profile. Excessive operation over an area, which results in an excess of mortar and water being brought to the surface, will not be permitted. Finish pavement surface on both sides of a joint to the same grade. Finish transverse joints from a securely supported transverse bridge.
3.6.1 Fixed Form Finishing
Maintain travel of machine on forms without vertical movement which will affect precision of concrete finish. Keep form tops clean by a device attached to the machine. Finish concrete flush with top of forms.
3.6.2 Slip-Form Finishing
Remove concrete slurry from vertical edges of slip-formed concrete using stiff brushes or other approved scrapers. Do not use concrete slurry to build up edges of concrete to compensate for edge slump. In locations where sloughing occurs, attach temporary forms to underlying material in the proper location and correct defective edges. Such procedures are to be used sparingly. Should excessive sloughing occur, halt operations until proper corrective adjustments have been made.
3.6.2.1 Edge Slump
Determine slump of edges with a 3.66 meter straightedge. Before the concrete hardens, correct edge slump of pave exceeding 6 mm at edge of pavement. The area affected by the downward movement of the concrete along the pavement edge shall be limited to not more than 450 mm from the edge.
3.6.3 Hand Finishing and Floating
As soon as placed and consolidated, strike off and screed concrete to required cross section.
If necessary, place and screed additional concrete and float until a satisfactory surface has been
Section 02751 10 produced. Advance floating operation not more than half the length of the float and then continue over new and previously floated surfaces. Hand finishing shall be limited to small irregular areas not accessible with finishing machine.
3.6.4 Surface Correction and Testing
After finishing is completed but while concrete is still plastic, use straightedges to eliminate minor irregularities and score marks. Use straightedges 3 meters in length and operated from sides of pavement and from bridges. Equip a straightedge operated from side of pavement with a handle 0.91 meters longer than one-half the width of pavement. Check surface for trueness with straightedge held in successive positions parallel and at right angles to center line of pavement, with whole area covered to detect variations. Advance straightedge along pavement in successive stages of not more than one-half the length of the straightedge.
Immediately fill depressions with freshly mixed concrete, strike off, consolidate, and refinish.
Strike off and refinish projections above required elevation. Continue straightedge testing and finishing until entire surface of concrete is free from observable departure from straightedge.
3.6.5 Texturing
ACI 325.6R. Before surface sheen has disappeared and before concrete becomes nonplastic, give the pavement surface a texture as specified in paragraph entitled "Surface Finish."
3.6.6 Surface Finish
3.6.6.1 Artificial Turf
Before concrete becomes non-plastic, finish surface by dragging a strip of clean, artificial turf 600 mm wider than pavement.
Select dimensions so that at least 600 mm of material in the direction of travel is in contact with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .