ATTACH_4_-_CONSTRUCTION_SCHEDULE.pdf

PDF 267 KB Posted

Attached to
WA-25-002 AML 750 Valley View Place SW
Solicitation number
140S0325B0007
Issued by

About this file

The document is a construction schedule for the 750 Valley View Place Reclamation Project, identified by OSMRE contract number WA-25-001 and project code H&A 0202993-016. The 25-day schedule outlines a phased approach for roadway reconstruction, including excavation in two phases, geosynthetic placement, backfilling, compaction, surfacing, and pavement installation. Key activities include mobilizing equipment, site preparation, asphalt demolition in Phases I and II, placing crushed surfacing base course, installing new Hot Mix Asphalt (HMA) pavement, replacing curbs, site restoration, and final site walkthrough. The detailed timeline provides a day-by-day breakdown of construction tasks, showing the sequential progression of work across multiple project stages.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

750 Valley View Place Reclamation Project

OSMRE WA-25-001, H&A 0202993-016

Construction Schedule

Date

Feature Item Work Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

IS-010

Excavate in roadway prism within Phase I Place geosynthetic and backfill layers, and compact backfill within Phase I

Excavate in roadway prism within Phase II Place geosynthetic and backfill layers, and compact backfill within Phase II Place and compact crushed surfacing base course

Place and compact new Hot Mix Asphalt (HMA) pavement

Replace asphalt and concrete curb in-kind, as needed

Restore site

Demobilize and abandon site

Final Site Walk Valley View Place SW - Partial Closure Days

Mobilize equipment

Access site and prepare work area (staging, TESC, etc.)

Demolish asphalt within Phase I

Demolish asphalt within Phase II

Haley Aldrich 0202993-0116/IS010_Engineers_Estimate_2025.07.21.xlsx - Construction Schedule_blank