Attach 3 Schedule of Items Quote Sheet.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Wrangell Cabin Maintenance 2022 Federal contract opportunity
- Solicitation number
- 1240BF22Q0070
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240BF22Q0070 RFQ Wrangell Cabin Maint 2022.pdf | ||
| Attach 1 PWS Wrangell Cabin Maintenance 2022.pdf | ||
| APPENDIX 1 Wrangell Cabin Location Map.pdf | ||
| Attach 2 WD 2015-5685 R17 03.15.2022 SE AK.pdf | ||
| APPENDIX 2 Cabin Inspection Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS QUOTE SHEET
Wrangell Cabin Maintenance Services 2022
| 1240BF22Q0070 | |||||
| Company Name: | |||||
| Point of Contact (POC): | |||||
| CAGE Code: | |||||
| UEI Number: | please start using this number | ||||
| DUNS Number: | this number will no longer be used | ||||
| Address: | |||||
| Phone: | |||||
| E-mail: | |||||
| Fax | |||||
| Base Item Number | Description | Quantity | Unit of Issue | Unit Price | Total |
| 0001 | Deep Bay Cabin Services | 1 | Lump Sum | $0.00 | |
| 0002 | Steamer Cabin Services | 1 | Lump Sum | $0.00 | |
| 0003 | Frosty Cabin Services | 1 | Lump Sum | $0.00 | |
| 0004 | Harding Cabin Services | 1 | Lump Sum | $0.00 | |
| 0005 | Berg Bay Cabin Services | 1 | Lump Sum | $0.00 | |
| 0006 | Garnet Cabin Services | 1 | Lump Sum | $0.00 | |
| 0007 | Mount Rynd Cabin Services | 1 | Lump Sum | $0.00 | |
| 0008 | Twin Lake Cabin Services | 1 | Lump Sum | $0.00 | |
| 0009 | Shakes Slough Cabin #1 Services | 1 | Lump Sum | $0.00 | |
| 0010 | Shakes Slough Cabin #2 Services | 1 | Lump Sum | $0.00 | |
| 0011 | Mount Flemer Cabin Services | 1 | Lump Sum | $0.00 | |
| 0012 | Mallard Slough Cabin Services | 1 | Lump Sum | $0.00 | |
| Option Item Number: | |||||
| 0013 | Sergief Cabin Services | 1 | Lump Sum | $0.00 | |
| 0014 | Little Dry Island Cabin Services | 1 | Lump Sum | $0.00 | |
| 0015 | Gut Island Cabin #1 Services | 1 | Lump Sum | $0.00 | |
| 0016 | Gut Island Cabin #2 Services | 1 | Lump Sum | $0.00 | |
| 0017 | Koknuk Cabin Services | 1 | Lump Sum | $0.00 |
| Grand Total: | $0.00 | |
| Notes: |
Sheet1
| BASE YEAR | |||||||||
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | ||||
| 0002 | Category I Administrative Buildings | ||||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | |||||||||
| Period of Performance: 11 months (Base Year) | |||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||||||
| 0002AA | Category I Administrative Buildings Rest Room Cleans | 2,620,889 | sq. ft | $ 0.0408 | $ 106,932.25 | *55,026x47.63= 2,620,888.58 SF (11month period) | 55026.0041990342 | 52 | 2,861,352.22 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | 0 | 52 | 0.00 | ||||||
| Period of Performance: 11 months (Base Year) | 0 | 52 | 0.00 | ||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ERROR:#VALUE! | 52 | ERROR:#VALUE! | |||
| 0002AB | Category I Administrative Buildings Hard Floor Cleans | 6,586,752 | sq. ft | $ 0.0231 | $ 152,153.97 | *94,515x47.63= 4,501,749.45 SF | 138289.986773042 | 52 | 7,191,079.31 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | 0 | 52 | 0.00 | ||||||
| Period of Performance: 11 months (Base Year) | 0 | 52 | 0.00 | ||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ERROR:#VALUE! | 52 | ERROR:#VALUE! | |||
| 0002AC | Category I Administrative Buildings Carpet Floor Cleans | 1,204,420 | sq. ft | $ 0.0192 | $ 23,124.87 | *19,831x47.63= 944,550.53 SF | 25287.0098677304 | 52 | 1,314,924.51 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | $ 282,211.10 | 0 | 52 | 0.00 | |||||
| Period of Performance: 11 months (Base Year) | 0 | 52 | 0.00 | ||||||
| 0 | 52 | 0.00 | |||||||
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | 52 | 0.00 | ||
| 0003 | Category II Child Development Facilities | 52 | 0.00 | ||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | 52 | ||||||||
| Period of Performance: 11 months (Base Year). | |||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||||||
| 0003AA | Category II Child Development Facilities Hard Floor Cleans | 11,485,212 | sq. ft | $ 0.0252 | $ 289,427.35 | *390,060x238.15weeks = 9,302,139 SF | TOTAL: 11,485,212.42 SF | ||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | *7,639x285.78 weeks = 2,183,073 SF | ||||||||
| Period of Performance: 11 months (Base Year) | |||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||||||
| 0003AB | Category II Child Development Facilities Carpet Floor Cleans | 685,729 | sq. ft | $ 0.0194 | $ 13,303.14 | *1113x238.15 weeks = 265,060.95 SF | TOTAL: 685,729.11 | ||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | *1472x285.78 weeks = 420,668.16 SF | ||||||||
| Period of Performance: 11 months (Base Year) | $ 302,730.50 |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | |||
| 0004 | Category III Physical Fitness Centers | |||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year). | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0004AA | Category III Physical Fitness Centers Hard Floor Cleans | 3,010,146 | sq. ft | $ 0.0344 | $ 103,549.02 | Bldg 3452(6W) 1,330,305.90 SF | 1W*Hockey 1,323x17.32 = 22,914.36 SF | 1,330,305.90 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | Bldg 3709 (7W) 1,416,325.68 SF | 6W*Hockey 1,323x30.31= 240,600.00 SF | 1,416,325.68 | |||||
| Period of Performance: 11 months (Base Year). | 22,914.36 | |||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | 240,600.00 | ||||
| 0004AB | Category III Continuous Cleaning Physical Fitness Center Bldg 3709 | 11 | monthly | $ 4,322.26 | $ 47,544.86 | Total Hours 1,657.05 | Provide locker room cleaning from 13:00-15:30 daily 1Male/1Female 2-1/2 hours each. | 3,010,145.94 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year). |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 0005 | Special /Emergency/Bio-Hazard Cleans | ||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | |||||
| Period of Performance: 11 months (Base Year). | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0005AA | Special Cleaning | 40,538 | per sq. ft | $ 0.28 | $ 11,472.25 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 20% of the total square footage for the contract. | |||||
| Period of Performance: 11 months (Base Year). |
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0005AB | Emergency Cleaning | 22,296 | per sq. ft | $ 0.38 | $ 8,405.59 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Emergency Cleaning CLIN represents 11% of the total square footage for the contract. | |||||
| Period of Performance: 11 months (Base Year). | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0005AC | Bio-Hazard Cleaning | 10,134 | per sq. ft | $ 1.13 | $ 11,471.69 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 5% of the total square footage for the contract. | |||||
| Period of Performance: 11 months (Base Year). |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 0006 | CONTRACT MANPOWER REPORTING | 1 | EA | $ 100.0000 | $ 100.0000 |
| Contractor Manpower Reporting Costs: 1 May 2016 to 30 March 2017. The Contractor Manpower Reporting requirement is associated with the Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) requirement to obtain better visibility of the Contractor service workforce. | |||||
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| BASE YEAR TOTAL COST: | $ 767,485.01 |
File details come from the government source that posted it. Updated .