Attach 3_PPQ.pdf
PDF 161 KB Posted
- Attached to
- Fire Alarm, Mass Notification, Fire Suppression Inspection/Testing/Maintenance Federal contract opportunity
- Solicitation number
- FA875122R0003
About this file
This solicitation requests proposals for fire alarm, mass notification, and fire suppression inspection, testing, and maintenance services. Offerors must provide pricing on a firm fixed price basis for the base year and four option years. Proposals are due by December 24, 2021 and the contract is set aside for SDVOSB. The work will be performed at the Air Force Research Laboratory in Rome, New York. The government will evaluate proposals based on technical acceptability, price, and past performance. The incumbent contractor must demonstrate the ability to submit electronic invoices. The anticipated period of performance is January 1, 2022 through December 31, 2022 for the base year with four additional option years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Building 2 FAC.pdf | ||
| Fire Supression - All Buidlings.pdf | ||
| Building 106 FAC.pdf | ||
| Building 101 FAC.pdf | ||
| B1609 Upper Mezz Sprinkler Plan.PNG | PNG image | |
| B1609 First Floor Fire Alarm System.PNG | PNG image | |
| Building 1 FAC.pdf | ||
| Building 3 FAC.pdf | ||
| Building 1480 FAC.pdf | ||
| Building 1477 FAC.pdf | ||
| B1609 First Floor Sprinkler Plan.PNG | PNG image | |
| B1609 Upper and Lower Mezzanine Fire Alarm Sys.PNG | PNG image | |
| B1610 Fire Pump Details.PNG | PNG image | |
| B1609 LowerMezz Sprinkler Plan.PNG | PNG image | |
| Attach 4_Bid Schedule.pdf | ||
| Attach 1_Fire Alarm_MNS_ Fire Suppression PWS.pdf | ||
| Attach 2_Offeror Representations and Certifications.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE QUESTIONNAIRE
WHEN FILLED IN THIS DOCUMENT IS
SOURCE SELECTION SENSITIVE INFORMATION
SEE FAR 2.101 AND FAR 3.104
FA875122R0003 Attachment 3
INSTRUCTIONS FOR OFFEROR
1. Offerors will complete Section A of the questionnaire (Pages 2 & 3) for each reference and include with their proposal. The offeror will submit Section B of the questionnaire directly to their references and request the reference return the questionnaire directly to the Contract Specialist identified below. Offeror will complete Block 2 of Section B (Contract number and Program Name) before submitting to their references.
PROPOSAL RESPONSE DATE: TBA
CONTRACT SPECIALIST
NAME: LEENA BUDHU
TEL: (315) 330-2557
EMAIL: leenawattie.budhu.1@us.af.mil mailto:leenawattie.budhu.1@us.af.mil
SOURCE SELECTION SENSITIVE INFORMATION
SEE FAR 2.101 AND FAR 3.104
SECTION A:
Offerors will complete Section A of the questionnaire (Pages 2 & 3) for each reference and include with their proposal.
1. COMPANY NAME/ REFERENCE NAME: __________________________________________
ADDRESS: ____________________________________________________________________
TEL: ___________________________ FAX: _____________________________
EMAIL: ____________________________________________________________________
2. CONTRACT #: _______________________PROGRAM NAME:____________________________
3. CONTRACTING OFFICER (IF DIFFERENT FROM REFERENCE): ________________________
ADDRESS: ____________________________________________________________________
TEL: ___________________________ FAX: _____________________________
EMAIL: ____________________________________________________________________
4. CONTRACT TYPE: Firm-Fixed Price Cost-Reimbursement Other (describe)
5. DESCRIPTION OF WORK: _______________________________________________________
6. BRIEF DESCRIPTION OF THE EFFORT Prime ____ or Subcontractor ____
SOURCE SELECTION SENSITIVE INFORMATION
SEE FAR 2.101 AND FAR 3.104
7. AWARD DATE: _______________ ___ SCHEDULED COMPLETION: ___________________
CURRENT / FINAL COMPLETION DATE (if different): _________________________________
8. AMOUNT PER YEAR: ___________________ CONTRACT TOTAL AMOUNT: ____________________
CURRENT / FINAL AMOUNT (if different): _________________________________________________
9. COMMENTS REGARDING COMPLIANCE WITH CONTRACT TERMS AND CONDITIONS
10. COMMENTS REGARDING ANY KNOWN PERFORMANCE DEEMED UNACCEPTABLE TO THE
CUSTOMER, OR NOT IN ACCORDANCE WITH THE CONTRACT TERMS AND CONDITIONS
11. LIST ALL MAJOR SUBCONTRACTORS THAT WORKED ON REFERENCED PROJECT, IN WHAT
TRADE, AND WHAT PERCENTAGE OF WORK DONE:
WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IN
ACCORDANCE WITH FAR 3.104
Past Performance Questionnaire
SECTION B: Past performance reference completes this entire Past Performance Questionnaire section.
INSTRUCTIONS FOR REFERENCE
You have been identified as a past performance reference for solicitation FA875122R0003 Fire Alarm, Mass Notification & Fire Suppression Inspection, Testing & Maintenance (ITM) at the Air Force Research Laboratory, Rome NY. In order for the Government to evaluate the past performance of the Offeror identifying you as a reference, please complete Section B of this Past Performance Questionnaire, then return it to the Contract Specialist below. The Contract Number and Program Name provided by the Offeror are found in Block #2 below. If the Offeror performed additional contracts for your organization, please provide past performance information on those contracts as well.
RESPONSE DATE: TBA
LEENA BUDHU, CONTRACT SPECIALIST
AFRL/RIKO
26 ELECTRONIC PKWY
ROME NY 13441-4514
TEL: (315) 330-2557
E-MAIL: leenawattie.budhu.1@us.af.mil
The individual knowledgeable of the contractor’s day-to-day operations and overall performance should complete this questionnaire. However, that individual is encouraged to supplement their own knowledge of the contractor’s performance with the judgment of others within their organization, as applicable. Thank you for your assistance.
1. NAME: ____________________________________________________________________
POSITION: ____________________________________________________________________
ADDRESS: ____________________________________________________________________
TEL: ___________________________ FAX: _____________________________
EMAIL: ____________________________________________________________________
2. CONTRACT #: _______________________PROGRAM NAME:___________________________
3. RELATIONSHIP AND TIME INVOLVED WITH OFFEROR:
4. WHAT, IF ANY, ELEMENTS OF WORK WERE SUBCONTRACTED? PLEASE ESTIMATE
THE PERCENTAGE OF THE TOTAL WORK THAT WAS SUBCONTRACTED?
mailto:leenawattie.budhu.1@us.af.mil
ACCORDANCE WITH FAR 3.104
SECTION B, CONTINUED: Please rate the offeror’s performance using the scale below.
E VG S M U N
Exceptional Very Good Satisfactory Marginal Unsatisfactory Neutral
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor were effective.
Performance meets contractual requirements.
The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
does not meet some contractual requirements.
The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
was not observed or not applicable to the current effort being reported against.
EVALUATION AREAS
I. Quality E VG S M U N
1.
Contractor provided effective quality control and inspection procedures that resulted in a quality-finished project.
2. Contractor developed and submitted realistic progress goals.
3. Contractor provided materials and products that met or exceeded contract requirements.
4.
Contractor completed all work with good workmanship and in conformance with the specifications, resulting in minor, if any, punch list items.
5.
Performance was cost effective. There were minimal cost increases to the original negotiated amount. If there were significant changes, please explain below.
ACCORDANCE WITH FAR 3.104
FA875122R0003 Attachment 3
Comments:
II. Timely Performance E VG S M U N
Contractor met established frequency requirements to complete the project on time and to ensure quality results.
2.
Contractor performed all work without the issuance of a cure notice or show cause letter. (If a notice was issued, please describe the circumstances in the comments section and identify how the situation was resolved.)
3. Contractor provided timely proposals and responses to contract changes, if any.
4. Contractor submitted progress schedules and interim progress reports, as required, in a timely manner.
5. Contractor provided submittals on time as required.
6. Contractor provided timely resolution of all punch list items.
III. Management Effectiveness E VG S M U N
Contractor provided experienced, qualified managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
2. Contractor hired quality subcontractors and effectively managed and coordinated their work.
4.
Contractor ensured the site superintendent had sufficient authority to make decisions and take actions during project performance to keep the project on schedule.
5. Contractor provided timely and satisfactory response to warranty issues after project completion.
6. Contractor paid employees/subcontractors/suppliers fully and on time.
7.
Contractor cooperated to resolve problems, attended meetings, and maintained effective communication to ensure satisfactory resolution.
ACCORDANCE WITH FAR 3.104
FA875122R0003 Attachment 3
IV. Contract Administration E VG S M U N
1. Contractor provided complete and correct documentation in a timely manner.
2.
Contractor was responsive during contract performance on administrative issues.
V. Compliance with Safety Standards E VG S M U N
1. Adequacy of Safety Plan.
2. Implementation of Safety Plan.
3.
Safe work habits demonstrated through proper and adequate use of protective equipment and job site protection to maintain accident-free work zone.
4. Response to incidents was timely, reports were made as required, and collateral risk was mitigated promptly. If no incidents for the project, write N/A.
VI. Overall Performance E VG S M U N
1. Please rate the contractor’s overall performance.
ADDITIONAL COMMENTS (attach additional sheets as necessary):
File details come from the government source that posted it. Updated .