Attach 4- 24r11 Interview Questions.pdf
PDF 13 KB Posted
- Solicitation number
- FA875124R0011
About this file
This document is a Notice of Intent for an Architect/Engineer (A/E) firm to provide design and construction administration services for mechanical, electrical, and plumbing (MEP) projects at the Air Force Research Laboratory (AFRL) in Rome, NY.
The Air Force intends to issue a firm fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract with a five-year ordering period. The maximum ordering amount is $2,000,000. The services may include engineering studies, plans, specifications, cost estimates, as-built drawings, and post-construction services for new construction, remodeling, and maintenance projects. The Government will evaluate firms based on past performance, professional qualifications, specialized experience, capacity, locality knowledge, and volume of DoD work. Firms must submit a completed SF330 by 3:00 PM on August 10, 2024 for consideration. The award will be made to the most highly qualified firm.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 1- 24r11 SOW.pdf | ||
| Attach 3- Evaluation Parameters.pdf | ||
| Attach 2- 24r11 SF330.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERVIEW QUESTIONS
1. Will you be using any sub-consultants for support, or do you have full in-house capability?
2. How does your firm expect to support the requirement for Construction Administration Services?
3. What is your firm’s current workload, and do you anticipate hiring new staff to support our contract?
4. Who will be the program manager for our contracts? (Note: We will expect a consistent presence throughout all contracts from this individual.)
5. Can we expect a relatively consistent project team?
6. What is the average dollar amount of a typical project for your firm?
7. What is the dollar amount of the smallest project your firm has ever designed?
Note: We have past experience with poor performance or non-performance on smaller projects. We may have several smaller projects and expect to receive the same level of service for all work performed under this contract?
8. As a percentage, what would you say is the average cost of construction modifications in comparison to the total cost of the projects you have designed in the past? (Excluding customer scope changes.)
9. Briefly describe a recent project which demonstrates any one of the following:
successful reuse of recovered materials, waste reduction or energy efficiency.
10. Would you like to point out any salient features which set your firm apart from the others?
File details come from the government source that posted it. Updated .